COURTYARD 37D

by Eternal Sunshine Infra · Sector 37D, Gurugram

Not on our price list yet

Possession 29 Feb 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 37D, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered by
ETERNAL HOUSING INFRA LLPthe company that filed it, for Eternal Sunshine Infra
Timeline
  1. 7 Mar 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 18 May 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 29 Feb 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.2 acres in all, by use
  • Other usesas the form names them: Parking and services, Service road and green belt and sector road1.553 acres · 71%
  • Plots for sale0.647 acres · 29%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37D, GurugramSector 37D, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)6.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is COURTYARD 37D registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/727/459/2023/71. Valid to 29 Feb 2028.

The source ↗
What is the possession timeline for COURTYARD 37D?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 29 Feb 2028. Its registration runs to 29 Feb 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around COURTYARD 37D?From the records · Map pin and road lines, read 6 Sep 2026

COURTYARD 37D is in Sector 37D, Gurugram; the site address declared to HARERA is Revenue Estate Of Vill- Harsaru, Sector - 37d, Gururgam. In a straight line it is about 0.8 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building COURTYARD 37D?From the records · HARERA, read 4 Nov 2026

COURTYARD 37D is a Eternal Sunshine Infra project, registered by its company ETERNAL HOUSING INFRA LLP.

The source ↗Eternal Sunshine Infra's projects and court record

The records

What the registers hold for COURTYARD 37D: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/727/459/2023/71: Registered. Valid to 29 Feb 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2023 is on the DTCP register, valid to 1 Mar 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 Mar 2023, building plans 18 May 2023.Declared to HARERA, read 29 Oct 2026
The court record of Eternal Sunshine Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 20 HARERA files, with the dates we read them
Registration no.
GGM/727/459/2023/71
Registration valid till
29 Feb 2028
Declared possession
29 Feb 2028

Declared by the promoter to HARERA

Land area
2.2000 (Acre) (8,903.08 sq m)
FAR
the application prints 149.91, which is not a ratio
licence
Licence No. 47 of 2023 dated 02.03.2023 and valid upto 01.03.2028
Estimated project cost
₹50.48 crore
Cost of land
₹31.99 crore
Layout plan, declared approved (field 5a)
7 Mar 2023
Building plans, declared approved
18 May 2023
Construction to start
1 Jun 2023
Completion declared for
29 Feb 2028
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE: 1 — declared: already been obtained (2 Mar 2023)
  • II. ARCHITECTURAL CONTROL SHEETS — declared: already been obtained (18 May 2023)
  • III. SERVICE PLAN ESTIMATES APPROVAL — declared: applied for but yet to receive (28 Apr 2023)
On file with HARERA · 20 files

On file with HARERA (20)

Plans

Site plan

2 files
Site Plan23 Jun 2023Approved Site Plan7 May 2023

Layout plan

1 file
Latest Layout Plan7 May 2023

Demarcation plan

1 file
Demarcation Plan7 May 2023

Building plans

3 files
Approval of Standard Design of Sco's23 Jun 2023Standard Design-Block A23 Jun 2023Standard Design-Block B23 Jun 2023

Services

Sewerage and drainage

2 files
External Drainage Layout23 Jun 2023External Sewarage Layout23 Jun 2023

Water supply

1 file
External -Water Supply23 Jun 2023

Electricity

1 file
Street Lighting Layout23 Jun 2023

Roads

1 file
Road Layout23 Jun 2023

Service plans

2 files
Service Estimate Costing23 Jun 2023Service Plans on the Layout7 May 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule7 May 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Jun 2023

Money

Accounts and finance

3 files
Cash Flow Statement5 Jul 2023CA Certificate on the Application’s Figures7 May 2023Non-Default Certificate from a CA7 May 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit7 May 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

47 OF 2023 · Eternal Housing Infra LLP · GURGAON-MANESAR

Licence valid to 1 Mar 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 May 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2023: 3 parcels, 2.2 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 2.2 acres.

  • 30//16/16 kanal 12 marla
  • 31//19min3 kanal
  • 31//208 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//16/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan23 Jun 2023Approved Site Plan7 May 2023

Layout plan

1 file
Latest Layout Plan7 May 2023

Building plans

3 files
Approval of Standard Design of Sco's23 Jun 2023Standard Design-Block A23 Jun 2023Standard Design-Block B23 Jun 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (20 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2463 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Eternal Sunshine Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.