Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
M/S DECENT BUILDHOMES PVT LTDthe company that filed it, for Decent Buildhomes
Timeline
  1. 3 Nov 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.038 acres in all, by use
  • Roads1.549 acres · 38%
  • Parks and playgrounds1.26 acres · 31%
  • Apartment buildings1.029 acres · 25%
  • Other uses0.2 acres · 5%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV system
  • KitchenAs per industry standard
  • LiftsBranded
  • FloorsIPS flooring/ tiles/ marbles/granite/ laminated wooden flooring
  • WallsOBD/acrylic emulsion
  • BathroomsCP fittings and sanitary WARE
  • WindowsGlazed window with UPVC/ AL MS frames
  • Main doorFlush doors/UPVC doors/MS

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is AMBROSIA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/813/545/2024/40. Valid to 31 Dec 2030.

The source ↗
What is the possession timeline for AMBROSIA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2030. Its registration runs to 31 Dec 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AMBROSIA?From the records · Map pin and road lines, read 6 Sep 2026

AMBROSIA is in Sector 70, Gurugram; the site address declared to HARERA is Sector - 70. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AMBROSIA?From the records · HARERA, read 4 Nov 2026

AMBROSIA is a Decent Buildhomes project, registered by its company M/S DECENT BUILDHOMES PVT LTD.

The source ↗Decent Buildhomes's projects and court record

The records

What the registers hold for AMBROSIA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/813/545/2024/40: Registered. Valid to 31 Dec 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 40 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Apr 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Nov 2023, building plans 3 Nov 2023.Declared to HARERA, read 29 Oct 2026
The court record of Decent Buildhomes’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 40 OF 2022 ends soon

    Named in this project’s application. Valid to 11 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 67 HARERA files, with the dates we read them
Registration no.
GGM/813/545/2024/40
Registration valid till
31 Dec 2030
Declared possession
31 Dec 2030

Declared by the promoter to HARERA

Land area
4.0375 (Acre) (16,339.18 sq m)
FAR
2.7 proposed of 2.7 permissible
licence
LICENSE NO 40 OF 2022
Estimated project cost
₹405.79 crore
Cost of land
₹7.93 crore
Layout plan, declared approved (field 5a)
3 Nov 2023
Building plans, declared approved
3 Nov 2023
Construction to start
1 Feb 2024
Completion declared for
31 Dec 2030
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 268 units · 4,67,079.3 sq m carpet · 3 towers
  • Apartment/Shops/Other Buildings · 71 units · 3,334.59 sq m carpet · 1 tower
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE NO 40 OF 2022 — declared: already been obtained (12 Apr 2022)
  • II. ENVIRONMENTAL CLEARANCE — declared: already been obtained (9 Nov 2023)
  • III. FIRE SCHEME — declared: already been obtained (10 Jan 2024)
  • IV. SERVICE ESTIMATES — declared: already been obtained (23 Jan 2024)
  • V. MINING — declared: already been obtained (30 Nov 2023)
  • VI. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (21 Aug 2023)
  • VII. ARAVALI NOC — declared: already been obtained (18 Sept 2023)
  • VIII. APPROVAL OF BUILDING PLAN — declared: already been obtained (3 Nov 2023)
On file with HARERA · 67 files

On file with HARERA (67)

Plans

Site plan

1 file
Approved Site Plan22 Feb 2024

Layout plan

1 file
Latest Layout Plan22 Feb 2024

Zoning plan

1 file
Zoning Plan22 Feb 2024

Building plans

18 files
Section X Tower 25 Jun 2024Terrace Floor Plan Commercial5 Jun 2024Elevation - Tower 15 Jun 2024

Floor plans

19 files
Refuge Area Plan5 Jun 2024Stilt Floor Plan5 Jun 20241st Floor Plan Tower 15 Jun 2024

Services

Sewerage and drainage

3 files
Storm Water Layout Map5 Jun 2024Assurance for 160KLD STP Treated Water5 Jun 2024Sewar Layout Map5 Jun 2024

Water supply

1 file
Site Water Supply Map5 Jun 2024

Electricity

1 file
Electricity Map5 Jun 2024

Roads

1 file
Road Map5 Jun 2024

Landscape and green areas

1 file
Landscape Plan5 Jun 2024

Service plans

1 file
Service Estimate Approval5 Jun 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule22 Feb 2024

Fire safety

1 file
Fire Scheme5 Jun 2024

Other NOCs and clearances

4 files
Enviroment Clearance5 Jun 2024Airport NOC5 Jun 2024Mining Permission5 Jun 2024Forest NOC5 Jun 2024

Land records

Land records

4 files
NEC5 Jun 2024Mutation5 Jun 2024Collabration Agreement5 Jun 2024Revenue Record Entry of Licence and Collaboration5 Jun 2024

Money

Accounts and finance

1 file
Non-Default Certificate from a CA22 Feb 2024

The promoter’s papers

Declarations and affidavits

7 files
Affidavit Master5 Jun 2024Undertaking Forest Land5 Jun 2024Bank Undertaking5 Jun 2024

Other filings

Other filings

1 file
Change Room Plan5 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

40 OF 2022 · BNB Land Developers Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 11 Apr 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

40 OF 2022: 10 parcels, 4.0375 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 4.0375 acres.

  • 81//14/12 kanal 9 marla
  • 81//15/11 kanal 17 marla
  • 81//4/15 kanal 4 marla
  • 81//4/22 kanal 16 marla
Show the other 6 parcels
  • 81//5/15 kanal 4 marla
  • 81//5/2/116 marla
  • 81//6/11 kanal 3 marla
  • 81//6/2/24 kanal 17 marla
  • 81//7/11 kanal 15 marla
  • 81//7/26 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 81//14/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Feb 2024

Layout plan

1 file
Latest Layout Plan22 Feb 2024

Building plans

18 files
Section X Tower 25 Jun 2024Terrace Floor Plan Commercial5 Jun 2024Elevation - Tower 15 Jun 2024Elevation B Tower 15 Jun 2024Elevation C Tower 25 Jun 2024Section Tower 15 Jun 2024

Floor plans

19 files
Refuge Area Plan5 Jun 2024Stilt Floor Plan5 Jun 20241st Floor Plan Tower 15 Jun 2024First Floor Plan Commercial5 Jun 2024First Floor Plan Community Hall5 Jun 2024Typical Floor Plan Odd5 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (67 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2825 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Decent Buildhomes

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.