Skip to content

11302.54 SQ. MTRS.

by Robust Buildwell · Faridabad

Not on our price list yet

About this project

Key facts

Location
Faridabad
Carpet area
272–4,464 sq ft
In m²about 25–415 m², as declared
Registered by
ROBUST BUILDWELL PRIVATE LIMITEDthe company that filed it, for Robust Buildwell

Homes on offer

The homes the developer declared to HARERA, by size.

301homes, 272 to 4,464 sq ft of carpet area
  • Under 1,000 sq ft272–867 sq ft115
  • 1,500–2,000 sq ft1,600–1,945 sq ft177
  • 2,000–2,500 sq ft2,060 sq ft3
  • 3,000 sq ft and above4,435–4,464 sq ft6

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 6 rows of a single unit and 171 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,303 m² in all, by use
  • Apartment buildings4,598 m² · 41%
  • Roads3,775 m² · 33%
  • Other uses1,741 m² · 15%
  • Pavements736 m² · 7%
  • Electricity sub-station366 m² · 3%
  • Parking88 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningComplete provision of copper conduiting for split AC and complete provision of PVC pipe for split AC drainage
  • KitchenCeramic tile upto 2 FEET height above counter and painted with OBD/plastic emulsion above, painted/false ceiling, prepolished granite counters with stainless steel sink
  • Kitchen appliancesStainless steel sink
  • WardrobesPlastered and painted with OBD/plastic emulsion
  • FloorsVitrified tile, antiskid ceramic, glazed ceramin tile, granite/ marble flooring in stair CASE and lift lobby
  • WallsStone cladding/ACP cladding/glass/texture paint/weather proof paint or equivalent
  • BathroomsWASH basin, wall hung WC, tower RAIL, hot & cold water supply provision
  • WindowsUPVC/powder coated aluminium

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE BHATOLA, SECTOR 79, FARIDABAD

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 6

Questions buyers ask

Is 11302.54 SQ. MTRS. registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 124 OF 2017. Valid to 31 Dec 2027.

The source ↗
How is the connectivity around 11302.54 SQ. MTRS.?From the records · HARERA, read 3 Nov 2026

11302.54 SQ. MTRS. is in Faridabad; the site address declared to HARERA is Village Bhatola, Sector 79, Faridabad. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 11302.54 SQ. MTRS.?From the records · HARERA, read 3 Nov 2026

11302.54 SQ. MTRS. is a Robust Buildwell project, registered by its company ROBUST BUILDWELL PRIVATE LIMITED.

The source ↗Robust Buildwell's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for 11302.54 SQ. MTRS.: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 124 OF 2017: Registered. Valid to 31 Dec 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 17 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Mar 2020.DTCP, read 3 Nov 2026
The court record of Robust Buildwell’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 17 OF 2012 lapsed

    Named in this project’s application. Valid to 1 Mar 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 62 OF 2012 lapsed

    Named in this project’s application. Valid to 14 Jun 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
124 OF 2017
Registration valid till
31 Dec 2027

Declared by the promoter to HARERA

Land area
11302.54 (Sqr/mtrs)
FAR
1.5 proposed of 1.5 permissible
licence
17 of 2012 dated 02.03.2012 AND 62 of 2012 dated 15.06.2012
Estimated project cost
₹174.37 crore
Cost of land
₹4.40 crore
Declared inventory · 96 types

Declared inventory — 96 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 6 units · 16.17 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 6 units · 18.3 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 2 units · 19.05 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 2 units · 19.32 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 10 units · 19.7 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 6 units · 19.88 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 2 units · 20.35 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ROYAL STREET · 2 units · 22.02 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE NO. 17 OF 2012 DATED 02.03.2012 AND 62 OF 2012 DATED 15.06.2012 — declared: already been obtained
  • II. DEMARCATION PLAN — declared: already been obtained
  • III. ZONING PLAN DRG NO. DGTCP 6010 DT. 24.07.2017 — declared: already been obtained
  • IV. SERVICE PLAN ESTIMATE — declared: already been obtained
  • V. NOC FOR HEIGHT CLEARANCE NO. AAI/RHQ/NR/ATM/NOC/2014/475/9085-88 — declared: already been obtained
  • VI. CONSENT TO ESTABLISH FROM POLLUTION ANGLE NO.-HSPCB/CONSENT/:329962316FDBDCTE3450348 — declared: already been obtained
  • VII. ENVIRONMENT CLEARANCE NO. SEIAA/HR/2016/904 — declared: already been obtained
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

1 file
Approved Site Plan29 Mar 2019

Layout plan

1 file
Latest Layout Plan29 Mar 2019

Zoning plan

2 files
Zoning Plan20 Apr 2019Combined Zoning20 Apr 2019

Demarcation plan

2 files
Demarcation Plan20 Apr 2019Demarcation Plan20 Apr 2019

Building plans

13 files
Building Plan12 Jun 2019Building Plan12 Jun 2019Building Plan12 Jun 2019

Services

Sewerage and drainage

2 files
Sewerage Plan (Service Plan Estimate)20 Apr 2019Storm Plan (Service Plan Estimate)20 Apr 2019

Water supply

1 file
Water Plan (Service Plan Estimate)20 Apr 2019

Service plans

1 file
Service Plans on the Layout20 Apr 2019

Approvals and clearances

DTCP licence

2 files
Licence Copy with Land Schedule29 Mar 2019Licence29 Mar 2019

Sales papers

Allotment and sale agreements

2 files
Draft Agreement Letter11 Jun 2019Builder-Buyer Agreement11 Jun 2019

Money

Accounts and finance

6 files
Cash Flow Statement11 Jun 2019CA Certificate on the Application’s Figures11 Jun 2019Balance Sheet29 Mar 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Apr 2019

HARERA’s orders

HARERA’s orders

2 files
Uploaded the corrigendum of the change of bank a/c details23 Oct 2026Corrigendum6 Sept 2021

Other filings

Other filings

1 file
Rrf11 Jun 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

17 OF 2012 · Omaxe World Street Pvt. Ltd. · FARIDABAD

Licence valid to 1 Mar 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

62 OF 2012 · Omaxe World Street Pvt. Ltd. · FARIDABAD

Licence valid to 14 Jun 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 14 Jun 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 3 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

17 OF 2012: 6 parcels, 2.0875 acres in all, in Bhatola (hadbast 115), tehsil Faridabad.

The licence register prints the same licensed area, 2.0875 acres.

  • 29//1/2/22 kanal 15 marla
  • 29//12/11 kanal 12 marla
  • 29//2/24 kanal
  • 29//3/1/2 min S1 kanal 10 marla
Show the other 2 parcels
  • 29//8/34 marla
  • 29//9/26 kanal 13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

62 OF 2012: 14 parcels, 8.5708 acres in all, in Bhatola (hadbast 115), tehsil Faridabad.

The licence register prints the same licensed area, 8.571 acres.

  • 29//108 kanal
  • 29//115 kanal 7 marla
  • 29//12/25 kanal 3 marla
  • 29//138 kanal
Show the other 10 parcels
  • 29//148 kanal
  • 29//17/17 kanal 15 marla
  • 29//188 kanal
  • 29//3/1/21 marla
  • 29//3/2/2 min S1 kanal 13 marla
  • 29//78 kanal
  • 29//8/12 kanal
  • 29//8/25 kanal 4 marla
  • 29//9/112 marla
  • rectangle 29, kila 3/1/1 Min South16 marla 3 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village: Bhatola (hadbast 115), tehsil Faridabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 29//1/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Mar 2019

Layout plan

1 file
Latest Layout Plan29 Mar 2019

Building plans

13 files
Building Plan12 Jun 2019Building Plan12 Jun 2019Building Plan12 Jun 2019Building Plan12 Jun 2019Building Plan12 Jun 2019Approved Building Plans, Full Set12 Jun 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/502 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Robust Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.