THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY

by Ozone Gsp Infratech Sarvome House · Faridabad

Not on our price list yet

Possession 8 Oct 2020 · as the developer declared it to HARERA

About this project

Key facts

Location
Faridabad
Carpet area
977–2,361 sq ft
In m²about 91–219 m², as declared
Registered by
OZONE GSP INFRATECHthe company that filed it, for Ozone Gsp Infratech Sarvome House
Timeline
  1. 8 May 2015Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 8 Oct 2020Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

72homes, 977 to 2,361 sq ft of carpet area
  • Under 1,000 sq ft977 sq ft12
  • 1,000–1,500 sq ft1,007–1,201 sq ft38
  • 1,500–2,000 sq ft1,519 sq ft13
  • 2,000–2,500 sq ft2,034–2,361 sq ft9

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 6 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.744 acres in all, by use
  • Apartment buildings1.735 acres · 100%
  • Shops and offices0.009 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified 600 X 600 MM tile flooring. granite counter top with sink. JAL / parco or equivalent C.P. fittings.
  • LiftsImported marble and granite combination flooring. imported marble, granite and paint finish on walls. gypsum and grid tile false ceilings. LED light fittings. modular electric switches.
  • WardrobesSKIN moulded doors & hardwood door frames.
  • FloorsVitrified tiles
  • WallsPleasing shades of acrylic emulsion paint on POP surfaces.
  • BathroomsMaster: imported marble flooring & cladding up to 2.4 meters. other: 800 X 400 MM vitrified tiles on floor. other: 800 X 400 MM vitrified tiles on the wall TILL 2.4 meters. C.P. fitting: kohler / jaquar or equivalent. chinaware: duravit / kohler or equivalent. glass cubical in all bathrooms.
  • WindowsTEAK finish flush doors & teakwood door frames
  • Main doorSKIN moulded doors & hardwood door frames.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SEC-31, FARIDABAD

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Questions buyers ask

Is THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 276 OF 2017. The register’s record shows an end date of 8 Oct 2020. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 8 Oct 2020. Its registration runs to 8 Oct 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY?From the records · HARERA, read 4 Nov 2026

THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY is in Faridabad; the site address declared to HARERA is Sec-31, Faridabad. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY?From the records · HARERA, read 4 Nov 2026

THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY is a Ozone Gsp Infratech Sarvome House project, registered by its company OZONE GSP INFRATECH.

The source ↗Ozone Gsp Infratech Sarvome House's projects and court record

The records

What the registers hold for THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 276 OF 2017: Registration lapsed. The register’s record shows an end date of 8 Oct 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 102 OF 2013 is on the DTCP register, valid to 2 Dec 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 8 May 2015.Declared to HARERA, read 29 Oct 2026
The court record of Ozone Gsp Infratech Sarvome House’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 8 Oct 2020. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 6 HARERA files, with the dates we read them
Registration no.
276 OF 2017
Registration valid till
8 Oct 2020
Declared possession
8 Oct 2020

Declared by the promoter to HARERA

Land area
1.744 (Acre) (7,057.72 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
LICENSE NO. 102 OF 2013 DATED 03.12.2013.
Estimated project cost
₹104.00 crore
Cost of land
₹12.00 crore
Building plans, declared approved
8 May 2015
Construction to start
1 Dec 2014
Completion declared for
8 Oct 2020
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 123.8 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 13 units · 141.12 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 245.73 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 12 units · 90.81 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 161.1 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 98.67 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 25 units · 111.54 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 189 sq m carpet · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE NO. 102 OF 2013 — declared: already been obtained (3 Dec 2013)
  • II. FIRE FIGHTING SCHEME — declared: already been obtained (22 Sept 2015)
  • III. CLARIFICATION REGARDING APPLICABILITY OF FOREST LAWS — declared: already been obtained (7 May 2015)
  • IV. CTE APPROVAL — declared: already been obtained (23 Feb 2016)
  • V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (22 Jan 2016)
  • VI. NOC FROM AAI — declared: already been obtained (7 Apr 2015)
On file with HARERA · 6 files

On file with HARERA (6)

Plans

Site plan

1 file
Approved Site Plan2 Jul 2019

Layout plan

1 file
Latest Layout Plan2 Jul 2019

Zoning plan

1 file
Zoning Plan7 Nov 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 Jul 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA7 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit7 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

102 OF 2013 · Ozone GSP Infratech · Faridabad

Licence valid to 2 Dec 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 14 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

102 OF 2013: 5 parcels, 1.7444 acres in all, in Etmadpur (hadbast 127), tehsil Faridabad.

The licence register prints the same licensed area, 1.74 acres.

  • 23//15/2/11 sarsai
  • 23//15/2/26 kanal 5 marla
  • 23//16/12 kanal 3 marla
  • 23//6/1/15 kanal 10 marla
Show the other 1 parcel
  • 23//6/1/21 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village: Etmadpur (hadbast 127), tehsil Faridabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//15/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Jul 2019

Layout plan

1 file
Latest Layout Plan2 Jul 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (6 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/730 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ozone Gsp Infratech Sarvome House

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.