TARC ISHVA

by TARC · Gurugram

Not on our price list yet

Possession 31 Dec 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,562–3,526 sq ft
In m²about 145–328 m², as declared
Registered by
TARC LIMITEDthe company that filed it, for TARC
Timeline
  1. 14 Aug 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

386homes, 1,562 to 3,526 sq ft of carpet area
  • 1,500–2,000 sq ft1,562–1,658 sq ft136
  • 2,000–2,500 sq ft2,079–2,157 sq ft244
  • 3,000 sq ft and above3,526 sq ft6

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 72 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.95 acres in all, by use
  • Roads3.143 acres · 45%
  • Parks and playgrounds1.903 acres · 27%
  • Apartment buildings0.829 acres · 12%
  • Other uses0.623 acres · 9%
  • Club house0.292 acres · 4%
  • Electricity sub-station0.161 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVariable RATE FLOW system
  • KitchenSingle lever counter top
  • Lifts2 passenger lifts serving every apartment
  • FloorsTile/wooden flooring/marble
  • WallsAcrylic emulsion paint
  • BathroomsChinaware , single lever counter top
  • WindowsWindows- aluminium powder coated sections
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 63A GURUGRAM

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is TARC ISHVA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/865/597/2024/92. Valid to 31 Dec 2031.

The source ↗
What is the possession timeline for TARC ISHVA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Dec 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around TARC ISHVA?From the records · HARERA, read 4 Nov 2026

TARC ISHVA is in Gurugram; the site address declared to HARERA is Sector 63a Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building TARC ISHVA?From the records · HARERA, read 4 Nov 2026

TARC ISHVA is a TARC project, registered by its company TARC LIMITED.

The source ↗TARC's projects and court record

The records

What the registers hold for TARC ISHVA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/865/597/2024/92: Registered. Valid to 31 Dec 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 137 OF 2023 is on the DTCP register, valid to 4 Jul 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 14 Aug 2024.Declared to HARERA, read 29 Oct 2026
The court record of TARC’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 64 HARERA files, with the dates we read them
Registration no.
GGM/865/597/2024/92
Registration valid till
31 Dec 2031
Declared possession
31 Dec 2031

Declared by the promoter to HARERA

Land area
6.9500 (Acre) (28,125.65 sq m)
FAR
3.15 proposed of 3.15 permissible
licence
137 of 2023 Date 05.07.2023
Estimated project cost
₹1259.49 crore
Cost of land
₹25.40 crore
Building plans, declared approved
14 Aug 2024
Construction to start
1 Sept 2024
Completion declared for
31 Dec 2031
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 145.1 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 151.52 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 40 units · 154.02 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 68 units · 147.6 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 193.18 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 24 units · 195.33 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 214 units · 200.35 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 327.58 sq m carpet · 3 towers · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. WATER SUPPLY — declared: already been obtained (25 Aug 2023)
  • II. SEWAGE DISPOSAL — declared: already been obtained (23 Aug 2023)
  • III. STORM WATER DRAINAGE — declared: already been obtained (23 Aug 2023)
  • IV. ELECTRICAL LOAD — declared: already been obtained (24 Nov 2023)
  • V. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (28 Mar 2023)
  • VI. FOREST NOC — declared: already been obtained (15 Nov 2022)
  • VII. POWER LINE SHIFTING NOC — declared: already been obtained (10 Nov 2022)
  • VIII. HUDA CONSTRUCTION — declared: already been obtained (10 Oct 2023)
  • IX. BUILDING PLAN — declared: already been obtained (14 Aug 2024)
On file with HARERA · 64 files

On file with HARERA (64)

Plans

Site plan

2 files
Sizera Plan Overlap Site Plan3 Sept 2024Approved Site Plan3 Sept 2024

Layout plan

1 file
Latest Layout Plan3 Sept 2024

Zoning plan

1 file
Zoning Plan3 Sept 2024

Demarcation plan

1 file
Demarcation Plan3 Sept 2024

Building plans

15 files
Briii3 Sept 2024T-5-E-2 Elevation3 Sept 2024T-5-E-2 Elevation3 Sept 2024

Floor plans

2 files
B-2 Parking3 Sept 2024B-1 Parking3 Sept 2024

Services

Sewerage and drainage

2 files
Assurance for Storm Water Connection1 Aug 2024Assurance for Sewerage Connection1 Aug 2024

Water supply

1 file
Water Assurance PDF3 Sept 2024

Electricity

1 file
Electrica Load Availability1 Aug 2024

Service plans

1 file
Service Plans on the Layout3 Sept 2024

Approvals and clearances

DTCP licence

4 files
Addendum to the Registration Certificate-Additional Licenses and Revision in Building Plans15 Apr 2026Licence Copy with Land Schedule9 Aug 2024LC-IV2 Aug 2024LOI2 Aug 2024

Other NOCs and clearances

3 files
Power Shifting Line NOC2 Aug 2024Forest NOC1 Aug 2024AAI NOC1 Aug 2024

Land records

Land records

8 files
Non Encumbrance Certificate3 Sept 2024Land Title Search Report3 Sept 2024Information of Revenue Department3 Sept 2024

Money

Accounts and finance

5 files
Tarc CA Certificate Incurred Cost3 Sept 2024Tarc CA Certificate (Inventory)3 Sept 2024Cash Flow Statement3 Sept 2024

The promoter’s papers

Declarations and affidavits

3 files
Bank Affidavit3 Sept 2024Bank Undertaking3 Sept 2024The Promoter’s Declaration on Affidavit9 Aug 2024

Other filings

Other filings

14 files
T-1-P-33 Sept 2024Transfer Deed- 63 A3 Sept 2024T-3-P-23 Sept 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

137 OF 2023 · TARC Limited · GURGAON-MANESAR

Licence valid to 4 Jul 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Aug 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

137 OF 2023: 8 parcels, 6.95 acres in all, in Madabass (hadbast 85), tehsil Badshahpur.

The licence register prints the same licensed area, 6.95 acres.

  • 46//22/2/27 kanal
  • 46//23/27 kanal 11 marla
  • 46//24/26 kanal 10 marla
  • 48//2/27 kanal 19 marla
Show the other 4 parcels
  • 48//38 kanal
  • 48//43 kanal 4 marla
  • 48//87 kanal 8 marla
  • 48//98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 85), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 46//22/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Sizera Plan Overlap Site Plan3 Sept 2024Approved Site Plan3 Sept 2024

Layout plan

1 file
Latest Layout Plan3 Sept 2024

Building plans

15 files
Briii3 Sept 2024T-5-E-2 Elevation3 Sept 2024T-5-E-2 Elevation3 Sept 2024T-5-E-1 Elevation3 Sept 2024E-1 Elevation3 Sept 2024E-2 Elevation3 Sept 2024

Floor plans

2 files
B-2 Parking3 Sept 2024B-1 Parking3 Sept 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (64 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3042 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on TARC

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.