Skip to content

THE LEGACY PHASE-I

by Silverglades · Gurugram

Not on our price list yet

Possession 31 May 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,614–4,164 sq ft
In m²about 150–387 m², as declared
Registered by
SILVERGLADES HOMES LLPthe company that filed it, for Silverglades

Homes on offer

The homes the developer declared to HARERA, by size.

341homes, 1,614 to 4,164 sq ft of carpet area
  • 1,500–2,000 sq ft1,614 sq ft132
  • 2,000–2,500 sq ft2,211–2,374 sq ft136
  • 2,500–3,000 sq ft2,810 sq ft67
  • 3,000 sq ft and above3,330–4,164 sq ft6

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningRV/split AC system
  • KitchenAntislip vitrified tiles;acrylic emulsion paint, granite stone counter, single lever CP fittings & double bowl SS sink with drain board,hob and chimney, modular kitchen cabinetry
  • Kitchen appliancesModular kitchen,cabinetry, hob & chimney
  • Lifts12-18 persons approx. each lift capacity
  • WardrobesProvision
  • FloorsCombination of laminated wooden flooring , natural stone &tiles;
  • WallsCombination of acrylic emulsion paint , POP punning
  • BathroomsVanities with mirror, single lever CP fittings with WASH basin & european; WC

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE BEHRAMPUR, SECTOR 63A, GURGAON

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 2

Questions buyers ask

Is THE LEGACY PHASE-I registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/861/593/2024/88. Valid to 31 May 2031.

The source ↗
What is the possession timeline for THE LEGACY PHASE-I?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 May 2031. Its registration runs to 31 May 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE LEGACY PHASE-I?From the records · HARERA, read 3 Nov 2026

THE LEGACY PHASE-I is in Gurugram; the site address declared to HARERA is Village Behrampur, Sector 63a, Gurgaon. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE LEGACY PHASE-I?From the records · HARERA, read 3 Nov 2026

THE LEGACY PHASE-I is a Silverglades project, registered by its company SILVERGLADES HOMES LLP.

The source ↗Silverglades's projects and court record

The records

What the registers hold for THE LEGACY PHASE-I: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/861/593/2024/88: Registered. Valid to 31 May 2031.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 215 OF 2023 is on the DTCP register, valid to 22 Oct 2028.DTCP, read 3 Nov 2026
The court record of Silverglades’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 69 HARERA files, with the dates we read them
Registration no.
GGM/861/593/2024/88
Registration valid till
31 May 2031
Declared possession
31 May 2031

Declared by the promoter to HARERA

Land area
9.950 (Acre) (40,266.22 sq m)
FAR
2.08 proposed of 2.21 permissible
licence
215 of 2023
Estimated project cost
₹823.10 crore
Cost of land
₹53.84 crore
Construction to start
1 Sept 2024
Completion declared for
31 May 2031
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 132 units · 149.98 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 220.509 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 132 units · 205.433 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 309.385 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 67 units · 261.091 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 386.834 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (23 Oct 2023)
  • II. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (5 Jul 2024)
  • III. ELECTRICAL LOAD AVAILABILITY CONNECTION — declared: already been obtained (3 Jan 2024)
  • IV. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (5 Dec 2023)
  • V. DRINKING WATER SUPPLY — declared: already been obtained (4 Dec 2023)
  • VI. SEWAGE DISPOSAL — declared: already been obtained (4 Dec 2023)
  • VII. STORM WATER DRAINAGE — declared: already been obtained (4 Dec 2023)
  • VIII. NOC ARAVALI — declared: already been obtained (6 Jul 2022)
  • IX. ZONING PLAN — declared: already been obtained (18 Dec 2023)
  • X. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (26 Feb 2024)
  • XI. FOREST NOC — declared: already been obtained (15 Feb 2022)
  • XII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (18 Dec 2023)
  • XIII. SERVICE PLANS AND ESTIMATES — declared: yet to file for approval
  • XIV. FIRE SCHEME APPROVAL — declared: yet to file for approval
  • XV. MINING PERMISSION — declared: yet to file for approval
On file with HARERA · 69 files

On file with HARERA (69)

Plans

Site plan

2 files
Site Plan22 Aug 2024Approved Site Plan11 Jul 2024

Layout plan

3 files
Copy of Superimposed Demarcation Plan on Approved Layout Plan22 Aug 2024Layout Plan22 Aug 2024Latest Layout Plan11 Jul 2024

Zoning plan

2 files
Zoning Plan22 Aug 2024Zoning Plan8 Jul 2024

Demarcation plan

2 files
Demarcation Plan22 Aug 2024Demarcation Plan8 Jul 2024

Building plans

3 files
Elevation Plan22 Aug 2024X Section Plan22 Aug 2024Building Plan Approval BR-III 63A22 Aug 2024

Floor plans

1 file
Parking Plan22 Aug 2024

Services

Water supply

1 file
Drinking Water Supply11 Jul 2024

Electricity

2 files
Electrical Load Availability Connection22 Aug 2024Electrical Load11 Jul 2024

Service plans

1 file
Service Estimates Application 63A22 Aug 2024

Approvals and clearances

DTCP licence

4 files
LC-IV -63A22 Aug 2024LOI New Sector -63A22 Aug 2024Licence 63A22 Aug 2024Licence Copy with Land Schedule8 Jul 2024

Other NOCs and clearances

12 files
NOC Drinking Water -63A22 Aug 2024NOC Arawali22 Aug 2024Forest NOC22 Aug 2024

Land records

Land records

6 files
Mutation Copy22 Aug 2024Collaboration Agreement22 Aug 2024Jamabandi Copy22 Aug 2024

Sales papers

Allotment and sale agreements

2 files
Builder Buyer Agreement Draft22 Aug 2024Conveyance Deed Draft22 Aug 2024

Money

Accounts and finance

14 files
CA Certificate Inventory Details22 Aug 2024CA Certificate Non Default Payments22 Aug 2024Additional Fees DD Copy22 Aug 2024

The promoter’s papers

Declarations and affidavits

9 files
Affidavit Recipt EDC22 Aug 2024Affidavit Arrangement of Bank Accounts22 Aug 2024Affidavit Mining Permission22 Aug 2024

Other filings

Other filings

5 files
Lci- Va-63A22 Aug 2024BR RERA Reg Auth22 Aug 2024Sghllp - Bs22 Aug 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

215 OF 2023 · Pyramid & LID Realtors LLP · GURGAON-MANESAR

Licence valid to 22 Oct 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jul 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

215 OF 2023: 16 parcels, 10.4625 acres in all, in Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 10.4625 acres.

  • 20//58 kanal
  • 20//68 kanal
  • 21//18 kanal
  • 21//10/13 marla
Show the other 12 parcels
  • 21//10/23 kanal 17 marla
  • 21//10/34 kanal
  • 21//11/14 kanal
  • 21//11/24 kanal
  • 21//12/13 kanal 11 marla
  • 21//12/24 kanal 9 marla
  • 21//198 kanal
  • 21//20/14 kanal
  • 21//20/24 kanal
  • 21//98 kanal
  • rectangle 21, kila 13 min6 kanal 14 marla
  • rectangle 21, kila 18/1/2 min5 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Behrampur (hadbast 80), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 20//5.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan22 Aug 2024Approved Site Plan11 Jul 2024

Layout plan

3 files
Copy of Superimposed Demarcation Plan on Approved Layout Plan22 Aug 2024Layout Plan22 Aug 2024Latest Layout Plan11 Jul 2024

Building plans

3 files
Elevation Plan22 Aug 2024X Section Plan22 Aug 2024Building Plan Approval BR-III 63A22 Aug 2024

Floor plans

1 file
Parking Plan22 Aug 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (69 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3014 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Silverglades

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.