SAMSARA VILASA & SAMSARA ARYA
by Adani Brahma Synergy · Sector 32, Gurugram
Not on our price list yet
Possession 31 Dec 2026 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 32, Gurugram0.4 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- ADANI BRAHMA SYNERGY PRIVATE LIMITEDthe company that filed it, for Adani Brahma Synergy
- 2 Nov 2016Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 24 Nov 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,109–1,309 sq ft8
- 1,500–2,000 sq ft1,587–1,860 sq ft44
- 2,000–2,500 sq ft2,098–2,242 sq ft32
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings7,388 m² · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV airconditioning in living/dining & all bedrooms
- KitchenModular kitchen with hob
- Kitchen appliancesModular kitchen with hob
- Lifts5/6 passengers
- FloorsImported marble/vitrified tiles/ceramic tiles
- WallsAcrylic emulsion paint
- BathroomsJaquar or equivalent
- WindowsToughened glass aluminium windows
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.4 km
- Sohna Elevated Corridor (NH-248A)0.8 km
- Dwarka ExpresswayOpen, 17 Aug 20256.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 2
- Other register states: 2
Other projects nearby
5 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Adani Brahma Synergy | Same sector | — | — | 30 Sep 2023 | |
| Godrej Highview | 0.9 kmto its sector’s point | New launch | ₹25,000/sq ft | 30 Apr 2032 | |
CENTRAL AVENUENo photo on file yet | Antriksh India Projects | 1.8 kmto its sector’s point | — | — | 1 Feb 2025 |
The DualisNo photo on file yet | Shapoorji | 2.0 kmto its sector’s point | Under construction | ₹25,000/sq ft | 31 Dec 2031 |
LUXURY VILLANo photo on file yet | Luxury Infrastructure | 2.4 kmto its sector’s point | — | — | 26 Mar 2021 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is SAMSARA VILASA & SAMSARA ARYA registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/647/379/2022/122. Valid to 31 Dec 2026.
The source ↗What is the possession timeline for SAMSARA VILASA & SAMSARA ARYA?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SAMSARA VILASA & SAMSARA ARYA?From the records · Map pin and road lines, read 6 Sep 2026
SAMSARA VILASA & SAMSARA ARYA is in Sector 32, Gurugram; the site address declared to HARERA is Plot No. 83, Sector-32, Gurugram. In a straight line it is about 0.4 km from Delhi–Gurugram–SNB RRTS, 0.8 km from Sohna Elevated Corridor (NH-248A) and 6.5 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SAMSARA VILASA & SAMSARA ARYA?From the records · HARERA, read 3 Nov 2026
SAMSARA VILASA & SAMSARA ARYA is a Adani Brahma Synergy project, registered by its company ADANI BRAHMA SYNERGY PRIVATE LIMITED.
The source ↗Adani Brahma Synergy's projects and court recordThe records
What the registers hold for SAMSARA VILASA & SAMSARA ARYA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/647/379/2022/122: Registered. Valid to 31 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 2 Nov 2016, building plans 24 Nov 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration ends soon
Valid to 31 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
- Registration no.
- GGM/647/379/2022/122
- Registration valid till
- 31 Dec 2026
- Declared possession
- 31 Dec 2026
Declared by the promoter to HARERA
- Land area
- 1.8256 (Acre) (7,387.94 sq m)
- FAR
- 2.16 proposed of 2.31 permissible
- licence
- NA
- Estimated project cost
- ₹195.91 crore
- Cost of land
- ₹35.82 crore
- Layout plan, declared approved (field 5a)
- 2 Nov 2016
- Building plans, declared approved
- 24 Nov 2021
- Construction to start
- 1 Jan 2023
- Completion declared for
- 31 Dec 2026
Declared inventory · 13 types
Declared inventory — 13 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 151.22 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 194.94 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 195.91 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 147.46 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 121.62 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 103.06 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 161.17 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 155.05 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. CONVEYANCE DEED (J-85, J-86,J-87,J-88,J-89,J-90,J-119,J-120,J-121,J-122,J-123) — declared: already been obtained (8 Oct 2018)
- II. CONVEYANCE DEED (J-113, J-114) — declared: already been obtained (15 Mar 2021)
- III. CONVEYANCE DEED (J-115,J-144) — declared: already been obtained (26 Nov 2019)
- IV. CONVEYANCE DEED (M-26) — declared: already been obtained (9 Oct 2018)
- V. CONVEYANCE DEED (M-24,M-25,M-81,M-35,M-50) — declared: already been obtained (26 Nov 2019)
- VI. BR-III (J-85, J-86,J-87,J-88,J-89,J-90,J-119,J-121,J-123,J-144) — declared: already been obtained (24 Nov 2021)
- VII. BR-III (J-113, J-114, J-115) — declared: already been obtained (18 Nov 2021)
- VIII. BR-III (J-120, J-122) — declared: already been obtained (11 Nov 2021)
- IX. BR-III (M-24, M-25) — declared: already been obtained (18 Nov 2021)
- X. BR-III (M-26, M-81) — declared: already been obtained (17 Nov 2021)
- XI. BR-III (M-35, M-50) — declared: already been obtained (16 Nov 2021)
On file with HARERA · 22 files
On file with HARERA (22)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
7 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared NA. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2022 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
7 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1803 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Adani Brahma Synergy
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.