About this project

Key facts

Location
Faridabad
Carpet area
about 960 sq ft
In m²about 89.1 m², the average flat, as declared
Registered by
BPTP LIMITEDthe company that filed it, for BPTP
Timeline
  1. 31 May 2011Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 12 Oct 2020Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Aug 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside75,259.868 acres in all, by use
  • Apartment buildings75,259.868 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot provided.
  • KitchenDADO: 2.0 INCH above kitchen counter, REST OBD. platform: granite counter with singly bowl stainless steel sink with drain board.
  • WardrobesNot provided.
  • FloorsVitrified tiles in living rooms & bedroom. laminated wooden flooring/vitrified tiles in master bedroom. anti-skid ceramic tiles in kitchen. anti-skid ceramic tiles in toilets and balcony. select granite/marble in staircase. vitrified tiles in lift lobby (typical floors
  • WallsOBD in in living room, dining and bedroom. selected marble/granite cladding lift / lobbies and acrylic emulsion. external FAçADE of towers- texture paints
  • BathroomsDADO: select ceramic tiles fittings: grante/ marble counters, white sanitary fixtures, contemporary styled CP fittings
  • WindowsBasic windows
  • Main doorSeasoned wood.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 80, FARIDABAD

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 10
  • Other register states: 5

Questions buyers ask

Is PARK ARENA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-FBD-260-2021. The register’s record shows an end date of 31 Aug 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for PARK ARENA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 12 Oct 2020. Its registration runs to 31 Aug 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PARK ARENA?From the records · HARERA, read 4 Nov 2026

PARK ARENA is in Faridabad; the site address declared to HARERA is Sector 80, Faridabad. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PARK ARENA?From the records · HARERA, read 4 Nov 2026

PARK ARENA is a BPTP project, registered by its company BPTP LIMITED.

The source ↗BPTP's projects and court record

The records

What the registers hold for PARK ARENA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-FBD-260-2021: Registration lapsed. The register’s record shows an end date of 31 Aug 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 1271 OF 2006, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
  • Plans approved, as the developer declared: layout plan 31 May 2011, building plans 31 May 2011.Declared to HARERA, read 29 Oct 2026
The court record of BPTP’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Aug 2025. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 5 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-FBD-260-2021
Registration valid till
31 Aug 2025
Declared possession
12 Oct 2020

Declared by the promoter to HARERA

Land area
75259.868 (Acre) (as printed; not a plausible area)
FAR
1.75 proposed of 1.75 permissible
licence
1269-1271 of 2006
Estimated project cost
₹300.45 crore
Cost of land
₹15.19 crore
Layout plan, declared approved (field 5a)
31 May 2011
Building plans, declared approved
31 May 2011
Completion declared for
12 Oct 2020
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENTS · 624 units · 55,623.98 sq m carpet · total for 624 flats, about 89.1 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE NO (1269-1271 OF 2006) — declared: already been obtained (11 Nov 2006)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (31 May 2011)
  • III. ENVIRONMENTAL CLERANCE — declared: already been obtained (31 Dec 2012)
  • IV. ZONNING PLAN — declared: already been obtained (28 Jun 2007)
  • V. ELECTRICAL LOAD APPROVAL — declared: already been obtained (10 Oct 2011)
On file with HARERA · 5 files

On file with HARERA (5)

Plans

Site plan

1 file
Approved Site Plan11 Aug 2020

Layout plan

1 file
Latest Layout Plan11 Aug 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule11 Aug 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA11 Aug 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Aug 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 1271 OF 2006. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 14 Aug 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Aug 2020

Layout plan

1 file
Latest Layout Plan11 Aug 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (5 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1420 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on BPTP

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.