THE AERTH

by Boxacres Developers · Gurugram

Not on our price list yet

Possession 30 Apr 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 889 sq ft
In m²about 82.6 m², the average flat, as declared
Registered by
BOXACRES DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Boxacres Developers
Timeline
  1. 1 May 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.597 acres in all, by use
  • Other uses1.756 acres · 38%
  • Roads1.076 acres · 23%
  • Parks and playgrounds0.798 acres · 17%
  • Apartment buildings0.768 acres · 17%
  • Green belts0.094 acres · 2%
  • Parking0.082 acres · 2%
  • Pavements0.025 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningLG/ samsung/ voltas or equivalent brand
  • KitchenModular kitchen with granite/ engineered stone top including SS sink (double bowl) including hob & chimney ,RO ,microwave, refrigerator, dishwasher
  • Kitchen appliancesModular kitchen with granite/ engineered stone top including SS sink (double bowl) including hob & chimney ,RO ,microwave, refrigerator, dishwasher
  • LiftsLifts with audio and visual signage and signalling systems
  • WardrobesPremium brands for modular wardrobe.
  • FloorsPremium vitrified anti skid tiles
  • WallsPremium acrylic emulsion paint
  • BathroomsBranded quality fittings and fixtures

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE NAURANGPUR, SECTOR-79

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is THE AERTH registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1076/808/2026/48. Valid to 30 Apr 2033.

The source ↗
What is the possession timeline for THE AERTH?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2033. Its registration runs to 30 Apr 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE AERTH?From the records · HARERA, read 4 Nov 2026

THE AERTH is in Gurugram; the site address declared to HARERA is Village Naurangpur, Sector-79. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE AERTH?From the records · HARERA, read 4 Nov 2026

THE AERTH is a Boxacres Developers project, registered by its company BOXACRES DEVELOPERS PRIVATE LIMITED.

The source ↗Boxacres Developers's projects and court record

The records

What the registers hold for THE AERTH: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1076/808/2026/48: Registered. Valid to 30 Apr 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 22 OF 2026 is on the DTCP register, valid to 29 Jan 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 1 May 2026.Declared to HARERA, read 29 Oct 2026
The court record of Boxacres Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 81 HARERA files, with the dates we read them
Registration no.
GGM/1076/808/2026/48
Registration valid till
30 Apr 2033
Declared possession
30 Apr 2033

Declared by the promoter to HARERA

Land area
4.5968 (Acre) (18,602.59 sq m)
FAR
2.39 proposed of 2.4 permissible
licence
22 OF 2026 DATED 30.01.2026
Estimated project cost
₹439.93 crore
Cost of land
₹51.53 crore
Building plans, declared approved
1 May 2026
Construction to start
1 Jun 2026
Completion declared for
30 Apr 2033
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 352 units · 29,261.83 sq m carpet · 4 towers · total for 352 flats, about 83.1 m² each
  • Apartment/Shops/Other Buildings · 10 units · 634 sq m carpet · 1 tower · total for 10 flats, about 63.4 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE: 22 OF 2026 DATED 30.01.2026 — declared: already been obtained (30 Jan 2026)
  • II. AIRPORT HEIGHT CLEARANCE AAI/R.H.Q/NR/AVM/NOC/2026/41/127-130 — declared: already been obtained (6 Jan 2026)
  • III. FOREST NOC KMM-8ND-PU6U — declared: already been obtained (18 Aug 2025)
  • IV. ZONING CUM DEMARCATION — declared: already been obtained (30 Jan 2026)
  • V. FIRE SCHEME APPROVAL — declared: already been obtained (29 May 2026)
  • VI. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (11 Jun 2026)
  • VII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (13 Mar 2026)
  • VIII. SERVICE PLAN ESTIMATE APPROVAL — declared: applied for but yet to receive (20 May 2026)
On file with HARERA · 81 files

On file with HARERA (81)

Plans

Site plan

2 files
Site Plan Showing Green and Parking10 Jul 2026Approved Site Plan2 May 2026

Layout plan

1 file
Latest Layout Plan2 May 2026

Zoning plan

1 file
Zoning Plan24 Apr 2026

Demarcation plan

1 file
Superimposed Demarcation Plan10 Jul 2026

Building plans

11 files
Section Yy and Zz (Tower-A and B)10 Jul 2026Tower C and D Section at X-X10 Jul 2026Tower A B and C Elevation at 1 and 210 Jul 2026

Floor plans

11 files
Second Basement Floor Plan10 Jul 2026First Basement Floor Plan10 Jul 2026Tower B Typical Floor Plan10 Jul 2026

Services

Sewerage and drainage

2 files
Assurance for Supply of Water and Sewer Line10 Jul 2026Assurance Storm Water GMDA10 Jul 2026

Water supply

1 file
Assurance Water Supply GMDA10 Jul 2026

Electricity

1 file
Electric Load Availability10 Jul 2026

Service plans

1 file
Service Estimate Applied Copy10 Jul 2026

Approvals and clearances

DTCP licence

3 files
LC IV10 Jul 2026LOI10 Jul 2026Licence Copy with Land Schedule24 Apr 2026

Environment clearance

1 file
EC Application10 Jul 2026

Fire safety

1 file
Fire Scheme Approval10 Jul 2026

Other NOCs and clearances

4 files
NOC Forest Officer10 Jul 2026Assurance Construction Water NOC10 Jul 2026Height Clearance10 Jul 2026Non Applicable Permissions10 Jul 2026

Land records

Land records

11 files
Mutation10 Jul 2026Power of Attorney10 Jul 2026SPA10 Jul 2026

Sales papers

Brochure and specifications

1 file
Brochure10 Jul 2026

Money

Accounts and finance

6 files
Financial Statements10 Jul 2026Non-Default Certificate from a CA10 Jul 2026CA Certificate for Financial & Inventory Details10 Jul 2026

Timeline and progress

Construction schedule

1 file
PERT Chart10 Jul 2026

The promoter’s papers

Declarations and affidavits

12 files
Undertaking Auto Credit10 Jul 2026Bank Undertaking10 Jul 2026Affidavit Mining10 Jul 2026

Company papers

1 file
MOA & AOA10 Jul 2026

Other filings

Other filings

8 files
Revocation Deed10 Jul 2026Boxacres Developers-Master Data10 Jul 2026Clarification Aura World Realty10 Jul 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

22 OF 2026 · Boxacres Developers Private Limited · GURGAON-MANESAR

Licence valid to 29 Jan 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 May 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

22 OF 2026: 10 parcels, 4.5969 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 4.5968 acres.

  • 51//17/31 kanal 5 marla
  • 51//24/25 kanal 8 marla
  • 51//25/11 kanal 8 marla
  • 51//25/2/24 kanal 18 marla
Show the other 6 parcels
  • rectangle 51, kila 17/2 min1 kanal 15 marla
  • 55//4/25 kanal 8 marla
  • 55//58 kanal
  • 52//21/2/21 kanal 8 marla
  • 54//1/23 kanal 16 marla
  • rectangle 54, kila 1/1 min3 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 51//17/3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Showing Green and Parking10 Jul 2026Approved Site Plan2 May 2026

Layout plan

1 file
Latest Layout Plan2 May 2026

Building plans

11 files
Section Yy and Zz (Tower-A and B)10 Jul 2026Tower C and D Section at X-X10 Jul 2026Tower A B and C Elevation at 1 and 210 Jul 2026Sanction Letter10 Jul 2026Elevation Plan10 Jul 2026Section Plan10 Jul 2026

Floor plans

11 files
Second Basement Floor Plan10 Jul 2026First Basement Floor Plan10 Jul 2026Tower B Typical Floor Plan10 Jul 2026Floor Plans10 Jul 2026Tower A Typical Floor Plan10 Jul 2026Unit Details Showing Carpet Area10 Jul 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (81 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4099 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Boxacres Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.