THE RIDGE RESIDENCY BY RAJGRIHAM
by Riseonic Realty Buildcon · Nuh
Not on our price list yet
Possession 31 Jul 2031 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- RISEONIC REALTY BUILDCON PRIVATE LIMITEDthe company that filed it, for Riseonic Realty Buildcon
- 27 Jun 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Jul 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft536–646 sq ft923
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking9,026 m² · 35%
- Apartment buildings5,678 m² · 22%
- Roads5,331 m² · 21%
- Parks and playgrounds3,914 m² · 15%
- Shops and offices1,444 m² · 6%
- Land for community services, handed to the government380 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenOil bound distemper- asian paint or similar
- LiftsKONE or similar
- FloorsKajaria or equivalent tiles
- WallsOil bound distemper- asian paint or similar
- BathroomsBasic steel fitting or similar
- WindowsHardwood frame with painted/
- Main doorHardwood frame with painted/
- Electrical fittingsFor switches - 1MM, 6AMP- 2.5 MM, 16AMP- 2.5 MM, AC - 4MM, MAIN wire - 8MM (KEI wires or similar and havels swtiches or similar)
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 25, VILLAGE KHANPUR, SOHNA DISTRICT NUH (HARYANA)
The builder
- Registered, no OC or CC yet: 2
Questions buyers ask
Is THE RIDGE RESIDENCY BY RAJGRIHAM registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as HRERA-PKL-NUH-757-2025. Valid to 31 Jul 2031.
The source ↗What is the possession timeline for THE RIDGE RESIDENCY BY RAJGRIHAM?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Jul 2031. Its registration runs to 31 Jul 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around THE RIDGE RESIDENCY BY RAJGRIHAM?From the records · HARERA, read 4 Nov 2026
THE RIDGE RESIDENCY BY RAJGRIHAM is in Nuh; the site address declared to HARERA is Sector 25, Village Khanpur, Sohna District Nuh (Haryana). Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building THE RIDGE RESIDENCY BY RAJGRIHAM?From the records · HARERA, read 4 Nov 2026
THE RIDGE RESIDENCY BY RAJGRIHAM is a Riseonic Realty Buildcon project, registered by its company RISEONIC REALTY BUILDCON PRIVATE LIMITED.
The source ↗Riseonic Realty Buildcon's projects and court recordThe records
What the registers hold for THE RIDGE RESIDENCY BY RAJGRIHAM: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration HRERA-PKL-NUH-757-2025: Registered. Valid to 31 Jul 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 54 OF 2025 is on the DTCP register, valid to 16 Apr 2030.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 27 Jun 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 11 HARERA files, with the dates we read them
- Registration no.
- HRERA-PKL-NUH-757-2025
- Registration valid till
- 31 Jul 2031
- Declared possession
- 31 Jul 2031
Declared by the promoter to HARERA
- Land area
- 6.36875 (Acre) (25,773.42 sq m)
- FAR
- 2.37 proposed of 2.37 permissible
- licence
- LICENSE NO. 54 OF 2025 DATED 17-04-2030 (VALID UPTO 16-04-2030)
- Estimated project cost
- ₹243.84 crore
- Cost of land
- ₹20.00 crore
- Building plans, declared approved
- 27 Jun 2025
- Construction to start
- 1 Aug 2025
- Completion declared for
- 31 Jul 2031
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 27 units · 59.98 sq m carpet · 8 towers · one flat
- Apartment/Shops/Other Buildings · 32 units · 59.98 sq m carpet · 8 towers · one flat
- Apartment/Shops/Other Buildings · 32 units · 49.78 sq m carpet · 8 towers · one flat
- Apartment/Shops/Other Buildings · 416 units · 59.98 sq m carpet · 8 towers · one flat
- Apartment/Shops/Other Buildings · 416 units · 49.78 sq m carpet · 8 towers · one flat
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LC V- LICENSE — declared: already been obtained (17 Apr 2025)
- II. DEMARCATION CUM ZONING PLAN — declared: already been obtained (17 Apr 2025)
- III. FOREST NOC — declared: already been obtained (8 Apr 2025)
- IV. BUILDING PLANS APPROVAL — declared: already been obtained (27 Jun 2025)
On file with HARERA · 11 files
On file with HARERA (11)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileBuilding plans
1 fileApprovals and clearances
DTCP licence
1 fileMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
2 filesHARERA’s orders
HARERA’s orders
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
54 OF 2025 · Riseonic Realty Buildcon Private Limited · SOHNA
Licence valid to 16 Apr 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Panchkula bench · submitted 1 Aug 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026
Land under the licence
54 OF 2025
DTCP’s page showed no land schedule for licence 54 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (11 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3619 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Riseonic Realty Buildcon
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.