ZARA FLORA

by Tedre Realcon India · Nuh

Not on our price list yet

Possession 31 Dec 2023 · as the developer declared it to HARERA

About this project

Key facts

Registered by
TEDRE REALCON INDIA PVT LTD.the company that filed it, for Tedre Realcon India
Timeline
  1. 26 May 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside24,129 m² in all, by use
  • Plots for sale12,151 m² · 50%
  • Roads5,427 m² · 22%
  • Land for community services, handed to the government2,453 m² · 10%
  • Pavements1,410 m² · 6%
  • Parks and playgrounds1,410 m² · 6%
  • Other uses1,156 m² · 5%
  • Electricity sub-station110 m² · under 1%
  • Sewage and waste treatment12 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • WallsBranded
  • BathroomsBranded
  • WindowsMS/wooden/aluminium/UPVC
  • Main doorPLY board/ partical board
  • Electrical fittingsBranded

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE RAMPUR,ATTA, SOHNA

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Questions buyers ask

Is ZARA FLORA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-NUH-269-2021. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ZARA FLORA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 31 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ZARA FLORA?From the records · HARERA, read 4 Nov 2026

ZARA FLORA is in Nuh; the site address declared to HARERA is Village Rampur,Atta, Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ZARA FLORA?From the records · HARERA, read 4 Nov 2026

ZARA FLORA is a Tedre Realcon India project, registered by its company TEDRE REALCON INDIA PVT LTD..

The source ↗Tedre Realcon India's projects and court record

The records

What the registers hold for ZARA FLORA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-NUH-269-2021: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 88 OF 2019 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 1 Aug 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 May 2020, building plans 26 May 2020.Declared to HARERA, read 29 Oct 2026
The court record of Tedre Realcon India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Panchkula, read 4 Nov 2026. Source

  • Amber flag: Licence 88 OF 2019 validity ended

    Named in this project’s application. Valid to 1 Aug 2026. The register links a completion certificate (LC-IX), dated 23 Jul 2026, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 29 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-NUH-269-2021
Registration valid till
31 Dec 2025
Declared possession
31 Dec 2023

Declared by the promoter to HARERA

Land area
5.9625 (Acre) (24,129.38 sq m)
FAR
2 proposed of 2 permissible
licence
88 of 2019(02.08.2019)
Estimated project cost
₹24.25 crore
Cost of land
₹16.38 crore
Layout plan, declared approved (field 5a)
26 May 2020
Building plans, declared approved
26 May 2020
Construction to start
1 Jan 2021
Completion declared for
31 Dec 2023
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. NOC FOR ARAVALI PROJECT PLANTATION 1992 FOR CONSTRUCTION AN AFFORDABLE PLOTTED COLONY — declared: already been obtained (7 Aug 2019)
  • II. CLARIFICATION REGARDING APPLICABILITY OF FOREST LAWS ON NON FOREST LAND — declared: already been obtained (22 Apr 2019)
  • III. ASSURANCE OF 190 KLD FRESH WATER SUPPLY FOR DRINKING AND DOMESTIC PURPOSE REQUIRED FOR CONSTRUCTION OF OUR AFFORDABLE PLOTTED COLONY PROJECT — declared: already been obtained (22 Sept 2019)
  • IV. ASSURANCE OF SEWERAGE CONNECTION FOR DISCHARGE OF 190 KLD TREATED EFFLUENT FROM OUR AFFORDABLE PLOTTED COLONY PROJECT — declared: already been obtained (22 Sept 2019)
  • V. ASSURANCE OF SUPPLY OF 50 KLD TREATED WATER REQUIRED FOR CONSTRUCTION OF OUR AFFORDABLE PLOTTED COLONY PROJECT — declared: already been obtained (22 Sept 2019)
  • VI. ASSURANCE CERTIFICATE OF DHBVN FOR 624.44KW REQUIRED DURING COMMISSIONING OF OUR AFFORDABLE PLOTTED COLONY PROJECT — declared: already been obtained (16 Sept 2019)
On file with HARERA · 29 files

On file with HARERA (29)

Plans

Site plan

4 files
External Site Plan Storm Water Layout9 Sept 2020External Site Plan Sewerage Layout9 Sept 2020External Site Plan Water Supply Layout9 Sept 2020Approved Site Plan8 Sept 2020

Layout plan

2 files
External Light and Earthpit Layout10 Sept 2020Latest Layout Plan8 Sept 2020

Zoning plan

1 file
Zoning Plan8 Sept 2020

Demarcation plan

1 file
Demarcation Plan8 Sept 2020

Building plans

2 files
Pl Flow Drawing9 Sept 2020Approved Building Plans, Full Set8 Sept 2020

Services

Electricity

2 files
External Lighting and Substation Cable Routing Layout 210 Sept 2020External Lighting and Substation Cable Routing Layout10 Sept 2020

Roads

1 file
Roads and Pavments9 Sept 2020

Service plans

1 file
Service Plans on the Layout8 Sept 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule8 Sept 2020

Land records

Land records

3 files
Land Ownership Document 19 Sept 2020Land Ownership Document 29 Sept 2020Revenue Record Entry of Licence and Collaboration8 Sept 2020

Money

Accounts and finance

6 files
Cash Flow Statement of Existing Project10 Sept 2020Non-Default Certificate from a CA10 Sept 2020CA Certificate on the Application’s Figures10 Sept 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit8 Sept 2020

Company papers

1 file
Certificate of Incorporation8 Sept 2020

HARERA’s orders

HARERA’s orders

1 file
Extension RC Approved13 Aug 2025

Other filings

Other filings

2 files
Balncesheet of 20168 Sept 2020Approvals8 Sept 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

88 OF 2019 · Tedre Realcon Pvt. Ltd. · SOHNA IN MEWAT

Licence valid to 1 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 10 Sept 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

88 OF 2019: 10 parcels, 5.9625 acres in all, in Rampur () (incompletely identified), tehsil Pataudi.

The licence register prints the same licensed area, 5.9625 acres.

  • rectangle 17, kila 2/22 kanal 8 marla
  • rectangle 17, kila 98 kanal
  • rectangle 17, kila 10/12 kanal
  • rectangle 17, kila 113 kanal 9 marla
Show the other 6 parcels
  • rectangle 17, kila 127 kanal 17 marla
  • rectangle 17, kila 192 kanal 2 marla
  • rectangle 17, kila 17 kanal 19 marla
  • rectangle 17, kila 10/26 kanal
  • rectangle 16, kila 62 kanal 18 marla
  • rectangle 10, kila 115 kanal 1 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Mewat, then the tehsil and the village: Rampur () (incompletely identified), tehsil Pataudi. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 17, kila 2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
External Site Plan Storm Water Layout9 Sept 2020External Site Plan Sewerage Layout9 Sept 2020External Site Plan Water Supply Layout9 Sept 2020Approved Site Plan8 Sept 2020

Layout plan

2 files
External Light and Earthpit Layout10 Sept 2020Latest Layout Plan8 Sept 2020

Building plans

2 files
Pl Flow Drawing9 Sept 2020Approved Building Plans, Full Set8 Sept 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (29 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1402 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tedre Realcon India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.