SAMSARA VILASA & SAMSARA ARYA

by Adani Brahma Synergy · Sector 32, Gurugram

Not on our price list yet

Possession 31 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 32, Gurugram0.4 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,109–2,242 sq ft
In m²about 103–208 m², as declared
Registered by
ADANI BRAHMA SYNERGY PRIVATE LIMITEDthe company that filed it, for Adani Brahma Synergy
Timeline
  1. 2 Nov 2016Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Nov 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

84homes, 1,109 to 2,242 sq ft of carpet area
  • 1,000–1,500 sq ft1,109–1,309 sq ft8
  • 1,500–2,000 sq ft1,587–1,860 sq ft44
  • 2,000–2,500 sq ft2,098–2,242 sq ft32

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7,388 m² in all, by use
  • Apartment buildings7,388 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV airconditioning in living/dining & all bedrooms
  • KitchenModular kitchen with hob
  • Kitchen appliancesModular kitchen with hob
  • Lifts5/6 passengers
  • FloorsImported marble/vitrified tiles/ceramic tiles
  • WallsAcrylic emulsion paint
  • BathroomsJaquar or equivalent
  • WindowsToughened glass aluminium windows

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 32, GurugramSector 32, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.4 km
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20256.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

5 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SAMSARA VILASA & SAMSARA ARYA registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/647/379/2022/122. Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for SAMSARA VILASA & SAMSARA ARYA?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SAMSARA VILASA & SAMSARA ARYA?From the records · Map pin and road lines, read 6 Sep 2026

SAMSARA VILASA & SAMSARA ARYA is in Sector 32, Gurugram; the site address declared to HARERA is Plot No. 83, Sector-32, Gurugram. In a straight line it is about 0.4 km from Delhi–Gurugram–SNB RRTS, 0.8 km from Sohna Elevated Corridor (NH-248A) and 6.5 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SAMSARA VILASA & SAMSARA ARYA?From the records · HARERA, read 3 Nov 2026

SAMSARA VILASA & SAMSARA ARYA is a Adani Brahma Synergy project, registered by its company ADANI BRAHMA SYNERGY PRIVATE LIMITED.

The source ↗Adani Brahma Synergy's projects and court record

The records

What the registers hold for SAMSARA VILASA & SAMSARA ARYA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/647/379/2022/122: Registered. Valid to 31 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 2 Nov 2016, building plans 24 Nov 2021.Declared to HARERA, read 29 Oct 2026
The court record of Adani Brahma Synergy’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
Registration no.
GGM/647/379/2022/122
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2026

Declared by the promoter to HARERA

Land area
1.8256 (Acre) (7,387.94 sq m)
FAR
2.16 proposed of 2.31 permissible
licence
NA
Estimated project cost
₹195.91 crore
Cost of land
₹35.82 crore
Layout plan, declared approved (field 5a)
2 Nov 2016
Building plans, declared approved
24 Nov 2021
Construction to start
1 Jan 2023
Completion declared for
31 Dec 2026
Declared inventory · 13 types

Declared inventory — 13 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 4 units · 151.22 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 194.94 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 195.91 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 147.46 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 121.62 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 103.06 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 161.17 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 155.05 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. CONVEYANCE DEED (J-85, J-86,J-87,J-88,J-89,J-90,J-119,J-120,J-121,J-122,J-123) — declared: already been obtained (8 Oct 2018)
  • II. CONVEYANCE DEED (J-113, J-114) — declared: already been obtained (15 Mar 2021)
  • III. CONVEYANCE DEED (J-115,J-144) — declared: already been obtained (26 Nov 2019)
  • IV. CONVEYANCE DEED (M-26) — declared: already been obtained (9 Oct 2018)
  • V. CONVEYANCE DEED (M-24,M-25,M-81,M-35,M-50) — declared: already been obtained (26 Nov 2019)
  • VI. BR-III (J-85, J-86,J-87,J-88,J-89,J-90,J-119,J-121,J-123,J-144) — declared: already been obtained (24 Nov 2021)
  • VII. BR-III (J-113, J-114, J-115) — declared: already been obtained (18 Nov 2021)
  • VIII. BR-III (J-120, J-122) — declared: already been obtained (11 Nov 2021)
  • IX. BR-III (M-24, M-25) — declared: already been obtained (18 Nov 2021)
  • X. BR-III (M-26, M-81) — declared: already been obtained (17 Nov 2021)
  • XI. BR-III (M-35, M-50) — declared: already been obtained (16 Nov 2021)
On file with HARERA · 22 files

On file with HARERA (22)

Plans

Site plan

1 file
Approved Site Plan10 Jan 2022

Layout plan

1 file
Latest Layout Plan4 Jan 2022

Zoning plan

1 file
Zoning Plan10 Jan 2022

Demarcation plan

1 file
Demarcation Plan10 Jan 2022

Building plans

7 files
Building Plan- J113 to J11519 Nov 2022Building Plan- J85 to J8719 Nov 2022Building Plan- J88 to J9019 Nov 2022

Services

Service plans

1 file
Service Plans on the Layout10 Jan 2022

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded5 Feb 2026

DTCP licence

1 file
Licence Copy with Land Schedule4 Jan 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration10 Jan 2022

Money

Accounts and finance

3 files
Cash Flow Statement10 Jan 2022CA Certificate on the Application’s Figures10 Jan 2022Non-Default Certificate from a CA10 Jan 2022

The promoter’s papers

Declarations and affidavits

4 files
Promoter Affidavit22 Nov 2022The Promoter’s Declaration on Affidavit10 Jan 2022Promoter Affidavit10 Jan 2022Bank Undertaking10 Jan 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared NA. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan10 Jan 2022

Layout plan

1 file
Latest Layout Plan4 Jan 2022

Building plans

7 files
Building Plan- J113 to J11519 Nov 2022Building Plan- J85 to J8719 Nov 2022Building Plan- J88 to J9019 Nov 2022Building Plan- J119 to J12319 Nov 2022Building Plan- J144 & M24 to M2619 Nov 2022Building Plan- M35, M50 & M8119 Nov 2022Approved Building Plans, Full Set10 Jan 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1803 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adani Brahma Synergy

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.