Under construction

BPTP The Amaario

by BPTP · Gurugram

Not on our price list yet

Possession 31 Mar 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 1,970 sq ft
In m²about 183 m², the average flat, as declared
Registered by
COUNTRYWIDE PROMOTERS PRIVATE LIMITEDthe company that filed it, for BPTP
Timeline
  1. 27 Mar 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2031Registration valid toHARERA, read 4 Nov 2026
  3. 31 Mar 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.76 acres in all, by use
  • Roads2.028 acres · 43%
  • Parking1.537 acres · 32%
  • Parks and playgrounds0.676 acres · 14%
  • Apartment buildings0.51 acres · 11%
  • Other usesas the form names them: Electricity supply system0.009 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV / VRF with high units in living/dining, kitchen, bedrooms & utilies daikin/bluestar/toshiba/hitachi/LG/samsung/voltas/panasonic or equivalent make
  • KitchenGreenply/SOHA/spacewood/greenlam/archidply/merino/century/kitply/kutty/ancho/EURO or equivalent make
  • Kitchen appliancesWooden flush door, greenply/sobha/spacewood/greenlam/archidply/merino/century/kitply/kutty/EURO/acnarendra/akhuumber/haryana plywood/pradeep timber/edifice/shreejiwood/parasnath/deshbandhu or equivalent make
  • LiftsIP cameras in selected areas OTIS/mitsubishi/KONE/thyssenkrupp or equivalent
  • WardrobesFlush door, greenply/sobha/spacewood/greenlam/archidply/merino/century/kitply/kutty/EURO/acnarendra/akhuumber/haryana plywood/pradeep timber/edifice/shreejiwood/parasnath/deshbandhu or equivalent make
  • FloorsEngginered woodden, pergo/lotus kaleen/action
  • WallsTile,nitco/somany/orientbell/nitco/H&R johnson/kajaria/RAK or equivalent
  • BathroomsTile,nitco/somany/orientbell/nitco/H&R johnson/kajaria/RAK or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: 37 D GURUGRAM

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 10
  • Other register states: 5

Questions buyers ask

Is BPTP The Amaario registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/820/552/2024/47. Valid to 30 Sep 2031.

The source ↗
What is the possession timeline for BPTP The Amaario?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2032. Its registration runs to 30 Sep 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around BPTP The Amaario?From the records · HARERA, read 4 Nov 2026

BPTP The Amaario is in Gurugram; the site address declared to HARERA is 37 D Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building BPTP The Amaario?From the records · HARERA, read 4 Nov 2026

BPTP The Amaario is a BPTP project, registered by its company COUNTRYWIDE PROMOTERS PRIVATE LIMITED.

The source ↗BPTP's projects and court record

The records

What the registers hold for BPTP The Amaario: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/820/552/2024/47: Registered. Valid to 30 Sep 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 83 OF 2008 is on the DTCP register, valid to 4 Apr 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 27 Mar 2024.Declared to HARERA, read 29 Oct 2026
The court record of BPTP’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 36 HARERA files, with the dates we read them
Registration no.
GGM/820/552/2024/47
Registration valid till
30 Sept 2031
Declared possession
31 Mar 2032

Declared by the promoter to HARERA

Land area
4.76 (Acre) (19,263.04 sq m)
FAR
2.01 proposed of 2.01 permissible
licence
License no 83 of 2008 23.814 acres License no 94 of 2011 19.744 acres
Estimated project cost
₹837.06 crore
Cost of land
₹11.38 crore
Building plans, declared approved
27 Mar 2024
Construction to start
1 Jul 2024
Completion declared for
31 Mar 2032
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 248 units · 45,384 sq m carpet · 2 towers · total for 248 flats, about 183 m² each
Statutory approvals, as declared · 18

Statutory approvals, as declared

  • I. LICENSE NO 83 0F 2008 — declared: already been obtained (5 Apr 2008)
  • II. LICENSE NO 94 OF 0F 2011 — declared: already been obtained (24 Oct 2011)
  • III. ENVIRONMENTAL CLEARANCE — declared: already been obtained (15 Oct 2013)
  • IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (25 Oct 2017)
  • V. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (27 Mar 2024)
  • VI. ZONING PLAN APPROVAL — declared: already been obtained (9 May 2012)
  • VII. SERVICE ESTIMATES — declared: already been obtained (7 Nov 2013)
  • VIII. REVISED FIRE SCHEME APPROVAL — declared: already been obtained (2 Apr 2024)
  • IX. LICENSE RENEWAL 83 OF 2008 — declared: already been obtained (1 Jul 2020)
  • X. ARAVALLI NOC — declared: already been obtained (30 Apr 2012)
  • XI. STORM WATER DRAINAGE — declared: already been obtained (15 Apr 2022)
  • XII. SEWERAGE APPROVAL — declared: already been obtained (17 Jun 2022)
  • XIII. WATER SUPPLY APPROVAL — declared: already been obtained (30 Oct 2010)
  • XIV. ELECTRICAL LOAD APPROVAL — declared: already been obtained (21 Jun 2017)
  • XV. FOREST NOC — declared: already been obtained (8 Feb 2012)
  • XVI. LICENSE RENEWAL 94 OF 2011 — declared: already been obtained (10 Jul 2020)
  • XVII. REVISED SERVICE ESTIMATE CE REPORT — declared: already been obtained (5 Mar 2024)
  • XVIII. TOR RECEIVED FOR REVISED ENVIRONMENTAL CLEARANCE — declared: already been obtained (20 Feb 2024)
On file with HARERA · 36 files

On file with HARERA (36)

Plans

Site plan

1 file
Approved Site Plan19 Apr 2024

Layout plan

1 file
Latest Layout Plan18 Oct 2023

Zoning plan

1 file
Zoning Plan Approved Letter of 19.744+23.814=43.558ACS19 Apr 2024

Building plans

7 files
BR III19 Apr 2024Tower 26 Terrace19 Apr 2024Elevation T2719 Apr 2024

Floor plans

7 files
Basement-119 Apr 2024Tower-26 Typ Floor19 Apr 2024First Floor19 Apr 2024

Services

Sewerage and drainage

2 files
Storm Water Drainage19 Apr 2024Sewerage Connection19 Apr 2024

Water supply

1 file
Water Connection19 Apr 2024

Electricity

2 files
Electrical Load Availablity19 Apr 2024Power Line Shifting19 Apr 2024

Roads

1 file
Road and Green Calculation Area19 Apr 2024

Service plans

1 file
Service Estimates Plan19 Apr 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule18 Oct 2023

Environment clearance

1 file
Environment Clearance19 Apr 2024

Fire safety

1 file
Fire Scheme19 Apr 2024

Other NOCs and clearances

1 file
Forest - NOC for Clarification Regarding Non Forest Land (BASAI)43.558ACS Dtd. 08.02.1219 Apr 2024

Land records

Land records

5 files
Revenue Record Entry of Licence and Collaboration19 Apr 2024Mutation19 Apr 2024Title Search19 Apr 2024

Money

Accounts and finance

1 file
Non-Default Certificate from a CA18 Oct 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit18 Oct 2023

Other filings

Other filings

1 file
Aksh19 Apr 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

83 OF 2008 · Countrywide Promoters · GURGAON-MANESAR

Licence valid to 4 Apr 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

94 OF 2011 · Countrywide Promoters Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 23 Oct 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Oct 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

83 OF 2008: 9 parcels, 23.8141 acres in all, in Basai (hadbast 50), tehsil Kadipur.

The licence register prints the licensed area as 23.18 acres.

  • rectangle 0, kila 230 min4 bigha 17 biswa 4 biswansi
  • rectangle 0, kila 2391 bigha
  • rectangle 0, kila 2403 bigha 3 biswa
  • rectangle 0, kila 238/214 bigha 10 biswa 17 biswansi
Show the other 5 parcels
  • rectangle 0, kila 1080/2251 bigha 13 biswa
  • rectangle 0, kila 242/3/12 bigha 18 biswa
  • rectangle 0, kila 242/3/22 bigha
  • rectangle 0, kila 242/14 bigha 11 biswa
  • rectangle 0, kila 2413 bigha 9 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

94 OF 2011: 14 parcels, 19.7438 acres in all, in Basai (incompletely identified), tehsil Kadipur.

The licence register prints the same licensed area, 19.744 acres.

  • rectangle 242, kila 242/24 biswa
  • rectangle 1081, kila 1081/225/12 bigha 7 biswa 15 biswansi
  • rectangle 1081, kila 1081/225/21 bigha 7 biswa 7 biswansi
  • rectangle 226, kila 226/11 bigha 16 biswa 16 biswansi
Show the other 10 parcels
  • rectangle 221, kila 2211 bigha 16 biswa
  • rectangle 222, kila 222/16 biswa 18 biswansi
  • rectangle 218, kila 2183 bigha 17 biswa
  • rectangle 219, kila 2194 bigha 6 biswa
  • rectangle 228, kila 228/46 bigha 16 biswa 8 biswansi
  • rectangle 243, kila 2433 bigha 4 biswa
  • rectangle 244, kila 2443 bigha 2 biswa
  • rectangle 228, kila 228/35 biswa 8 biswansi
  • rectangle 228, kila 228/22 bigha 14 biswansi
  • rectangle 228, kila 228/11 biswa 10 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Basai (hadbast 50) or Basai (incompletely identified), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 0, kila 230 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan19 Apr 2024

Layout plan

1 file
Latest Layout Plan18 Oct 2023

Building plans

7 files
BR III19 Apr 2024Tower 26 Terrace19 Apr 2024Elevation T2719 Apr 2024Section-Aa19 Apr 2024Elevation T2619 Apr 2024Tower-27 Terrace19 Apr 2024Ff Roof19 Apr 2024

Floor plans

7 files
Basement-119 Apr 2024Tower-26 Typ Floor19 Apr 2024First Floor19 Apr 2024Basement-219 Apr 2024Tower-27 Typ Floor19 Apr 2024Ground & Stilt Area19 Apr 2024Stilt Parking19 Apr 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (36 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2651 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on BPTP

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.