Skip to content

WHITE LILY

by Aakarshak Realators · Sonipat

Not on our price list yet

About this project

Key facts

Registered by
AAKARSHAK REALATORS PRIVATE LIMITEDthe company that filed it, for Aakarshak Realators
Timeline
  1. 21 Jan 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2018Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Kitchen• stainless steel sink • granite counter • glazed tile DADO on wall upto 2 FEET over counter • ceramic tiles flooring
  • Kitchen appliancesStainless steel sink, mixture ETC.
  • Lifts23 lifts, capacity 15 persons
  • Floors• vitrified tiles in drawing room, bed rooms • granite flooring N common area and stair cases • wooden flooring in master bed room
  • Walls• oil bound distemper on internal walls • texture paint on external walls
  • Bathrooms• anti skid ceramic tiles • CP fittings by jaquar or equivalent • china WARE by HIND WARE or equivalent • glazed ceramic tiles on walls upto 7 FEET
  • Windows• UPVC doors & window with glazing
  • Main door• MAIN GATE – masonite SKIN doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-8, VILLAGE KAMASPUR, SONEPAT

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Questions buyers ask

Is WHITE LILY registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as HRERA-PKL-SNP-2-2018. Ended 31 Dec 2018. The register shows it as: Registration expired.

The source ↗
How is the connectivity around WHITE LILY?From the records · HARERA, read 3 Nov 2026

WHITE LILY is in Sonipat; the site address declared to HARERA is Sector-8, Village Kamaspur, Sonepat. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building WHITE LILY?From the records · HARERA, read 3 Nov 2026

WHITE LILY is a Aakarshak Realators project, registered by its company AAKARSHAK REALATORS PRIVATE LIMITED.

The source ↗Aakarshak Realators's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for WHITE LILY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-SNP-2-2018: Registration expired. Ended 31 Dec 2018.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 182 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 13 May 2019.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 21 Jan 2013, building plans 21 Jan 2013.Declared to HARERA, read 29 Oct 2026
The court record of Aakarshak Realators’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2018. HARERA Panchkula, read 3 Nov 2026. Source

  • Red flag: Licence 182 OF 2007 lapsed

    Named in this project’s application. Valid to 13 May 2019; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-SNP-2-2018
Registration valid till
31 Dec 2018

Declared by the promoter to HARERA

Land area
9.262 (Acre) (37,481.98 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
182 of 2007 Dated 14.05.2007
Estimated project cost
₹237.61 crore
Cost of land
₹29.30 crore
Layout plan, declared approved (field 5a)
21 Jan 2013
Building plans, declared approved
21 Jan 2013
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. PERMANENT ELECTRICAL CONNECTIONS — declared: already been obtained (22 Jul 2019)
  • II. PUBLIC HEALTH APPROVAL FROM HUDA — declared: already been obtained (31 Oct 2012)
  • III. ENVIRONMENT CLEARANCE — declared: already been obtained (11 Jul 2014)
  • IV. NOC FROM AIRPORT AUTHORITY — declared: already been obtained (13 Nov 2013)
  • V. SERVICE PLAN ESTIMATES — declared: already been obtained (27 Dec 2017)
  • VI. CONSENT TO ESTABLISH FROM POLLUTION CONTROL BOARD — declared: already been obtained (27 Apr 2015)
  • VII. FIRE NOC — declared: already been obtained (16 Jan 2019)
  • VIII. SANCTIONED PLANS — declared: already been obtained (23 Jan 2013)
  • IX. LIFT REGISTRATION — declared: already been obtained
  • X. CONSENT TO OPERATE — declared: applied for but yet to receive
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan23 Oct 2019

Layout plan

1 file
Latest Layout Plan23 Oct 2019

Zoning plan

1 file
Zoning Plan23 Oct 2019

Building plans

1 file
Approved Building Plans, Full Set23 Oct 2019

Approvals and clearances

Occupation certificate (OC)

2 files
OC Uploaded13 Jun 2025Occupancy Certificate23 Oct 2019

DTCP licence

1 file
Licence Copy with Land Schedule23 Oct 2019

Sales papers

Allotment and sale agreements

2 files
Draft Allotment Letter23 Oct 2019Draft ATS23 Oct 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA23 Oct 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit24 Oct 2019

Company papers

2 files
List of Directros and Authorised Signatory23 Oct 2019MOA and AOA of Company23 Oct 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

182 OF 2007 · Aakarshak Realtors · Sonipat

Licence valid to 13 May 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 24 Oct 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

182 OF 2007: 14 parcels, 9.2625 acres in all, in kamashpur (hadbast 88), tehsil Sonipat.

The licence register prints the same licensed area, 9.26 acres.

  • rectangle 77, kila 20/21 kanal 17 marla
  • rectangle 77, kila 216 kanal 16 marla
  • rectangle 78, kila 16/21 kanal 18 marla
  • rectangle 78, kila 257 kanal 4 marla
Show the other 10 parcels
  • rectangle 80, kila 17 kanal 8 marla
  • rectangle 80, kila 108 kanal
  • rectangle 80, kila 2/11 kanal 12 marla
  • rectangle 80, kila 2/26 kanal 8 marla
  • rectangle 80, kila 38 kanal
  • rectangle 80, kila 4/1/11 kanal 18 marla
  • rectangle 80, kila 4/23 kanal 16 marla
  • rectangle 80, kila 5/23 kanal 5 marla
  • rectangle 80, kila 88 kanal
  • rectangle 80, kila 98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Sonipat, then the tehsil and the village: kamashpur (hadbast 88), tehsil Sonipat. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 77, kila 20/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Oct 2019

Layout plan

1 file
Latest Layout Plan23 Oct 2019

Building plans

1 file
Approved Building Plans, Full Set23 Oct 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/697 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Aakarshak Realators

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.