THE ESTATE RESIDENCES

by Anant Raj · Gurugram

Not on our price list yet

Possession 31 Mar 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Registered by
ANANT RAJ LIMITEDthe company that filed it, for Anant Raj
Timeline
  1. 15 Jan 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningVRV/VRF with high wall units in living, dinning, bedrooms, utility and kitchen
  • KitchenModular kitchen with appliances as per point 6.6 in unit WISE specification, cabine TRY and SS sink
  • Kitchen appliancesHob, chimney, oven, microwave, dishwasher, refrigerator, geyser, washing machine ( in balcony)
  • LiftsBranded make
  • WardrobesModular wardrobes
  • FloorsTiles/marbles/granite/laminated wood
  • WallsOBD/SEMI-acrylic/acrylic emulsion/titles
  • BathroomsCP fitting, WASH basin, WC with accessories

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 63A GURUGRAM

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4
  • Other register states: 1

Questions buyers ask

Is THE ESTATE RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/785/517/2024/12. Valid to 31 Mar 2030.

The source ↗
What is the possession timeline for THE ESTATE RESIDENCES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2030. Its registration runs to 31 Mar 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE ESTATE RESIDENCES?From the records · HARERA, read 4 Nov 2026

THE ESTATE RESIDENCES is in Gurugram; the site address declared to HARERA is Sector 63a Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE ESTATE RESIDENCES?From the records · HARERA, read 4 Nov 2026

THE ESTATE RESIDENCES is a Anant Raj project, registered by its company ANANT RAJ LIMITED.

The source ↗Anant Raj's projects and court record

The records

What the registers hold for THE ESTATE RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/785/517/2024/12: Registered. Valid to 31 Mar 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 128 OF 2022 is on the DTCP register, valid to 23 Aug 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Jan 2024, building plans 15 Jan 2024.Declared to HARERA, read 29 Oct 2026
The court record of Anant Raj’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 82 HARERA files, with the dates we read them
Registration no.
GGM/785/517/2024/12
Registration valid till
31 Mar 2030
Declared possession
31 Mar 2030

Declared by the promoter to HARERA

Land area
5.43263 (Acre) (21,985.07 sq m)
FAR
the application prints 311.83, which is not a ratio
licence
128 of 2022
Estimated project cost
₹1074.25 crore
Cost of land
₹164.71 crore
Layout plan, declared approved (field 5a)
15 Jan 2024
Building plans, declared approved
15 Jan 2024
Construction to start
15 Feb 2024
Completion declared for
31 Mar 2030
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 248 units · 63,359.76 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 44 units · 833.388 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 97.06 sq m carpet · 1 tower
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (22 Aug 2023)
  • II. ASSURANCE FOR SUPPLY OF 3.3 KLD TREATED WATER FOR CONSTRUCTION — declared: already been obtained (22 Aug 2023)
  • III. ASSURANCE FOR ELECTRICITY SUPPLY — declared: already been obtained (14 Jun 2023)
  • IV. ASSURANCE FOR STORM WATER CONNECTION — declared: already been obtained (13 Sept 2023)
  • V. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (22 Sept 2023)
On file with HARERA · 82 files

On file with HARERA (82)

Plans

Site plan

4 files
Superimposed Site Plan -Model22 May 2024Site Plan Stilt Parking22 May 2024Site Plan External Combined Service22 May 2024Approved Site Plan16 Jan 2024

Layout plan

1 file
Latest Layout Plan23 Sept 2023

Zoning plan

1 file
Zoning Plan22 May 2024

Demarcation plan

1 file
Demarcation Plan15 Jan 2024

Building plans

8 files
Tower 1 Elevation 1 and 222 May 2024Tower 1 Sections22 May 2024Tower 1 Elevation 3 and 422 May 2024

Floor plans

42 files
EWS Tower-322 May 2024Basement-0222 May 2024Residential Tower T1 Third and Typical Floor Plan22 May 2024

Services

Sewerage and drainage

1 file
Assurance for Sewerage Connection22 May 2024

Water supply

2 files
Assurance for Water Supply22 May 2024Assurance for Water Supply of Drinking Water22 May 2024

Electricity

1 file
Assurance Certificate of Electricity22 May 2024

Landscape and green areas

1 file
Landscape Plan22 May 2024

Service plans

3 files
Community Building Service Floor Plan22 May 2024Community Building Second and Service Floor Area Diagram22 May 2024Service Plans on the Layout16 Jan 2024

Approvals and clearances

DTCP licence

3 files
LC IV Dt 20.01.202422 May 2024LOI22 May 2024Licence Copy with Land Schedule3 Aug 2023

Land records

Land records

6 files
Non Encumberance22 May 2024Search Report Dt 24.01.202422 May 2024Supplementary Collaboration Development Agreement22 May 2024

Sales papers

Allotment and sale agreements

2 files
Conveyance Deed22 May 2024Agreement to Sale22 May 2024

Money

Accounts and finance

2 files
Cash Flow Statement22 May 2024Non-Default Certificate from a CA22 May 2024

The promoter’s papers

Declarations and affidavits

2 files
Affidavit Tree Cutting22 May 2024The Promoter’s Declaration on Affidavit22 May 2024

HARERA’s orders

HARERA’s orders

1 file
Collaboration Addendum 26 Acre Revised22 May 2024

Other filings

Other filings

1 file
Igbc Rating Certificate22 May 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

128 OF 2022 · Anant Raj Ltd. · GURGAON-MANESAR

Licence valid to 23 Aug 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

128 OF 2022: 13 parcels, 5.4326 acres in all, in Ulahwas (hadbast 83), tehsil Wazirabad.

The licence register prints the same licensed area, 5.4326 acres.

  • 42//13 kanal 3 marla 7 sarsai
  • 42//13/15 kanal 19 marla
  • 42//13/215 marla
  • 42//142 kanal 19 marla
Show the other 9 parcels
  • 42//18/11 kanal 3 marla
  • 42//18/21 kanal 9 marla 4 sarsai
  • 42//19/117 marla
  • 42//19/21 kanal 19 marla
  • 42//23 kanal 3 marla 6 sarsai
  • 42//37 kanal 4 marla 3 sarsai
  • 42//4/11 kanal 9 marla
  • 42//76 kanal 13 marla
  • 42//86 kanal 14 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Ulahwas (hadbast 83), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 42//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Superimposed Site Plan -Model22 May 2024Site Plan Stilt Parking22 May 2024Site Plan External Combined Service22 May 2024Approved Site Plan16 Jan 2024

Layout plan

1 file
Latest Layout Plan23 Sept 2023

Building plans

8 files
Tower 1 Elevation 1 and 222 May 2024Tower 1 Sections22 May 2024Tower 1 Elevation 3 and 422 May 2024Site Section22 May 2024Tower 2 Terrace and Machine Plan22 May 2024Residential Tower 2 Section Plan22 May 2024

Floor plans

42 files
EWS Tower-322 May 2024Basement-0222 May 2024Residential Tower T1 Third and Typical Floor Plan22 May 2024Residential Tower-T422 May 2024Stilt Parking Level 222 May 2024Basement-01 Area Diagram22 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (82 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2567 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Anant Raj

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.