About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
556–571 sq ft
In m²about 52–53 m², as declared
Registered
27 Oct 2020
Registered by
OCEAN SEVEN BUILDTECH PVT LTDthe company that filed it, for Ocean Seven Buildtech
Timeline
  1. 7 Feb 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 27 Oct 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 2 Sep 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

739homes, 556 to 571 sq ft of carpet area
  • Under 1,000 sq ft556–571 sq ft739

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,580 m² in all, by use
  • Parking8,304 m² · 40%
  • Other usesas the form names them: Anganwadi4,942 m² · 24%
  • Green belts3,388 m² · 16%
  • Apartment buildings2,640 m² · 13%
  • Shops and offices918 m² · 4%
  • Club house185 m² · under 1%
  • Sewage and waste treatment179 m² · under 1%
  • Electricity sub-station25 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified tiles/ ceramic tiles
  • LiftsISI marked
  • FloorsVitrified tiles
  • WallsOil BOND distemper
  • BathroomsISI marked CP fittings, W.C & washbasin
  • WindowsG.I/SS/UPVC
  • Main doorHardwood
  • Electrical fittingsCopper electrical wiring, ISI marked switches & switches

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is The Venetian registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/423/155/2020/39, registered on 27 Oct 2020. The register’s record shows an end date of 2 Sep 2024. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for The Venetian?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 2 Sep 2024. Its registration runs to 2 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around The Venetian?From the records · Map pin and road lines, read 6 Sep 2026

The Venetian is in Sector 70, Gurugram; the site address declared to HARERA is Sector-70,Badshahpur. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building The Venetian?From the records · HARERA, read 4 Nov 2026

The Venetian is a Ocean Seven Buildtech project, registered by its company OCEAN SEVEN BUILDTECH PVT LTD.

The source ↗Ocean Seven Buildtech's projects and court record

The records

What the registers hold for The Venetian: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/423/155/2020/39: Registration lapsed. The register’s record shows an end date of 2 Sep 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 103 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 4 Sep 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 Feb 2020, building plans 7 Feb 2020.Declared to HARERA, read 29 Oct 2026
The court record of Ocean Seven Buildtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 103 OF 2019 lapsed

    Named in this project’s application. Valid to 4 Sep 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 2 Sep 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 31 HARERA files, with the dates we read them
Registration no.
GGM/423/155/2020/39
Registration date
27 Oct 2020
Registration valid till
2 Sept 2024
Declared possession
2 Sept 2024

Declared by the promoter to HARERA

Land area
5.10 (Acre) (20,638.97 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
103 OF 2019
Estimated project cost
₹156.92 crore
Cost of land
₹59.96 crore
Layout plan, declared approved (field 5a)
7 Feb 2020
Building plans, declared approved
7 Feb 2020
Construction to start
2 Dec 2020
Completion declared for
2 Sept 2024
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 372 units · 53.057 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 367 units · 51.68 sq m carpet · 5 towers · one flat
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (5 Sept 2019)
  • II. BUILDING PLAN — declared: already been obtained (7 Feb 2020)
On file with HARERA · 31 files

On file with HARERA (31)

Plans

Site plan

2 files
Superimposed Site Plan2 Nov 2020Approved Site Plan24 Feb 2020

Layout plan

1 file
Latest Layout Plan18 Apr 2020

Zoning plan

1 file
Zoning Plan21 Feb 2020

Demarcation plan

1 file
Demarcation Plan22 Mar 2020

Building plans

4 files
Elevations2 Nov 2020Structural Drawings2 Nov 2020Section Plans2 Nov 2020Approved Building Plans, Full Set26 Feb 2020

Floor plans

3 files
Apartment Plans2 Nov 2020Floor Plans2 Nov 2020Parking Plan2 Nov 2020

Services

Sewerage and drainage

2 files
Storm Water2 Nov 2020Sewarage Layout2 Nov 2020

Water supply

2 files
Plumbing Drg2 Nov 2020Water Plan2 Nov 2020

Electricity

2 files
Electricity2 Nov 2020Street Light and Landscape Plan2 Nov 2020

Roads

1 file
Road Plan2 Nov 2020

Service plans

1 file
Service Plans on the Layout26 Feb 2020

Approvals and clearances

DTCP licence

2 files
License Information2 Nov 2020Licence Copy with Land Schedule25 Mar 2020

Fire safety

1 file
Fire Fighting Layout2 Nov 2020

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration2 Nov 2020Collaboration Agreement2 Nov 2020

Money

Accounts and finance

3 files
Cash Flow Statement18 Apr 2020Non-Default Certificate from a CA18 Apr 2020CA Certificate on the Application’s Figures18 Apr 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit18 Apr 2020

Other filings

Other filings

2 files
Dual Pipeing2 Nov 2020Swm Plan2 Nov 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

103 OF 2019 · OCEAN SEVEN BUILDTECH PVT. LTD. · GURGAON-MANESAR

Licence valid to 4 Sept 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 19 Apr 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

103 OF 2019: 18 parcels, 5.1 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 5.1 acres.

  • 112//20 min1 kanal
  • 113//14/1/19 marla
  • 113//14/1/24 kanal 15 marla
  • 113//14/2/15 marla
Show the other 14 parcels
  • 113//14/2/22 kanal 11 marla
  • 113//16/11 kanal 7 marla
  • 113//16/2 min1 kanal 1 marla
  • 113//17/12 kanal 9 marla
  • 113//17/2/1 min17 marla
  • 113//17/2/2 min7 marla
  • 113//5/1/111 marla
  • 113//5/2/11 kanal 4 marla
  • 113//6/12 kanal 13 marla
  • 113//6/25 kanal 7 marla
  • 113//7/13 kanal 4 marla
  • 113//7/24 kanal 16 marla
  • 113//15/17 kanal 4 marla
  • 113//15/216 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 112//20 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Superimposed Site Plan2 Nov 2020Approved Site Plan24 Feb 2020

Layout plan

1 file
Latest Layout Plan18 Apr 2020

Building plans

4 files
Elevations2 Nov 2020Structural Drawings2 Nov 2020Section Plans2 Nov 2020Approved Building Plans, Full Set26 Feb 2020

Floor plans

3 files
Apartment Plans2 Nov 2020Floor Plans2 Nov 2020Parking Plan2 Nov 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (31 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1275 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ocean Seven Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.