Pyramid Fusion Homes

by Pyramid Infratech · Sector 70, Gurugram

Not on our price list yet

Possession 16 May 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
578–599 sq ft
In m²about 54–56 m², as declared
Registered
21 Feb 2019
Registered by
PYRAMID INFRATECH PRIVATE LIMITEDthe company that filed it, for Pyramid Infratech
Timeline
  1. 23 Jan 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 21 Feb 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 16 May 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 20 Aug 2024Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

738homes, 578 to 599 sq ft of carpet area
  • Under 1,000 sq ft578–599 sq ft738

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 53 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,715 m² in all, by use
  • Roads5,877 m² · 28%
  • Parks and playgrounds4,357 m² · 21%
  • Apartment buildings3,609 m² · 17%
  • Parking3,602 m² · 17%
  • Other usesas the form names them: Area2,680 m² · 13%
  • Sewage and waste treatment295 m² · 1%
  • Club house200 m² · under 1%
  • Electricity sub-station94 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Kitchen2 FEET tile on wall, OBD/colour WASH on remaing wall, tile/stone on kitchen counter.
  • Lifts2 lifts as per sanctioned PLAN
  • FloorsTiles/IPS
  • WallsOBD/colour WASH
  • BathroomsCP/PVC fittings
  • WindowsGlazed windows 4 MM glass
  • Main doorFlush door
  • Electrical fittingsISI MARK

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Pyramid Fusion Homes registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/316/48/2019/10, registered on 21 Feb 2019. Ended 20 Aug 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Pyramid Fusion Homes?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 16 May 2023. Its registration runs to 20 Aug 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Pyramid Fusion Homes?From the records · Map pin and road lines, read 6 Sep 2026

Pyramid Fusion Homes is in Sector 70, Gurugram; the site address declared to HARERA is Village Palra Sector 70a. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Pyramid Fusion Homes?From the records · HARERA, read 4 Nov 2026

Pyramid Fusion Homes is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PRIVATE LIMITED.

The source ↗Pyramid Infratech's projects and court record

The records

What the registers hold for Pyramid Fusion Homes: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/316/48/2019/10: Registration expired. Ended 20 Aug 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 84 OF 2018 is on the DTCP register: Licence lapsed; the register prints its validity to 9 Sep 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Jan 2019, building plans 23 Jan 2019.Declared to HARERA, read 29 Oct 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 20 Aug 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 84 OF 2018 lapsed

    Named in this project’s application. Valid to 9 Sep 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
GGM/316/48/2019/10
Registration date
21 Feb 2019
Registration valid till
20 Aug 2024
Declared possession
16 May 2023

Declared by the promoter to HARERA

Land area
5.11875 (Acre) (20,714.85 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
84 OF 2018
Estimated project cost
₹150.34 crore
Cost of land
₹28.50 crore
Layout plan, declared approved (field 5a)
23 Jan 2019
Building plans, declared approved
23 Jan 2019
Construction to start
30 May 2019
Completion declared for
16 May 2023
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 362 units · 54.919 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 188 units · 53.933 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 94 units · 53.723 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 94 units · 55.605 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 25 units · 21.045 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 14 units · 10.52 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 14 units · 21.045 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE COPY — declared: already been obtained (10 Dec 2018)
  • II. NOC FROM HUDA/GMDA FOR USE OF STP WATER FOR CONSTRUCTION — declared: already been obtained (3 Jan 2019)
  • III. FOREST NOC — declared: already been obtained (3 Oct 2018)
  • IV. AIRPORT HEIGHT CLEARANCE NOC — declared: applied for but yet to receive (24 Jan 2019)
  • V. SERVICES ESTIMATES AND PLANS — declared: applied for but yet to receive (30 Jan 2019)
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan31 Jan 2019

Layout plan

1 file
Latest Layout Plan31 Jan 2019

Zoning plan

1 file
Zoning Plan31 Jan 2019

Demarcation plan

1 file
Demarcation Plan31 Jan 2019

Building plans

1 file
Approved Building Plans, Full Set16 Feb 2019

Services

Service plans

1 file
Service Plans on the Layout31 Jan 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate20 Sept 2024

DTCP licence

1 file
Licence Copy with Land Schedule31 Jan 2019

Other NOCs and clearances

2 files
NOC Height Clearance16 Feb 2019NOC STP Water16 Feb 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration31 Jan 2019

Money

Accounts and finance

2 files
Cash Flow Statement31 Jan 2019Non-Default Certificate from a CA31 Jan 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Feb 2019

HARERA’s orders

HARERA’s orders

1 file
EXTENSION NO. 10 of 2023 DATED 08.05.202315 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

84 OF 2018 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR

Licence valid to 9 Sept 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Jan 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

84 OF 2018: 13 parcels, 5.1188 acres in all, in Palda (hadbast 164), tehsil Badshahpur.

The licence register prints the same licensed area, 5.1188 acres.

  • 10//148 kanal
  • 10//15/25 kanal 11 marla
  • 10//16/13 kanal 3 marla
  • 10//178 kanal
Show the other 9 parcels
  • 10//18/1/1/29 marla
  • 10//18/1/21 kanal 17 marla
  • 10//19/1/25 marla
  • 10//19/24 kanal 11 marla
  • 10//22/2/1 min9 marla
  • 10//23/1/1 min3 kanal 10 marla
  • 10//24/13 kanal 12 marla
  • 10//26/1/24 marla
  • 10//26/21 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//14.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Pyramid Fusion Homes”, by M/s Pyramid Infratech Pvt. Ltd., code Gurgaon-0619-000731, approved 2019.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan31 Jan 2019

Layout plan

1 file
Latest Layout Plan31 Jan 2019

Building plans

1 file
Approved Building Plans, Full Set16 Feb 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/402 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.