Skip to content

TATHASTU II

by Desi Construction · Gurugram

Not on our price list yet

Possession 31 Oct 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Registered by
DESI CONSTRUCTION PRIVATE LIMITEDthe company that filed it, for Desi Construction
Timeline
  1. 23 Jan 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Oct 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 14 Nov 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8.975 acres in all, by use
  • Apartment buildings2.357 acres · 26%
  • Roads2.244 acres · 25%
  • Green belts1.652 acres · 18%
  • Pavements1.346 acres · 15%
  • Parking0.85 acres · 9%
  • Parks and playgrounds0.341 acres · 4%
  • Sewage and waste treatment0.099 acres · 1%
  • Electricity sub-station0.087 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWalls - oil bound distemper, flooring - vitrified tiles
  • LiftsISI marked
  • FloorsBedrooms, kitchen- vitrified tiles , toilets, balcony - ceramic tiles , staircase - tile/ stone
  • WallsExternal walls - texture paints ,internal walls - oil bound distemper
  • BathroomsISI marked standard washbasin ,WC
  • WindowsTinted glass/ performance glass
  • Main doorFlushdoor
  • Electrical fittingsSwitches - modular switch

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 5, VILLAGE SOHNA

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Questions buyers ask

Is TATHASTU II registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/677/409/2023/21. Valid to 14 Nov 2027.

The source ↗
What is the possession timeline for TATHASTU II?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2027. Its registration runs to 14 Nov 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around TATHASTU II?From the records · HARERA, read 4 Nov 2026

TATHASTU II is in Gurugram; the site address declared to HARERA is Sector 5, Village Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building TATHASTU II?From the records · HARERA, read 4 Nov 2026

TATHASTU II is a Desi Construction project, registered by its company DESI CONSTRUCTION PRIVATE LIMITED.

The source ↗Desi Construction's projects and court record

The records

What the registers hold for TATHASTU II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/677/409/2023/21: Registered. Valid to 14 Nov 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 188 OF 2022 is on the DTCP register, valid to 15 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Jan 2023, building plans 23 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Desi Construction’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
GGM/677/409/2023/21
Registration valid till
14 Nov 2027
Declared possession
31 Oct 2027

Declared by the promoter to HARERA

Land area
8.975 (Acre) (36,320.54 sq m)
FAR
the application prints 240, which is not a ratio
licence
188 of 2022
Estimated project cost
₹361.45 crore
Cost of land
₹6.29 crore
Layout plan, declared approved (field 5a)
23 Jan 2023
Building plans, declared approved
23 Jan 2023
Construction to start
1 Mar 2023
Completion declared for
31 Oct 2027
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1,240 units · 74,397.78 sq m carpet · 6 towers
  • Apartment/Shops/Other Buildings · 208 units · 3,705.011 sq m carpet · 2 towers
  • Apartment/Shops/Other Buildings · 1 unit · 1,270.53 sq m carpet · 1 tower
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. BR III (ZP-1677/JD(RA)2023/2180 — declared: already been obtained (23 Jan 2023)
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

1 file
Approved Site Plan25 Jan 2023

Layout plan

1 file
Latest Layout Plan25 Jan 2023

Zoning plan

1 file
Zoning Plan25 Jan 2023

Demarcation plan

1 file
Demarcation Plan25 Jan 2023

Building plans

1 file
Elevation Plan25 Jan 2023

Floor plans

6 files
Floor Plan25 Jan 2023Apartment Plan25 Jan 2023Apartment Plan 125 Jan 2023

Services

Sewerage and drainage

2 files
Sewerage and Garbage Disposal Plan25 Jan 2023Strom Water Drainage Plan25 Jan 2023

Water supply

2 files
Water Supply Plan25 Jan 2023Assurance for Fresh Water Supply25 Jan 2023

Roads

1 file
Road and Pavement Plan25 Jan 2023

Service plans

1 file
Service Plans on the Layout13 Jan 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule13 Jan 2023

Other NOCs and clearances

2 files
Treated Water NOC25 Jan 2023NOC Electricity25 Jan 2023

Sales papers

Allotment and sale agreements

2 files
Annexure-A BBA25 Jan 2023Allotment Letter25 Jan 2023

Money

Accounts and finance

4 files
Non-Default Certificate from a CA25 Jan 2023CA Certificate on the Application’s Figures25 Jan 2023CA Certificate for Cost Incurred25 Jan 2023Cash Flow Statement25 Jan 2023

The promoter’s papers

Declarations and affidavits

8 files
Undertaking Fire Scheme Approval25 Jan 2023Undertaking Environmental Clearance25 Jan 2023Acknowledgement with Undertaking Fire Scheme Approval25 Jan 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

188 OF 2022 · Desi Construction Pvt. Ltd. · SOHNA

Licence valid to 15 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Jan 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

188 OF 2022: 10 parcels, 8.975 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 8.975 acres.

  • 134//128 kanal
  • 134//188 kanal
  • 134//198 kanal
  • 134//23/14 kanal 16 marla
Show the other 6 parcels
  • 141//137 kanal 16 marla
  • 141//88 kanal
  • 134//23/23 kanal 4 marla
  • 134//248 kanal
  • 141//38 kanal
  • 141//48 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 134//12.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan25 Jan 2023

Layout plan

1 file
Latest Layout Plan25 Jan 2023

Building plans

1 file
Elevation Plan25 Jan 2023

Floor plans

6 files
Floor Plan25 Jan 2023Apartment Plan25 Jan 2023Apartment Plan 125 Jan 2023Floor Plan 125 Jan 2023Floor Plan 225 Jan 2023Parking Plan25 Jan 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2296 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Desi Construction

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.