Skip to content

PARSVNATH CITY , SONEPAT(20.159 ACRES)

by Parsvnath Developers · Sonipat

Not on our price list yet

Possession 30 Jun 2019 · as the developer declared it to HARERA

About this project

Key facts

Registered by
PARSVNATH DEVELOPERS LIMITEDthe company that filed it, for Parsvnath Developers
Timeline
  1. 1 May 2006Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Jun 2007Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Jun 2019Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Jun 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

Left out of the sizes: 161 villas, whose size on the form may be the plot. No carpet range is shown. Declared to HARERA, read 29 Oct 2026. See it on HARERA ↗

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside84.155 acres in all, by use
  • Plots for sale34.349 acres · 41%
  • Roads24.61 acres · 29%
  • Other uses8.351 acres · 10%
  • Parks and playgrounds7.394 acres · 9%
  • Apartment buildings6.485 acres · 8%
  • Green belts2.436 acres · 3%
  • Sewage and waste treatment0.53 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVilla - NA MALL - water COOL system and mechanical ventilation through centrifugal fans
  • KitchenVilla - platform with top MALL - NA
  • Kitchen appliancesVilla - NA
  • LiftsVilla - NA MALL - 6 lifts & 10 escalators
  • WardrobesVilla - NA
  • FloorsVillas - vetrified/ceramic tiles/green marble, MALL - common area – VDF/KOTA, polished granite/vitrified tiles or equivalent, marble/ ceramic tile shops - marble/ ceramic tile. toilets - combination of stone/granite/vitrified/ceramic tiles.
  • WallsVilla - OBD on plaster MALL - common area – stone/vitrified tiles/stainless steel/textured paint covering, white WASH shops - plastering and OBD toilets – N/a celling - white WASH, POP gypsum
  • BathroomsVilla - CP /china WARE of approved manufacturer. MALL - chinaware and CP fittings. electrical HAND dryer.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-08, NH-1, SONEPAT

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 7

Questions buyers ask

Is PARSVNATH CITY , SONEPAT(20.159 ACRES) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 332 OF 2017. The register’s record shows an end date of 30 Jun 2021. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for PARSVNATH CITY , SONEPAT(20.159 ACRES)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2019. Its registration runs to 30 Jun 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PARSVNATH CITY , SONEPAT(20.159 ACRES)?From the records · HARERA, read 4 Nov 2026

PARSVNATH CITY , SONEPAT(20.159 ACRES) is in Sonipat; the site address declared to HARERA is Sector-08, Nh-1, Sonepat. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PARSVNATH CITY , SONEPAT(20.159 ACRES)?From the records · HARERA, read 4 Nov 2026

PARSVNATH CITY , SONEPAT(20.159 ACRES) is a Parsvnath Developers project, registered by its company PARSVNATH DEVELOPERS LIMITED.

The source ↗Parsvnath Developers's projects and court record

The records

What the registers hold for PARSVNATH CITY , SONEPAT(20.159 ACRES): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 332 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Jun 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 945 OF 2006, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
  • Plans approved, as the developer declared: layout plan 1 May 2006, building plans 1 Jun 2007.Declared to HARERA, read 29 Oct 2026
The court record of Parsvnath Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Jun 2021. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
Registration no.
332 OF 2017
Registration valid till
30 Jun 2021
Declared possession
30 Jun 2019

Declared by the promoter to HARERA

Land area
84.155 (Acre) (3,40,563.2 sq m)
FAR
0 proposed
licence
915-945 of 2006(07-05-2019)
Estimated project cost
₹130.03 crore
Cost of land
₹15.10 crore
Layout plan, declared approved (field 5a)
1 May 2006
Building plans, declared approved
1 Jun 2007
Completion declared for
30 Jun 2019
Declared inventory · 2 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type MALL (15 TO 710 SQ. MTR.) · 252 units · 15 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type VILLAS (162 SQ. MTR.) · 161 units · 162 sq m, as printed · a home whose size on the form may be the plot, left out of carpet sizes
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. SERVICE ESTIMATES PLAN — declared: already been obtained (29 Dec 2012)
On file with HARERA · 10 files

On file with HARERA (10)

Plans

Site plan

1 file
Approved Site Plan1 Nov 2019

Layout plan

1 file
Latest Layout Plan1 Nov 2019

Zoning plan

1 file
Zoning Plan1 Nov 2019

Demarcation plan

1 file
Demarcation Plan1 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set1 Nov 2019

Services

Service plans

1 file
Service Plans on the Layout1 Nov 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule1 Nov 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration1 Nov 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA1 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 945 OF 2006. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 1 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan1 Nov 2019

Layout plan

1 file
Latest Layout Plan1 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set1 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (10 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/357 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Parsvnath Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.