VEDATTAM

by Spj Properties · Sector 14, Gurugram

Not on our price list yet

Possession 30 Jun 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 14, Gurugram0.6 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
SPJ PROPERTIES PRIVATE LIMITEDthe company that filed it, for Spj Properties
Timeline
  1. 15 Jun 2023Layout plan approveddeclared to HARERA, read 8 Oct 2026
  2. 27 Dec 2023Building plans approveddeclared to HARERA, read 8 Oct 2026
  3. 30 Jun 2025Possession, as declareddeclared to HARERA, read 8 Oct 2026
  4. 31 Mar 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.156 acres in all, by use
  • Roads1.471 acres · 35%
  • Plots for sale1.453 acres · 35%
  • Pavements0.85 acres · 20%
  • Parking0.163 acres · 4%
  • Other usesas the form names them: Rain water0.084 acres · 2%
  • Green belts0.074 acres · 2%
  • Sewage and waste treatment0.032 acres · under 1%
  • Parks and playgrounds0.029 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsISI marked CP fitting WC & WASH basin
  • Windows"door with wooden frame, windows-aluminium powder coated/MS sections"
  • Electrical fittingsISI marked switches & sockets

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 14, GurugramSector 14, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.6 km
  • Sohna Elevated Corridor (NH-248A)3.5 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

1 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is VEDATTAM registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/775/507/2024/02. The register’s record shows an end date of 31 Mar 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for VEDATTAM?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2025. Its registration runs to 31 Mar 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VEDATTAM?From the records · Map pin and road lines, read 6 Sep 2026

VEDATTAM is in Sector 14, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Gurugram, Sector-14, Gurugram, Haryana. In a straight line it is about 0.6 km from Delhi–Gurugram–SNB RRTS, 3.5 km from Sohna Elevated Corridor (NH-248A) and 4.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VEDATTAM?From the records · HARERA, read 4 Nov 2026

VEDATTAM is a Spj Properties project, registered by its company SPJ PROPERTIES PRIVATE LIMITED.

The source ↗Spj Properties's projects and court record

The records

What the registers hold for VEDATTAM: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/775/507/2024/02: Registration lapsed. The register’s record shows an end date of 31 Mar 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 125 OF 2023, as the developer typed it: no match in the registers searched.Declared to HARERA, read 8 Oct 2026
  • Plans approved, as the developer declared: layout plan 15 Jun 2023, building plans 27 Dec 2023.Declared to HARERA, read 8 Oct 2026
The court record of Spj Properties’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Mar 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 19 HARERA files, with the dates we read them
Registration no.
GGM/775/507/2024/02
Registration valid till
31 Mar 2026
Declared possession
30 Jun 2025

Declared by the promoter to HARERA

Land area
4.15625 (Acre) (16,819.75 sq m)
FAR
the application prints 150, which is not a ratio
licence
125 of 2023 Date 15 June 2023
Estimated project cost
₹102.14 crore
Cost of land
₹63.69 crore
Layout plan, declared approved (field 5a)
15 Jun 2023
Building plans, declared approved
27 Dec 2023
Construction to start
1 Oct 2023
Completion declared for
30 Jun 2025
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LAY OUT — declared: already been obtained (15 Jun 2023)
  • II. SERVICE PLAN ESTIMATE — declared: already been obtained (12 Sept 2023)
  • III. LICENSE — declared: already been obtained (15 Jun 2023)
  • IV. STANDARD DESIGN — declared: already been obtained (27 Dec 2023)
On file with HARERA · 19 files

On file with HARERA (19)

Plans

Site plan

1 file
Approved Site Plan9 Feb 2024

Layout plan

1 file
Latest Layout Plan25 Jul 2023

Zoning plan

1 file
Zoning Plan25 Jul 2023

Demarcation plan

1 file
Demarcation Plan25 Jul 2023

Building plans

1 file
Approved Building Plans, Full Set9 Feb 2024

Services

Sewerage and drainage

2 files
Service Estimate- Storm Water Drainage6 Aug 2023Service Estimate - Sewerage Plan6 Aug 2023

Water supply

1 file
Service Estimate - Water Supply Plan6 Aug 2023

Roads

1 file
Service Estimate - Road Layout6 Aug 2023

Service plans

2 files
Service Plans on the Layout9 Feb 2024Service Estimate- Booklet6 Aug 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule25 Jul 2023

Land records

Land records

3 files
Aks-Shajra9 Feb 2024Non-Encumbrance Certificate9 Feb 2024Revenue Record Entry of Licence and Collaboration25 Jul 2023

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures9 Feb 2024Non-Default Certificate from a CA9 Feb 2024Cash Flow Statement25 Jul 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 125 OF 2023. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Aug 2023 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Feb 2024

Layout plan

1 file
Latest Layout Plan25 Jul 2023

Building plans

1 file
Approved Building Plans, Full Set9 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (19 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2561 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Spj Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.