Key facts

Registered by
B M GUPTA DEVELOPERS PVT LTDthe company that filed it, for B. M. Gupta Developers
Timeline
  1. 31 Jan 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  2. 24 Jun 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenWalls:ceramic tiles up to 2FT. above counter and oil bound distemper in the balance area floor:ceramic tiles or equivalent cabinet: modular cabinet counter fitting /fixtures: polished granite counter
  • FloorsVitrified tiles with border
  • WallsAcrylic emulsion paint
  • BathroomsWalls: ceramic tiles up to 7 FT. height REST oil bound distemper floor: anti-skid ceramic tiles or equivalent exhausts: provision in each toilet counter: granite/ marble counter fittings / fixtures: equipped with washbasins, WCS in varied shades. chrome plated TAP fittings. provision for hot & cold water supply.
  • WindowsWooden/UPVC/ aluminum anodized sliding glass shutter/wooden frame
  • Main doorSeasoned wooden frame with european style hardwood (polished) door shutter
  • Electrical fittingsElectrical WORK with copper wires in concealed PVC conduits as per ISI CODE. provision shall be for sufficient light & power points with modular switches. circuits with MCBS of approved make. TV and telephone points in each bedroom & drawing room

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-26, GARHI BOLNI ROAD, REWARI

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 5
  • Other register states: 1

Questions buyers ask

Is "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 242/2017,. Ended 24 Jun 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2024. Its registration runs to 24 Jun 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY)?From the records · HARERA, read 4 Nov 2026

"ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY) is in Rewari; the site address declared to HARERA is Sector-26, Garhi Bolni Road, Rewari. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY)?From the records · HARERA, read 4 Nov 2026

"ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY) is a B. M. Gupta Developers project, registered by its company B M GUPTA DEVELOPERS PVT LTD.

The source ↗B. M. Gupta Developers's projects and court record

The records

What the registers hold for "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 242/2017,: Registration expired. Ended 24 Jun 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 35 OF 2009 is on the DTCP register, valid to 10 Jul 2027.DTCP, read 3 Nov 2026
The court record of B. M. Gupta Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 24 Jun 2025. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 8 HARERA files, with the dates we read them
Registration no.
242/2017,
Registration valid till
24 Jun 2025
Declared possession
31 Jan 2024

Declared by the promoter to HARERA

Land area
0.638 (Sqr/mtrs)
FAR
0.57 proposed of 0.59 permissible
licence
35 of 2009 (11.07.2009)
Estimated project cost
the application prints ₹8.23 lakh crore, which is not a plausible figure
Cost of land
₹47250.00 crore
Construction to start
1 Feb 2022
Completion declared for
31 Jan 2024
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 4 units · 1 tower
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (11 Jul 2009)
  • II. BUILDING PLAN — declared: already been obtained (3 Oct 2012)
  • III. FIRE FIGHTING SCHEME — declared: already been obtained (17 Jul 2013)
  • IV. ELECTRIFICATION SCHEME — declared: already been obtained (4 Nov 2011)
  • V. RECYCLED WATER USAGE — declared: already been obtained (10 Mar 2015)
  • VI. CONSENT TO ESTABLISH — declared: already been obtained (16 Nov 2012)
  • VII. ENVIRONMENTAL CLEARANCE — declared: already been obtained (5 May 2010)
  • VIII. FOREST LAWS — declared: already been obtained (6 Jun 2012)
  • IX. AAI HEIGHT CLEARANCE — declared: already been obtained (25 May 2016)
  • X. RERA REGISTRATION CERTIFICATE — declared: already been obtained (26 Sept 2017)
On file with HARERA · 8 files

On file with HARERA (8)

Plans

Site plan

1 file
Approved Site Plan6 Jul 2019

Layout plan

1 file
Latest Layout Plan6 Jul 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation certificate uploaded19 May 2025

DTCP licence

1 file
Licence Copy with Land Schedule6 Jul 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA3 Jul 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit3 Jul 2019

HARERA’s orders

HARERA’s orders

2 files
Corrigendum of area changed uploaded12 Mar 2025Extension Granted12 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

35 OF 2009 · BM Gupta Developers Pvt Ltd · REWARI

Licence valid to 10 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 6 Jul 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

35 OF 2009: 103 parcels, 51.7938 acres in all, in Padiyawas (hadbast 172), Dhaliawas (hadbast 173) and Dhamlaka (hadbast 155), tehsil Rewari.

The licence register prints the licensed area as 52.22 acres.

  • 23//17/13 kanal 9 marlaPadiyawas (172)
  • 23//17/24 kanal 16 marlaPadiyawas (172)
  • 23//18/12 kanal 9 marlaPadiyawas (172)
  • 23//18/24 kanal 18 marlaPadiyawas (172)
Show the other 99 parcels
  • 23//21/17 marlaPadiyawas (172)
  • 23//21/27 kanalPadiyawas (172)
  • 23//238 kanalPadiyawas (172)
  • 23//248 kanalPadiyawas (172)
  • 23//25/12 kanal 8 marlaPadiyawas (172)
  • 23//25/21 kanal 10 marlaPadiyawas (172)
  • 25//5/11 kanal 19 marlaPadiyawas (172)
  • 25//5/23 kanal 1 marlaPadiyawas (172)
  • 26//1/18 marlaPadiyawas (172)
  • 26//1/27 kanal 12 marlaPadiyawas (172)
  • 26//10/1/16 kanal 5 marlaPadiyawas (172)
  • 26//10/1/25 marlaPadiyawas (172)
  • 26//9/15 kanal 17 marlaPadiyawas (172)
  • 26//9/13 marlaPadiyawas (172)
  • 24//16/2/12 kanal 18 marlaPadiyawas (172)
  • 24//16/2/23 kanal 2 marlaPadiyawas (172)
  • 24//17/2/11 kanalPadiyawas (172)
  • 24//17/2/22 kanal 2 marlaPadiyawas (172)
  • 24//25/16 kanal 4 marlaPadiyawas (172)
  • 24//25/22 kanal 8 marlaPadiyawas (172)
  • 33//14/14 kanalDhaliawas (173)
  • 33//157 kanal 8 marlaDhaliawas (173)
  • 33//167 kanal 8 marlaDhaliawas (173)
  • 33//258 kanalDhaliawas (173)
  • 33//4/24 kanalDhaliawas (173)
  • 33//58 kanalDhaliawas (173)
  • 33//67 kanal 9 marlaDhaliawas (173)
  • 33//77 kanal 10 marlaDhaliawas (173)
  • 33//710 marlaDhaliawas (173)
  • 34//10/15 kanal 4 marlaDhaliawas (173)
  • 34//10/22 kanal 13 marlaDhaliawas (173)
  • 34//118 kanalDhaliawas (173)
  • 34//12/12 kanal 16 marlaDhaliawas (173)
  • 34//12/25 kanal 4 marlaDhaliawas (173)
  • 34//138 kanal 2 marlaDhaliawas (173)
  • 34//17/11 kanal 1 marlaDhaliawas (173)
  • 34//17/22 kanal 7 marlaDhaliawas (173)
  • 34//207 kanal 7 marlaDhaliawas (173)
  • 34//218 kanalDhaliawas (173)
  • 34//24/22 kanal 16 marlaDhaliawas (173)
  • 34//84 kanal 18 marlaDhaliawas (173)
  • 34//9/15 kanal 4 marlaDhaliawas (173)
  • 34//9/22 kanal 16 marlaDhaliawas (173)
  • 35//11/111 marlaDhaliawas (173)
  • 35//11/24 kanal 1 marlaDhaliawas (173)
  • 35//20/12 kanal 12 marlaDhaliawas (173)
  • 35//20/22 kanal 12 marlaDhaliawas (173)
  • 36//15/3/116 marlaDhaliawas (173)
  • 36//15/3/21 kanal 17 marlaDhaliawas (173)
  • 36//16/12 kanal 18 marlaDhaliawas (173)
  • 36//16/24 marlaDhaliawas (173)
  • 37//58 kanalDhaliawas (173)
  • 37//66 kanalDhaliawas (173)
  • 3//117 kanal 11 marlaDhamlaka (155)
  • 3//12/12 kanal 4 marlaDhamlaka (155)
  • 3//12/23 kanal 5 marlaDhamlaka (155)
  • 3//132 kanal 16 marlaDhamlaka (155)
  • 3//16/2/14 marlaDhamlaka (155)
  • 3//16/2/21 kanal 14 marlaDhamlaka (155)
  • 3//17/1/12 kanal 8 marlaDhamlaka (155)
  • 3//17/1/23 kanal 7 marlaDhamlaka (155)
  • 3//17/2/114 marlaDhamlaka (155)
  • 3//17/2/21 kanal 7 marlaDhamlaka (155)
  • 3//18/13 kanal 2 marlaDhamlaka (155)
  • 3//18/24 kanal 18 marlaDhamlaka (155)
  • 3//19/13 kanal 2 marlaDhamlaka (155)
  • 3//19/24 kanal 18 marlaDhamlaka (155)
  • 3//20/13 kanal 2 marlaDhamlaka (155)
  • 3//20/24 kanal 18 marlaDhamlaka (155)
  • 3//218 kanalDhamlaka (155)
  • 3//228 kanalDhamlaka (155)
  • 3//23/22 kanal 1 marlaDhamlaka (155)
  • 3//24/26 kanal 8 marlaDhamlaka (155)
  • 3//25/11 kanal 16 marlaDhamlaka (155)
  • 6//4/26 kanal 8 marlaDhamlaka (155)
  • 6//5/11 kanal 16 marlaDhamlaka (155)
  • 36//18 kanalDhaliawas (173)
  • 36//108 kanalDhaliawas (173)
  • 36//15/1/116 marlaDhaliawas (173)
  • 36//15/1/21 kanal 17 marlaDhaliawas (173)
  • 36//15/2/116 marlaDhaliawas (173)
  • 36//15/2/21 kanal 17 marlaDhaliawas (173)
  • 36//3/15 kanal 14 marlaDhaliawas (173)
  • 36//3/21 kanal 2 marlaDhaliawas (173)
  • 36//87 kanal 8 marlaDhaliawas (173)
  • 34//18/13 kanal 2 marlaDhaliawas (173)
  • 34//18/24 kanal 18 marlaDhaliawas (173)
  • 34//19/14 kanal 4 marlaDhaliawas (173)
  • 34//19/23 kanal 4 marlaDhaliawas (173)
  • 34//22/12 kanal 4 marlaDhaliawas (173)
  • 34//22/25 kanal 4 marlaDhaliawas (173)
  • 34//238 kanalDhaliawas (173)
  • 34//24/14 kanal 12 marlaDhaliawas (173)
  • 23//19/12 kanal 5 marlaPadiyawas (172)
  • 23//19/24 kanal 11 marlaPadiyawas (172)
  • 23//227 kanalPadiyawas (172)
  • 23//2219 marlaPadiyawas (172)
  • 26//28 kanalPadiyawas (172)
  • 3//24/210 marlaDhamlaka (155)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Rewari, then the tehsil and the village you want: Padiyawas (hadbast 172), Dhaliawas (hadbast 173) or Dhamlaka (hadbast 155), tehsil Rewari. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//17/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Jul 2019

Layout plan

1 file
Latest Layout Plan6 Jul 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (8 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/708 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on B. M. Gupta Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.