THE ORYZA

by Breez Builders and Developers · Gurugram

Not on our price list yet

Possession 31 Dec 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 1,227 sq ft
In m²about 114 m², the average flat, as declared
Registered by
AURA BUILDERS AND DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Breez Builders and Developers
Timeline
  1. 21 Jan 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2033Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.655 acres in all, by use
  • Other uses1.595 acres · 34%
  • Roads1.181 acres · 25%
  • Parks and playgrounds0.964 acres · 21%
  • Club house0.375 acres · 8%
  • Apartment buildings0.357 acres · 8%
  • Pavements0.183 acres · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV/VRF
  • KitchenStone / tile / equivalent; combination of tile DADO and premium acrylic emulsion paint; premium acrylic emulsion paint; granite/vitronite tiles/quartz; CP fittings, SS sink
  • FloorsImported marble / stone / laminated wooden flooring / anti-skid vitrified tiles / vitrified tiles and equivalents
  • WallsPremium acrylic emulsion paint / combination of tile DADO and premium acrylic emulsion paint / combination of tiles, premium acrylic emulsion paint / oil bound distemper and equivalents
  • BathroomsSanitary and CP fittings
  • WindowsAluminium frames / UPVC with clear frosted glass
  • Main doorPolished / painted frame with veneered / laminated flush door
  • Electrical fittingsHeavy DUTY conduting modular switches,C curve MCB

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: 88A, GURUGRAM

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 7
  • Other register states: 1

Questions buyers ask

Is THE ORYZA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1043/775/2026/15. Valid to 30 Sep 2033.

The source ↗
What is the possession timeline for THE ORYZA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2033. Its registration runs to 30 Sep 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE ORYZA?From the records · HARERA, read 4 Nov 2026

THE ORYZA is in Gurugram; the site address declared to HARERA is 88a, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE ORYZA?From the records · HARERA, read 4 Nov 2026

THE ORYZA is a Breez Builders and Developers project, registered by its company AURA BUILDERS AND DEVELOPERS PRIVATE LIMITED.

The source ↗Breez Builders and Developers's projects and court record

The records

What the registers hold for THE ORYZA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1043/775/2026/15: Registered. Valid to 30 Sep 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 98 OF 2025 is on the DTCP register, valid to 12 Jun 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 21 Jan 2026.Declared to HARERA, read 29 Oct 2026
The court record of Breez Builders and Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
Registration no.
GGM/1043/775/2026/15
Registration valid till
30 Sept 2033
Declared possession
31 Dec 2033

Declared by the promoter to HARERA

Land area
4.6545 (Acre) (18,836.09 sq m)
FAR
2.61 proposed of 2.62 permissible
licence
98 of 2025 Dated 13.06.2025
Estimated project cost
₹1321.97 crore
Cost of land
₹441.34 crore
Building plans, declared approved
21 Jan 2026
Construction to start
1 Oct 2026
Completion declared for
31 Dec 2033
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 8 units · 674.56 sq m carpet · 2 towers · total for 8 flats, about 84.3 m² each
  • Apartment/Shops/Other Buildings · 172 units · 18,180.4 sq m carpet · 2 towers · total for 172 flats, about 105.7 m² each
  • Apartment/Shops/Other Buildings · 80 units · 9,758.4 sq m carpet · 2 towers · total for 80 flats, about 122 m² each
  • Apartment/Shops/Other Buildings · 84 units · 10,589.04 sq m carpet · 2 towers · total for 84 flats, about 126.1 m² each
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. SEWAGE DISPOSAL ASSURANCE — declared: already been obtained (13 Nov 2025)
  • II. STORM WATER DRAINAGE — declared: already been obtained (14 Nov 2025)
  • III. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (3 Sept 2025)
  • IV. PHASING LETTER — declared: already been obtained (30 Sept 2025)
  • V. BR-III — declared: already been obtained (21 Jan 2026)
  • VI. ELECTRICAL LOAD — declared: already been obtained (8 Jul 2025)
  • VII. FOREST NOC — declared: already been obtained (17 Apr 2025)
  • VIII. AAI — declared: already been obtained (3 Sept 2025)
  • IX. LICENSE — declared: already been obtained (13 Jun 2025)
  • X. WATER SUPPLY ASSURANCE — declared: already been obtained (14 Nov 2025)
  • XI. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (30 Jan 2026)
  • XII. FIRE SCHEME — declared: applied for but yet to receive (7 Feb 2026)
  • XIII. SERVICE PLAN & ESTIMATES — declared: applied for but yet to receive (2 Feb 2026)
On file with HARERA · 65 files

On file with HARERA (65)

Plans

Site plan

6 files
Site Plan and Area Charts6 Mar 2026Superimposed Plan19 Feb 2026Site Plan Water Supply21 Jan 2026

Layout plan

3 files
Phasing Plan6 Mar 2026Phasing Plan22 Jan 2026Latest Layout Plan21 Jan 2026

Zoning plan

1 file
Zoning Plan21 Jan 2026

Demarcation plan

1 file
Demarcation Plan21 Jan 2026

Building plans

5 files
BR-III6 Mar 2026Tower A, B Terrace Floor Plan21 Jan 2026Tower A, B & Community Building Section21 Jan 2026

Floor plans

10 files
Basement -2 and Area Details6 Mar 2026Stilt Plan6 Mar 2026Basement -1 and Area Details21 Jan 2026

Services

Sewerage and drainage

2 files
Storm Water Assurance21 Jan 2026Sewerage Assurance21 Jan 2026

Water supply

1 file
Water Supply Assurance21 Jan 2026

Electricity

1 file
Electrical Load19 Feb 2026

Landscape and green areas

1 file
Green Area Calulcation6 Mar 2026

Service plans

2 files
Service Plans on the Layout6 Mar 2026Service Plan Estimate Applied19 Feb 2026

Approvals and clearances

DTCP licence

3 files
LOI21 Jan 2026LC-IV21 Jan 2026Licence Copy with Land Schedule21 Jan 2026

Environment clearance

1 file
EC Applied19 Feb 2026

Fire safety

1 file
Fire Scheme Applied19 Feb 2026

Other NOCs and clearances

2 files
AAI21 Jan 2026Forest NOC21 Jan 2026

Land records

Land records

8 files
Land Title Search Report6 Mar 2026Mutation19 Feb 2026Aks Shajra19 Feb 2026

Sales papers

Brochure and specifications

2 files
Advertisment6 Mar 2026Brochure6 Mar 2026

Money

Accounts and finance

4 files
Project Report6 Mar 2026Cash Flow Statement19 Feb 2026CA Certificate on the Application’s Figures19 Feb 2026Non-Default Certificate from a CA21 Jan 2026

Timeline and progress

Construction schedule

1 file
PERT Chart6 Mar 2026

The promoter’s papers

Declarations and affidavits

7 files
Undertaking Mining Permission6 Mar 2026Affidavit Origen6 Mar 2026Revenue Sharing Affidavit6 Mar 2026

Other filings

Other filings

3 files
Change of name of the Mix Land Use Colony project from "The Oryza" to "The Oryza by Origen Realty"9 Apr 2026Community Building Exit Capacity Calculation21 Jan 2026Phasing Letter21 Jan 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

98 OF 2025 · Aura Builders and Developers Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 12 Jun 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Jan 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

98 OF 2025: 11 parcels, 8.2625 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 8.2625 acres.

  • 72//38 kanal
  • 72//48 kanal
  • 72//6/2/22 kanal 2 marla
  • 72//88 kanal
Show the other 7 parcels
  • 72//98 kanal
  • 72//78 kanal
  • 56//228 kanal
  • 56//238 kanal
  • 56//21/22 kanal 14 marla
  • 55//24/22 kanal 13 marla
  • 55//25/22 kanal 13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 72//3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

6 files
Site Plan and Area Charts6 Mar 2026Superimposed Plan19 Feb 2026Site Plan Water Supply21 Jan 2026Site Plan Storm Water21 Jan 2026Site Plan Sewerage21 Jan 2026Approved Site Plan21 Jan 2026

Layout plan

3 files
Phasing Plan6 Mar 2026Phasing Plan22 Jan 2026Latest Layout Plan21 Jan 2026

Building plans

5 files
BR-III6 Mar 2026Tower A, B Terrace Floor Plan21 Jan 2026Tower A, B & Community Building Section21 Jan 2026Approved Building Plans, Full Set21 Jan 2026Tower A, B & Community Building Elevation21 Jan 2026

Floor plans

10 files
Basement -2 and Area Details6 Mar 2026Stilt Plan6 Mar 2026Basement -1 and Area Details21 Jan 2026Tower A, B & Community Building Third Floor Plan21 Jan 2026Tower A, B Typical Floor Plan21 Jan 2026Tower A, B & Community Building First Floor (Podium Lvl) Plan21 Jan 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3931 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Breez Builders and Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.