Skip to content

TULIP VIOLET

by Tulip Infratech · Gurugram

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,314–1,863 sq ft
In m²about 122–173 m², as declared
Registered by
TULIP INFRATECH PVT. LTDthe company that filed it, for Tulip Infratech
Timeline
  1. 20 Feb 2025Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 30 Dec 2032Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2032Possession, as declareddeclared to HARERA, read 15 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

214homes, 1,314 to 1,863 sq ft of carpet area
  • 1,000–1,500 sq ft1,314–1,370 sq ft61
  • 1,500–2,000 sq ft1,863 sq ft153

Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenMarble/granite counter with stainless steel sink, cpfittings and modular kitchen.
  • LiftsCapacity of 10 / 13 persons, KONE or equivalent
  • FloorsI) living/dining: tiles /imported marble II) master bedroom/dress room and bedroom : laminated woodenflooring III) kitchen: anti skid tiles / equivalent IV) alltoilets: premium quality tiles. V) SIT OUTS/balcony: antiskid ceramic tiles VI) utility room: vitrified tiles VII)utility toilet & balcony: anti skid ceramic floor tiles.
  • WallsI) living/dining, master bedroom, bedrooms: acrylicemulsion paint finish II) master toilet/dress room,toilets: premium quality tiles/mirror III) kitchen: 2’-0”DADO above counters and acrylic emulsion paint. IV)utility rooms/ utility balcony/utility toilet: oil boundpaint finish V) SIT OUTS/balcony: permanenttexture/paint finish.
  • BathroomsI) master toilet/dress room: sanitary WARE includeswash basin and EWC CP fittings: hot and cold waterwall and basin mixture of premium brands, handshower, health fauset& angle valve.
  • WindowsNergy efficient double glass aluminium /upvcglazings with FLY MESH shutter in all habitableareas & aluminium / UPVC frames with single glass inall toilets & utility rooms.
  • Main doorMoulded SKIN door / panel door shutters.
  • Electrical fittingsSwitches only (no lights& fixtures)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 69 & 70

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4
  • Other register states: 3

Questions buyers ask

Is TULIP VIOLET registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/967/699/2025/70. Valid to 30 Dec 2032.

The source ↗
What is the possession timeline for TULIP VIOLET?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 30 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around TULIP VIOLET?From the records · HARERA, read 4 Nov 2026

TULIP VIOLET is in Gurugram; the site address declared to HARERA is Sector 69 & 70. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building TULIP VIOLET?From the records · HARERA, read 4 Nov 2026

TULIP VIOLET is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD.

The source ↗Tulip Infratech's projects and court record

The records

What the registers hold for TULIP VIOLET: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/967/699/2025/70: Registered. Valid to 30 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 34 OF 2024 is on the DTCP register, valid to 6 Mar 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 20 Feb 2025, building plans 20 Feb 2025.Declared to HARERA, read 15 Oct 2026
The court record of Tulip Infratech’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
GGM/967/699/2025/70
Registration valid till
30 Dec 2032
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
7.64375 (Acre) (30,933.16 sq m)
FAR
the application prints 175, which is not a ratio
licence
34 of 2024 (07-03-2024), 78 of 2010 (15-10-2010)
Estimated project cost
₹345.28 crore
Cost of land
₹6.30 crore
Layout plan, declared approved (field 5a)
20 Feb 2025
Building plans, declared approved
20 Feb 2025
Construction to start
1 Jul 2025
Completion declared for
31 Dec 2032
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 28 units · 122.21 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 30 units · 122.09 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 3 units · 127.25 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 153 units · 173.05 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 131.32 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE NO. 34 OF 2024 — declared: already been obtained (7 Mar 2024)
  • II. BR-III VIDE MEMO NO. ZP-663-II/PA(DK)/2025/6649 — declared: already been obtained (20 Feb 2025)
  • III. ENVIRONMENT CLEARANCE VIDE NO. SEAC/HR/2024/174 — declared: already been obtained (30 Jan 2025)
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

2 files
S-101 Site Plan7 Jul 2025Approved Site Plan22 Apr 2025

Layout plan

8 files
S-109 Villa 1&2-Floor Layouts, Elevation, Section, Area Details7 Jul 2025S-103D Tower-A Floor Layout7 Jul 2025S-105C Tower-D Floor Layout7 Jul 2025

Zoning plan

1 file
Zoning Plan7 Jul 2025

Demarcation plan

1 file
Demarcation Plan7 Jul 2025

Building plans

5 files
S-103J Tower- A Section7 Jul 2025S-105G Tower-D Section7 Jul 2025S-105F Tower-D Elevation7 Jul 2025

Services

Service plans

3 files
Service Plan Estimate7 Jul 2025Assurance Combined7 Jul 2025Service Plans on the Layout22 Apr 2025

Approvals and clearances

DTCP licence

3 files
BR-III (License 34 of 2024 and 78 of 2010)7 Jul 2025LOI Violet Addl. License7 Jul 2025Licence Copy with Land Schedule7 Jul 2025

Environment clearance

1 file
Environment Clerance7 Jul 2025

Fire safety

1 file
Fire Approval7 Jul 2025

Other NOCs and clearances

2 files
Airport NOC Tulip Violet7 Jul 2025Forest NOC7 Jul 2025

Land records

Land records

2 files
Non Encumbrance Certificate Tulip Violet Ph III7 Jul 2025Revenue Record Entry of Licence and Collaboration22 Apr 2025

Money

Accounts and finance

5 files
CA Certificate on the Application’s Figures7 Jul 2025CA Certificate for Cost Estimates and Cost Incurred7 Jul 2025CA Certificate for Financial Resources7 Jul 2025

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit7 Jul 2025

Other filings

Other filings

2 files
S- 04 Nursery School 17 Jul 2025S- 05 Nursery School 27 Jul 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

34 OF 2024 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR

Licence valid to 6 Mar 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

78 OF 2010 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR

Licence valid to 14 Oct 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Apr 2025 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

34 OF 2024: 19 parcels, 7.6437 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 7.6438 acres.

  • rectangle 76, kila 12 min2 kanal 4 marla
  • rectangle 76, kila 13 min3 kanal 15 marla
  • 76//18/22 kanal 1 marla
  • 76//192 kanal 9 marla
Show the other 15 parcels
  • 76//2219 marla
  • rectangle 76, kila 20 min1 kanal 14 marla
  • rectangle 76, kila 21/1 min1 kanal 2 marla
  • rectangle 76, kila 21/2 min1 kanal 1 marla
  • 77//198 kanal
  • 77//261 kanal 7 marla
  • 77//7/21 kanal 13 marla
  • 90//13/23 kanal 16 marla
  • rectangle 90, kila 13/12 kanal 1 marla
  • 91//26 kanal 1 marla
  • 91//97 kanal 16 marla
  • rectangle 91, kila 1 min2 kanal 16 marla
  • rectangle 91, kila 10 min2 kanal 16 marla
  • rectangle 76, kila 14/16 kanal 14 marla
  • rectangle 76, kila 17/22 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

78 OF 2010: 38 parcels, 25.4375 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 25.44 acres.

  • rectangle 76, kila 21/2 min19 marla
  • rectangle 76, kila 20 min3 kanal 6 marla
  • rectangle 76, kila 21/1 min3 kanal 14 marla
  • 90//5/12 kanal 10 marla
Show the other 34 parcels
  • 90//158 kanal
  • 90//28 kanal
  • 90//38 kanal
  • 90//47 kanal 16 marla
  • 90//5/24 kanal
  • 90//68 kanal
  • 90//7/21 kanal 12 marla
  • 90//7/317 marla
  • 90//8/1/113 marla
  • 90//8/1/25 kanal 16 marla
  • 90//8/2/13 marla
  • 90//8/2/21 kanal 5 marla
  • 90//98 kanal
  • rectangle 91, kila 1 min5 kanal 4 marla
  • rectangle 91, kila 10 min5 kanal 4 marla
  • 77//10/27 kanal 10 marla
  • 77//11/14 kanal
  • 77//11/2/21 kanal 11 marla
  • 77//128 kanal
  • 77//138 kanal
  • 77//147 kanal 8 marla
  • 77//167 kanal 9 marla
  • 77//178 kanal
  • 77//188 kanal
  • 77//208 kanal
  • 77//236 kanal 18 marla
  • 77//246 kanal 18 marla
  • 77//256 kanal 18 marla
  • 78//14/17 kanal 8 marla
  • 78//261 kanal 13 marla
  • 78//46 kanal 7 marla
  • 78//7/17 kanal 12 marla
  • rectangle 78, kila 6 min4 kanal 19 marla
  • rectangle 90, kila 7/14 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 76, kila 12 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Tulip Violet”, by Tulip Infratech Pvt. Ltd., code NCR-2011-52, approved 2011.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
S-101 Site Plan7 Jul 2025Approved Site Plan22 Apr 2025

Layout plan

8 files
S-109 Villa 1&2-Floor Layouts, Elevation, Section, Area Details7 Jul 2025S-103D Tower-A Floor Layout7 Jul 2025S-105C Tower-D Floor Layout7 Jul 2025S-105A Tower-D Floor Layout7 Jul 2025Phasing Plan Signed by DTCP7 Jul 2025S-103A Tower-A Floor Layout7 Jul 2025

Building plans

5 files
S-103J Tower- A Section7 Jul 2025S-105G Tower-D Section7 Jul 2025S-105F Tower-D Elevation7 Jul 2025S-103H Tower-A Elevation7 Jul 2025Approved Building Plans, Full Set22 Apr 2025

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (37 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3447 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tulip Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.