Skip to content

Commercial Colony

by Manish Buildwell · Sector 91, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 91, Gurugram4.2 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Registered
12 Dec 2017
Registered by
MANISH BUILDWELL PVT. LTD.the company that filed it, for Manish Buildwell
Timeline
  1. 12 Dec 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 11 Dec 2022Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningSpace provision for split AC
  • FloorsConcrete floor
  • WallsLIME finish
  • Electrical fittingsOne point for connecting internal electrical system
  • Wi-Fi and broadbandProvision for cable TV and telipone LINE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 91, GurugramSector 91, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS4.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.7 km
  • Sohna Elevated Corridor (NH-248A)11.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Commercial Colony registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 382 OF 2017, registered on 12 Dec 2017. The register’s record shows an end date of 11 Dec 2022. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Commercial Colony?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Colony is in Sector 91, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Mewka, Sector-91,Gurugram,Haryana. In a straight line it is about 4.2 km from Delhi–Gurugram–SNB RRTS, 4.7 km from Dwarka Expressway and 11.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Colony?From the records · HARERA, read 4 Nov 2026

Commercial Colony is a Manish Buildwell project, registered by its company MANISH BUILDWELL PVT. LTD..

The source ↗Manish Buildwell's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 382 OF 2017: Registration lapsed. The register’s record shows an end date of 11 Dec 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
The court record of Manish Buildwell’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 11 Dec 2022. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
382 OF 2017
Registration date
12 Dec 2017
Registration valid till
11 Dec 2022

Declared by the promoter to HARERA

Land area
3.725 (Acre) (15,074.54 sq m)
FAR
5.5 proposed of 1.5 permissible
licence
Memo no . JD(BS)-LC-1879/2009 dated 02/03/2009
Estimated project cost
₹119.00 crore
Cost of land
₹3.45 crore
Declared inventory · 6 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type GROUND FLOOR · 173 units · 3,689.78 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FIRST FLOOR · 168 units · 2,762.21 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SECOND FLOOR · 168 units · 2,762.21 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type THIRD FLOOR · 32 units · 1,996.35 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FOURTH FLOOR · 18 units · 2,984.67 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FIFTH FLOOR · 1 unit · 58.68 sq m carpet
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. WATER NOC FOR CONSTRUCTION — declared: already been obtained (16 Jan 2014)
  • II. ARAVALI PERMISSION — declared: already been obtained (6 Jan 2014)
  • III. HEIGHT CLEARANCE — declared: already been obtained (13 Mar 2014)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (31 Jul 2014)
  • V. CLEARANCE TO SEIAA — declared: already been obtained (18 Feb 2014)
  • VI. FOREST CLEARANCE — declared: already been obtained (28 Feb 2014)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan21 Dec 2019

Layout plan

1 file
Latest Layout Plan18 Dec 2019

Zoning plan

1 file
Zoning Plan18 Dec 2019

Demarcation plan

1 file
Demarcation Plan18 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set18 Dec 2019

Services

Service plans

1 file
Service Plans on the Layout18 Dec 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule18 Dec 2019

Environment clearance

3 files
MOEF18 Dec 2019Environment Clearance18 Dec 2019SEIAA18 Dec 2019

Other NOCs and clearances

2 files
Arvali Clearance18 Dec 2019Forest NOC18 Dec 2019

Money

Accounts and finance

2 files
Non-Default Certificate from a CA21 Dec 2019Cash Flow Statement21 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit18 Dec 2019

Other filings

Other filings

1 file
Consent of Establishment18 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Memo no . JD(BS)-LC-1879/2009 dated 02/03/2009. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 91, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan21 Dec 2019

Layout plan

1 file
Latest Layout Plan18 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set18 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/968 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Manish Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.