BMG ASPIRE (ELEGANT HEIGHTS - PHASE II)

by B. M. Gupta Developers · Rewari

Not on our price list yet

Possession 10 Jul 2023 · as the developer declared it to HARERA

About this project

Key facts

Carpet area
5,005 sq ft
In m²about 465–465 m², as declared
Registered by
B M GUPTA DEVELOPERS PVT LTDthe company that filed it, for B. M. Gupta Developers
Timeline
  1. 17 Feb 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Jul 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 10 Dec 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

27homes, 5,005 to 5,005 sq ft of carpet area
  • 3,000 sq ft and above5,005 sq ft27

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,866 m² in all, by use
  • Parks and playgrounds2,170 m² · 45%
  • Roads1,350 m² · 28%
  • Apartment buildings696 m² · 14%
  • Pavements650 m² · 13%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • LiftsLift facility WILL be given
  • WindowsUPVC & aluminium
  • Main doorWooden doors - external only
  • Gas pipelinePNG pipe LINE WILL be provided
  • Water storageYes .. underground & overhead tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-26, GARHI BOLNI ROAD, REWARI - 123401

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 5
  • Other register states: 1

Questions buyers ask

Is BMG ASPIRE (ELEGANT HEIGHTS - PHASE II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-RWR-208-2020. Valid to 10 Dec 2026.

The source ↗
What is the possession timeline for BMG ASPIRE (ELEGANT HEIGHTS - PHASE II)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 10 Jul 2023. Its registration runs to 10 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around BMG ASPIRE (ELEGANT HEIGHTS - PHASE II)?From the records · HARERA, read 4 Nov 2026

BMG ASPIRE (ELEGANT HEIGHTS - PHASE II) is in Rewari; the site address declared to HARERA is Sector-26, Garhi Bolni Road, Rewari - 123401. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building BMG ASPIRE (ELEGANT HEIGHTS - PHASE II)?From the records · HARERA, read 4 Nov 2026

BMG ASPIRE (ELEGANT HEIGHTS - PHASE II) is a B. M. Gupta Developers project, registered by its company B M GUPTA DEVELOPERS PVT LTD.

The source ↗B. M. Gupta Developers's projects and court record

The records

What the registers hold for BMG ASPIRE (ELEGANT HEIGHTS - PHASE II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-RWR-208-2020: Registered. Valid to 10 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 35 OF 2009 is on the DTCP register, valid to 10 Jul 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 17 Feb 2020, building plans 17 Feb 2020.Declared to HARERA, read 29 Oct 2026
The court record of B. M. Gupta Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 10 Dec 2026. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 68 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-RWR-208-2020
Registration valid till
10 Dec 2026
Declared possession
10 Jul 2023

Declared by the promoter to HARERA

Land area
4865.620 (Sqr/mtrs)
FAR
the application prints 376.89, which is not a ratio
licence
35 of 2009 dated 11.07.2009 valid upto 10.07.2021
Estimated project cost
₹35.83 crore
Cost of land
₹0.91 crore
Layout plan, declared approved (field 5a)
17 Feb 2020
Building plans, declared approved
17 Feb 2020
Construction to start
1 Oct 2020
Completion declared for
10 Jul 2023
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 27 units · 465 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (11 Jul 2009)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (17 Feb 2020)
  • III. SERVICE PLAN ESTIMATE — declared: already been obtained (27 Jan 2020)
  • IV. ENVIRONMENTAL CLEARANCE — declared: applied for but yet to receive (30 Dec 2019)
  • V. ELECTRICAL SCHEME — declared: yet to file for approval
  • VI. FIRE FIGHTING SCHEME — declared: yet to file for approval
On file with HARERA · 68 files

On file with HARERA (68)

Plans

Site plan

3 files
Approved Original Site Plan Where Applied Land Left for Future Expansion14 Mar 2020Approved Site Plan14 Mar 2020Approved Revised Site Plan14 Mar 2020

Layout plan

1 file
Latest Layout Plan14 Mar 2020

Zoning plan

1 file
Zoning Plan14 Mar 2020

Demarcation plan

1 file
Demarcation Plan14 Mar 2020

Building plans

10 files
Front Side Elevation14 Mar 2020Approved Building Plans, Full Set14 Mar 2020Right Side Elevation14 Mar 2020

Floor plans

11 files
2nd Basement Floor Plan14 Mar 20201st Basement Floor Plan14 Mar 2020Ground Floor Plan14 Mar 2020

Services

Sewerage and drainage

2 files
Storm Water Drainage System16 Mar 2020Sewerage Scheme16 Mar 2020

Water supply

1 file
Water Supply Scheme16 Mar 2020

Roads

1 file
Road Plan16 Mar 2020

Service plans

3 files
Service Plan Estimate Approval Memo No 2527 Dtd 27-1-202017 Mar 2020Service Plans on the Layout16 Mar 2020Service Plan Estimate14 Mar 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule24 Feb 2020

Land records

Land records

9 files
Jamabandi 2017-18 - Village Dhamlaka - Hadbast 15514 Mar 2020Sale Deed 876 - Jyotirmay Housing Pvt Ltd14 Mar 2020Revenue Record Entry of Licence and Collaboration14 Mar 2020

Sales papers

Allotment and sale agreements

2 files
Apartment Allotment Letter - Draft27 Jun 2020Apartment Agreement to Sell - Draft27 Jun 2020

Money

Accounts and finance

10 files
Detailed Project Report27 Jun 2020Cash Flow Statement20 Jun 2020ITR Ay 2019-2014 Mar 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit27 Jun 2020

Company papers

3 files
Bmg - Authorized Representative Board Resolution27 Jun 2020Board Resolution Manoj Kapoor to Represent Before Authority27 Jun 2020Bmg - Certificate of Incorporation14 Mar 2020

HARERA’s orders

HARERA’s orders

4 files
Extension Uploaded5 May 2026Second year extension granted10 Feb 2025Extension 208-202011 Mar 2024Extension of Original Building Plan Memo No. 33094 Dtd 21-12-201714 Mar 2020

Other filings

Other filings

4 files
Ground Level Plan14 Mar 2020Intkal 2381 - Village Dhaliawas14 Mar 2020Intkal 342 - Village Dhamlaka14 Mar 2020Ground Coverage Diagram & Calculation14 Mar 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

35 OF 2009 · BM Gupta Developers Pvt Ltd · REWARI

Licence valid to 10 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 27 Jun 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

35 OF 2009: 103 parcels, 51.7938 acres in all, in Padiyawas (hadbast 172), Dhaliawas (hadbast 173) and Dhamlaka (hadbast 155), tehsil Rewari.

The licence register prints the licensed area as 52.22 acres.

  • 23//17/13 kanal 9 marlaPadiyawas (172)
  • 23//17/24 kanal 16 marlaPadiyawas (172)
  • 23//18/12 kanal 9 marlaPadiyawas (172)
  • 23//18/24 kanal 18 marlaPadiyawas (172)
Show the other 99 parcels
  • 23//21/17 marlaPadiyawas (172)
  • 23//21/27 kanalPadiyawas (172)
  • 23//238 kanalPadiyawas (172)
  • 23//248 kanalPadiyawas (172)
  • 23//25/12 kanal 8 marlaPadiyawas (172)
  • 23//25/21 kanal 10 marlaPadiyawas (172)
  • 25//5/11 kanal 19 marlaPadiyawas (172)
  • 25//5/23 kanal 1 marlaPadiyawas (172)
  • 26//1/18 marlaPadiyawas (172)
  • 26//1/27 kanal 12 marlaPadiyawas (172)
  • 26//10/1/16 kanal 5 marlaPadiyawas (172)
  • 26//10/1/25 marlaPadiyawas (172)
  • 26//9/15 kanal 17 marlaPadiyawas (172)
  • 26//9/13 marlaPadiyawas (172)
  • 24//16/2/12 kanal 18 marlaPadiyawas (172)
  • 24//16/2/23 kanal 2 marlaPadiyawas (172)
  • 24//17/2/11 kanalPadiyawas (172)
  • 24//17/2/22 kanal 2 marlaPadiyawas (172)
  • 24//25/16 kanal 4 marlaPadiyawas (172)
  • 24//25/22 kanal 8 marlaPadiyawas (172)
  • 33//14/14 kanalDhaliawas (173)
  • 33//157 kanal 8 marlaDhaliawas (173)
  • 33//167 kanal 8 marlaDhaliawas (173)
  • 33//258 kanalDhaliawas (173)
  • 33//4/24 kanalDhaliawas (173)
  • 33//58 kanalDhaliawas (173)
  • 33//67 kanal 9 marlaDhaliawas (173)
  • 33//77 kanal 10 marlaDhaliawas (173)
  • 33//710 marlaDhaliawas (173)
  • 34//10/15 kanal 4 marlaDhaliawas (173)
  • 34//10/22 kanal 13 marlaDhaliawas (173)
  • 34//118 kanalDhaliawas (173)
  • 34//12/12 kanal 16 marlaDhaliawas (173)
  • 34//12/25 kanal 4 marlaDhaliawas (173)
  • 34//138 kanal 2 marlaDhaliawas (173)
  • 34//17/11 kanal 1 marlaDhaliawas (173)
  • 34//17/22 kanal 7 marlaDhaliawas (173)
  • 34//207 kanal 7 marlaDhaliawas (173)
  • 34//218 kanalDhaliawas (173)
  • 34//24/22 kanal 16 marlaDhaliawas (173)
  • 34//84 kanal 18 marlaDhaliawas (173)
  • 34//9/15 kanal 4 marlaDhaliawas (173)
  • 34//9/22 kanal 16 marlaDhaliawas (173)
  • 35//11/111 marlaDhaliawas (173)
  • 35//11/24 kanal 1 marlaDhaliawas (173)
  • 35//20/12 kanal 12 marlaDhaliawas (173)
  • 35//20/22 kanal 12 marlaDhaliawas (173)
  • 36//15/3/116 marlaDhaliawas (173)
  • 36//15/3/21 kanal 17 marlaDhaliawas (173)
  • 36//16/12 kanal 18 marlaDhaliawas (173)
  • 36//16/24 marlaDhaliawas (173)
  • 37//58 kanalDhaliawas (173)
  • 37//66 kanalDhaliawas (173)
  • 3//117 kanal 11 marlaDhamlaka (155)
  • 3//12/12 kanal 4 marlaDhamlaka (155)
  • 3//12/23 kanal 5 marlaDhamlaka (155)
  • 3//132 kanal 16 marlaDhamlaka (155)
  • 3//16/2/14 marlaDhamlaka (155)
  • 3//16/2/21 kanal 14 marlaDhamlaka (155)
  • 3//17/1/12 kanal 8 marlaDhamlaka (155)
  • 3//17/1/23 kanal 7 marlaDhamlaka (155)
  • 3//17/2/114 marlaDhamlaka (155)
  • 3//17/2/21 kanal 7 marlaDhamlaka (155)
  • 3//18/13 kanal 2 marlaDhamlaka (155)
  • 3//18/24 kanal 18 marlaDhamlaka (155)
  • 3//19/13 kanal 2 marlaDhamlaka (155)
  • 3//19/24 kanal 18 marlaDhamlaka (155)
  • 3//20/13 kanal 2 marlaDhamlaka (155)
  • 3//20/24 kanal 18 marlaDhamlaka (155)
  • 3//218 kanalDhamlaka (155)
  • 3//228 kanalDhamlaka (155)
  • 3//23/22 kanal 1 marlaDhamlaka (155)
  • 3//24/26 kanal 8 marlaDhamlaka (155)
  • 3//25/11 kanal 16 marlaDhamlaka (155)
  • 6//4/26 kanal 8 marlaDhamlaka (155)
  • 6//5/11 kanal 16 marlaDhamlaka (155)
  • 36//18 kanalDhaliawas (173)
  • 36//108 kanalDhaliawas (173)
  • 36//15/1/116 marlaDhaliawas (173)
  • 36//15/1/21 kanal 17 marlaDhaliawas (173)
  • 36//15/2/116 marlaDhaliawas (173)
  • 36//15/2/21 kanal 17 marlaDhaliawas (173)
  • 36//3/15 kanal 14 marlaDhaliawas (173)
  • 36//3/21 kanal 2 marlaDhaliawas (173)
  • 36//87 kanal 8 marlaDhaliawas (173)
  • 34//18/13 kanal 2 marlaDhaliawas (173)
  • 34//18/24 kanal 18 marlaDhaliawas (173)
  • 34//19/14 kanal 4 marlaDhaliawas (173)
  • 34//19/23 kanal 4 marlaDhaliawas (173)
  • 34//22/12 kanal 4 marlaDhaliawas (173)
  • 34//22/25 kanal 4 marlaDhaliawas (173)
  • 34//238 kanalDhaliawas (173)
  • 34//24/14 kanal 12 marlaDhaliawas (173)
  • 23//19/12 kanal 5 marlaPadiyawas (172)
  • 23//19/24 kanal 11 marlaPadiyawas (172)
  • 23//227 kanalPadiyawas (172)
  • 23//2219 marlaPadiyawas (172)
  • 26//28 kanalPadiyawas (172)
  • 3//24/210 marlaDhamlaka (155)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Rewari, then the tehsil and the village you want: Padiyawas (hadbast 172), Dhaliawas (hadbast 173) or Dhamlaka (hadbast 155), tehsil Rewari. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//17/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Approved Original Site Plan Where Applied Land Left for Future Expansion14 Mar 2020Approved Site Plan14 Mar 2020Approved Revised Site Plan14 Mar 2020

Layout plan

1 file
Latest Layout Plan14 Mar 2020

Building plans

10 files
Front Side Elevation14 Mar 2020Approved Building Plans, Full Set14 Mar 2020Right Side Elevation14 Mar 2020Left Side Elevation14 Mar 2020Approved Revised Building Plans BR-III Memo 4517 Dtd 17-2-202014 Mar 2020Approved Original Building Plan BR-III Memo No. 19550 Dtd 3-10-201214 Mar 2020

Floor plans

11 files
2nd Basement Floor Plan14 Mar 20201st Basement Floor Plan14 Mar 2020Ground Floor Plan14 Mar 20201st Floor Plan14 Mar 20201st Basement Area Diagram14 Mar 2020Typical Area14 Mar 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (68 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1057 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on B. M. Gupta Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.