Skip to content

10.10 Acres Group Housing Colony

by Bestech Group · Sector 79, Gurugram

Not on our price list yet

Possession 31 Mar 2025 · as the developer declared it to HARERA

About this project

Key facts

Carpet area
976–1,410 sq ft
In m²about 91–131 m², as declared
Registered
28 Aug 2017
Registered by
M/S BESTECH INDIA PVT. LTDthe company that filed it, for Bestech Group
Timeline
  1. 28 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  2. 16 Nov 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2024Registration valid toHARERA, read 3 Nov 2026
  4. 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

417homes, 976 to 1,410 sq ft of carpet area
  • Under 1,000 sq ft976 sq ft69
  • 1,000–1,500 sq ft1,005–1,410 sq ft348

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 4 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside40,873 m² in all, by use
  • Roads23,309 m² · 57%
  • Parks and playgrounds9,263 m² · 23%
  • Apartment buildings3,962 m² · 10%
  • Parking2,275 m² · 6%
  • Other uses1,000 m² · 2%
  • Club house564 m² · 1%
  • Sewage and waste treatment280 m² · under 1%
  • Electricity sub-station220 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision for AC
  • KitchenGranite counter with stainless steel sink with modular kitchen
  • LiftsHigh speed elevators
  • FloorsMarble/ vitrified/ porcelain tiles/ wooden flooring/ ceramic tiles
  • WallsPlaster and painted wall/ ceramic tiles with plastic emulsion paint
  • BathroomsSingle lever CP fittings, wall hung WC provision of hot and cold water supply
  • WindowsAluminium frames with toughened glass
  • Main doorFlush panel doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet; it is filed under Sector 79.The site address declared to HARERA: SECTOR 79, VILLAGE NAURANGPUR, GURUGRAM

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

Bhumiq’s projects in the same sector, Sector 79. None is placed within 3 km on the map.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is 10.10 Acres Group Housing Colony registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 96 OF 2017, registered on 28 Aug 2017. Ended 30 Sep 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026

10.10 Acres Group Housing Colony is in Sector 79, Gurugram; the site address declared to HARERA is Sector 79, Village Naurangpur, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 10.10 Acres Group Housing Colony?From the records · HARERA, read 3 Nov 2026

10.10 Acres Group Housing Colony is a Bestech Group project, registered by its company M/S BESTECH INDIA PVT. LTD.

The source ↗Bestech Group's projects and court record

The records

What the registers hold for 10.10 Acres Group Housing Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 96 OF 2017: Registration expired. Ended 30 Sep 2024.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 22 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 26 Mar 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Nov 2020, building plans 16 Nov 2020.Declared to HARERA, read 29 Oct 2026
The court record of Bestech Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Sep 2024. HARERA Gurugram, read 3 Nov 2026. Source

  • Red flag: Licence 22 OF 2012 lapsed

    Named in this project’s application. Valid to 26 Mar 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
96 OF 2017
Registration date
28 Aug 2017
Registration valid till
30 Sept 2024
Declared possession
31 Mar 2025

Declared by the promoter to HARERA

Land area
10.10 (Acre) (40,873.25 sq m)
FAR
1.84 proposed of 1.84 permissible
licence
Licence no 22 of 2012 dated 27-03-2012
Estimated project cost
₹293.95 crore
Cost of land
₹21.04 crore
Layout plan, declared approved (field 5a)
16 Nov 2020
Building plans, declared approved
16 Nov 2020
Completion declared for
31 Mar 2025
Declared inventory · 16 types

Declared inventory — 16 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(A)-GROUND TO 19TH · 19 units · 90.629 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(B)-GROUND TO 19TH · 12 units · 90.629 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(D)-GROUND TO 19TH · 20 units · 90.629 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(E)-GROUND TO 19TH · 18 units · 90.629 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(A)-GROUND TO 19TH · 18 units · 93.397 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(B)-GROUND TO 19TH · 20 units · 93.397 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(D)-GROUND TO 19TH · 12 units · 93.397 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK(E)-GROUND TO 19TH · 19 units · 93.397 sq m carpet · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVAL — declared: already been obtained (16 Nov 2020)
  • II. AIRPORT AUTHORITY OF INDIA NOC — declared: already been obtained (23 Jul 2013)
  • III. LICENCE NO 22 OF 2012 — declared: already been obtained (27 Mar 2012)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (23 Nov 2020)
  • V. CONSENT TO ESTABLISH — declared: already been obtained (3 Feb 2014)
  • VI. ARAVALLI CLEARANCE — declared: already been obtained (30 Oct 2013)
  • VII. FOREST CLEARANCE — declared: already been obtained (21 Aug 2013)
  • VIII. WILD LIFE CLEARANCE — declared: yet to file for approval (16 Aug 2013)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan23 Jun 2021

Layout plan

1 file
Latest Layout Plan23 Jun 2021

Zoning plan

1 file
Zoning Plan23 Oct 2020

Demarcation plan

1 file
Demarcation Plan23 Jun 2021

Building plans

1 file
Approved Building Plans, Full Set23 Jun 2021

Services

Service plans

1 file
Service Plans on the Layout23 Oct 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate5 Dec 2024

DTCP licence

1 file
Licence Copy with Land Schedule23 Jun 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Jun 2021

Money

Accounts and finance

3 files
Cash Flow Statement10 Feb 2021CA Certificate on the Application’s Figures23 Oct 2020Non-Default Certificate from a CA23 Oct 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Jun 2021

HARERA’s orders

HARERA’s orders

2 files
Extension No. 02 OF 2021 DATED- 31.09.202217 Apr 2021Rejection of Application for Extension of Registration10 Sept 2020

Other filings

Other filings

1 file
PROJECT CONTINUATION-RC/REP/HARERA/GGM/96 of 2017/ 7(3)/2022/8 DATED 28.09.20221 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

22 OF 2012 · Bestech India Pvt. Ltd · GURGAON-MANESAR

Licence valid to 26 Mar 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Jan 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

22 OF 2012: 15 parcels, 10.1 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 10.1 acres.

  • 57//10/22 kanal 17 marla
  • 57//118 kanal
  • 57//128 kanal
  • 57//198 kanal
Show the other 11 parcels
  • 57//208 kanal
  • 57//218 kanal
  • 57//228 kanal
  • 58//15/24 kanal 9 marla
  • 58//168 kanal
  • 58//17/15 kanal 18 marla
  • 58//24/2 min north16 marla
  • 58//25/1 min north10 marla
  • 58//17/21 kanal 4 marla
  • 57//99 kanal
  • 57//92 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 57//10/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 79 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Jun 2021

Layout plan

1 file
Latest Layout Plan23 Jun 2021

Building plans

1 file
Approved Building Plans, Full Set23 Jun 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1000 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Bestech Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.