Skip to content

SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2

by Namdev Construction · Gurugram

Not on our price list yet

Possession 6 May 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
500–3,461 sq ft
In m²about 46–322 m², as declared
Registered by
NAMDEV CONSTRUCTION PVT. LTD.the company that filed it, for Namdev Construction
Timeline
  1. 7 May 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 5 Aug 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Jan 2025Registration valid toHARERA, read 4 Nov 2026
  4. 6 May 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

358homes, 500 to 3,461 sq ft of carpet area
  • Under 1,000 sq ft500–760 sq ft336
  • 2,000–2,500 sq ft2,117–2,230 sq ft8
  • 2,500–3,000 sq ft2,712–2,743 sq ft8
  • 3,000 sq ft and above3,025–3,461 sq ft6

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 3 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.598 acres in all, by use
  • Apartment buildings2.247 acres · 86%
  • Shops and offices0.351 acres · 14%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningLiving, dining & bedrooms
  • KitchenWhite WASH / OBD
  • LiftsBranded make
  • FloorsIPS flooring / tiles /wooden flooring / imported marble
  • WallsWhite WASH / OBD
  • BathroomsEauset
  • WindowsSingle glass unit with clear glass UPVC/AL frames and shutters in habitable rooms. clear/frosted glass in toilets
  • Main doorPRE-laminated flush door/hdhmr door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: GUAL PAHARI

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Questions buyers ask

Is SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/660/392/2023/04. The register’s record shows an end date of 30 Jan 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 6 May 2025. Its registration runs to 30 Jan 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2?From the records · HARERA, read 4 Nov 2026

SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2 is in Gurugram; the site address declared to HARERA is Gual Pahari. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2?From the records · HARERA, read 4 Nov 2026

SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2 is a Namdev Construction project, registered by its company NAMDEV CONSTRUCTION PVT. LTD..

The source ↗Namdev Construction's projects and court record

The records

What the registers hold for SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/660/392/2023/04: Registration lapsed. The register’s record shows an end date of 30 Jan 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 21 OF 2021 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 4 Jan 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 May 2021, building plans 5 Aug 2021.Declared to HARERA, read 29 Oct 2026
The court record of Namdev Construction’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Jan 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 21 OF 2021 validity ended

    Named in this project’s application. Valid to 4 Jan 2024. The register links a completion certificate (LC-IX), dated 1 Sep 2023, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 47 HARERA files, with the dates we read them
Registration no.
GGM/660/392/2023/04
Registration valid till
30 Jan 2025
Declared possession
6 May 2025

Declared by the promoter to HARERA

Land area
2.5981 (Acre) (10,514.14 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
21 0f 2021 dated 07.05.2021
Estimated project cost
₹187.53 crore
Cost of land
₹45.89 crore
Layout plan, declared approved (field 5a)
7 May 2021
Building plans, declared approved
5 Aug 2021
Construction to start
1 Oct 2021
Completion declared for
6 May 2025
Declared inventory · 14 types

Declared inventory — 14 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 72 units · 70.61 sq m carpet · 18 towers
  • Apartment/Shops/Other Buildings · 184 units · 46.45 sq m carpet · 46 towers
  • Apartment/Shops/Other Buildings · 80 units · 52.03 sq m carpet · 20 towers
  • Apartment/Shops/Other Buildings · 2 units · 196.67 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 2 units · 203.16 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 207.22 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 6 units · 251.97 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 2 units · 254.86 sq m carpet · 1 tower
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (7 May 2021)
  • II. ZONING — declared: already been obtained (9 Jul 2021)
  • III. FOREST NOC — declared: already been obtained (1 Oct 2018)
  • IV. NATURAL CONSERVATION ZONE NOC — declared: already been obtained (28 Aug 2021)
  • V. WILD LIFE NOC — declared: already been obtained (15 Feb 2021)
  • VI. SERVICE PLAN ESTIMATES APPROVAL — declared: already been obtained (28 Jul 2021)
  • VII. BUILDING PLAN APPROVAL — declared: already been obtained (5 Aug 2021)
  • VIII. ENVIRONMENT CLEARANCE — declared: already been obtained (26 Nov 2021)
  • IX. ROADS ACCESS PERMISSION — declared: already been obtained (9 Aug 2022)
  • X. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (22 Mar 2021)
On file with HARERA · 47 files

On file with HARERA (47)

Plans

Site plan

2 files
Site Plan6 Jan 2023Approved Site Plan2 Nov 2022

Layout plan

1 file
Latest Layout Plan1 Nov 2022

Zoning plan

1 file
Zoning Plan6 Jan 2023

Demarcation plan

1 file
Demarcation Plan6 Jan 2023

Building plans

17 files
BR-III Commercial6 Jan 2023Terrace & Mumty Plan6 Jan 2023BR III Plot No B 100 to B1106 Jan 2023

Floor plans

4 files
Basement & Stilt Plan6 Jan 2023First Floor & Second Floor6 Jan 2023Third Floor & Fourth Floor6 Jan 2023Fifth Floor & Sixth Floor6 Jan 2023

Services

Sewerage and drainage

2 files
Service Drawing- Sewage6 Jan 2023Service Drawing- Drainage6 Jan 2023

Water supply

2 files
Service Drawing- Irrigation6 Jan 2023Service Drawing- Water Supply6 Jan 2023

Roads

1 file
Service Drawing- Road Layout6 Jan 2023

Service plans

4 files
Service Estimates Scheme Booklet6 Jan 2023Service Drawing- Streelight6 Jan 2023Service Estimate Approval Letter6 Jan 2023Service Plans on the Layout2 Nov 2022

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule6 Jan 2023LOI6 Jan 2023LC IV6 Jan 2023

Environment clearance

1 file
Environment Clearance6 Jan 2023

Fire safety

1 file
Fire Scheme Approval Commercial6 Jan 2023

Land records

Land records

2 files
Sajra Superimposed Layout Plan6 Jan 2023Revenue Record Entry of Licence and Collaboration2 Nov 2022

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures2 Nov 2022Cash Flow Statement2 Nov 2022Non-Default Certificate from a CA1 Nov 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Jan 2023

Other filings

Other filings

1 file
Area Diagram Sheet6 Jan 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

21 OF 2021 · Namdev Construction Pvt. Ltd. · GWAL PAHARI

Licence valid to 4 Jan 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Nov 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

21 OF 2021: 16 parcels, 9.5 acres in all, in Gwal pahari (hadbast 77), tehsil Wazirabad.

The licence register prints the same licensed area, 9.5 acres.

  • 7//25/15 kanal 17 marla
  • 7//25/22 kanal 3 marla
  • 7//25/31 kanal 1 marla
  • 14//14/29 marla
Show the other 12 parcels
  • 14//157 kanal 8 marla
  • 14//167 kanal 8 marla
  • 14//178 kanal
  • 14//248 kanal
  • 14//5/25 kanal
  • 14//67 kanal 8 marla
  • 27//14/1/11 marla
  • 27//14/1/32 kanal 7 marla
  • 27//15/13 kanal 13 marla
  • 27//16/1/21 kanal 5 marla
  • 27//48 kanal
  • 27//78 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gwal pahari (hadbast 77), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 7//25/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan6 Jan 2023Approved Site Plan2 Nov 2022

Layout plan

1 file
Latest Layout Plan1 Nov 2022

Building plans

17 files
BR-III Commercial6 Jan 2023Terrace & Mumty Plan6 Jan 2023BR III Plot No B 100 to B1106 Jan 2023BR III Plot No B88 to B996 Jan 2023BP Drawing Type IV Plot NO.B61TO 83 & B88 to B110 (2OF2)6 Jan 2023BR III Plot No B72 to B836 Jan 2023

Floor plans

4 files
Basement & Stilt Plan6 Jan 2023First Floor & Second Floor6 Jan 2023Third Floor & Fourth Floor6 Jan 2023Fifth Floor & Sixth Floor6 Jan 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (47 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2180 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Namdev Construction

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.