10.10 Acres Group Housing Colony
by Bestech Group · Sector 79, Gurugram
Not on our price list yet
Possession 31 Mar 2025 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- M/S BESTECH INDIA PVT. LTDthe company that filed it, for Bestech Group
- 28 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
- 16 Nov 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Sep 2024Registration valid toHARERA, read 3 Nov 2026
- 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft976 sq ft69
- 1,000–1,500 sq ft1,005–1,410 sq ft348
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 4 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads23,309 m² · 57%
- Parks and playgrounds9,263 m² · 23%
- Apartment buildings3,962 m² · 10%
- Parking2,275 m² · 6%
- Other uses1,000 m² · 2%
- Club house564 m² · 1%
- Sewage and waste treatment280 m² · under 1%
- Electricity sub-station220 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningProvision for AC
- KitchenGranite counter with stainless steel sink with modular kitchen
- LiftsHigh speed elevators
- FloorsMarble/ vitrified/ porcelain tiles/ wooden flooring/ ceramic tiles
- WallsPlaster and painted wall/ ceramic tiles with plastic emulsion paint
- BathroomsSingle lever CP fittings, wall hung WC provision of hot and cold water supply
- WindowsAluminium frames with toughened glass
- Main doorFlush panel doors
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet; it is filed under Sector 79.The site address declared to HARERA: SECTOR 79, VILLAGE NAURANGPUR, GURUGRAM
The builder
- OC or CC dispatched: 1
- Other register states: 2
Other projects nearby
Bhumiq’s projects in the same sector, Sector 79. None is placed within 3 km on the map.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| M3M India | Same sector | Under construction | ₹15,000/sq ft | 28 Feb 2031 | |
Godrej Aria & 101 [Vol. ]No photo on file yet | Wonder City Buildcon | Same sector | — | — | — |
ARAVILLENo photo on file yet | Tirupati Buildplaza | Same sector | — | — | — |
| Signature Global | Same sector | — | — | 31 Jul 2024 | |
Affordable Group Housing ProjectNo photo on file yet | Revital Reality | Same sector | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is 10.10 Acres Group Housing Colony registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as 96 OF 2017, registered on 28 Aug 2017. Ended 30 Sep 2024. The register shows it as: Registration expired.
The source ↗What is the possession timeline for 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026
10.10 Acres Group Housing Colony is in Sector 79, Gurugram; the site address declared to HARERA is Sector 79, Village Naurangpur, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026
10.10 Acres Group Housing Colony is a Bestech Group project, registered by its company M/S BESTECH INDIA PVT. LTD.
The source ↗Bestech Group's projects and court recordThe records
What the registers hold for 10.10 Acres Group Housing Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 96 OF 2017: Registration expired. Ended 30 Sep 2024.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 22 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 26 Mar 2025.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 16 Nov 2020, building plans 16 Nov 2020.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
- Registration no.
- 96 OF 2017
- Registration date
- 28 Aug 2017
- Registration valid till
- 30 Sept 2024
- Declared possession
- 31 Mar 2025
Declared by the promoter to HARERA
- Land area
- 10.10 (Acre) (40,873.25 sq m)
- FAR
- 1.84 proposed of 1.84 permissible
- licence
- Licence no 22 of 2012 dated 27-03-2012
- Estimated project cost
- ₹293.95 crore
- Cost of land
- ₹21.04 crore
- Layout plan, declared approved (field 5a)
- 16 Nov 2020
- Building plans, declared approved
- 16 Nov 2020
- Completion declared for
- 31 Mar 2025
Declared inventory · 16 types
Declared inventory — 16 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(A)-GROUND TO 19TH · 19 units · 90.629 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(B)-GROUND TO 19TH · 12 units · 90.629 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(D)-GROUND TO 19TH · 20 units · 90.629 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(E)-GROUND TO 19TH · 18 units · 90.629 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(A)-GROUND TO 19TH · 18 units · 93.397 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(B)-GROUND TO 19TH · 20 units · 93.397 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(D)-GROUND TO 19TH · 12 units · 93.397 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(E)-GROUND TO 19TH · 19 units · 93.397 sq m carpet · one flat
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. BUILDING PLAN APPROVAL — declared: already been obtained (16 Nov 2020)
- II. AIRPORT AUTHORITY OF INDIA NOC — declared: already been obtained (23 Jul 2013)
- III. LICENCE NO 22 OF 2012 — declared: already been obtained (27 Mar 2012)
- IV. ENVIRONMENT CLEARANCE — declared: already been obtained (23 Nov 2020)
- V. CONSENT TO ESTABLISH — declared: already been obtained (3 Feb 2014)
- VI. ARAVALLI CLEARANCE — declared: already been obtained (30 Oct 2013)
- VII. FOREST CLEARANCE — declared: already been obtained (21 Aug 2013)
- VIII. WILD LIFE CLEARANCE — declared: yet to file for approval (16 Aug 2013)
On file with HARERA · 16 files
On file with HARERA (16)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
2 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
22 OF 2012 · Bestech India Pvt. Ltd · GURGAON-MANESAR
Licence valid to 26 Mar 2025
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Jan 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
22 OF 2012: 15 parcels, 10.1 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.
The licence register prints the same licensed area, 10.1 acres.
- 57//10/22 kanal 17 marla
- 57//118 kanal
- 57//128 kanal
- 57//198 kanal
Show the other 11 parcels
- 57//208 kanal
- 57//218 kanal
- 57//228 kanal
- 58//15/24 kanal 9 marla
- 58//168 kanal
- 58//17/15 kanal 18 marla
- 58//24/2 min north16 marla
- 58//25/1 min north10 marla
- 58//17/21 kanal 4 marla
- 57//99 kanal
- 57//92 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 57//10/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No collector rate for a residential flat in Sector 79 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1000 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Bestech Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.