TULIP VIOLET
by Tulip Infratech · Gurugram
Not on our price list yet
Possession 31 Dec 2032 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- TULIP INFRATECH PVT. LTDthe company that filed it, for Tulip Infratech
- 20 Feb 2025Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
- 30 Dec 2032Registration valid toHARERA, read 4 Nov 2026
- 31 Dec 2032Possession, as declareddeclared to HARERA, read 15 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,314–1,370 sq ft61
- 1,500–2,000 sq ft1,863 sq ft153
Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- KitchenMarble/granite counter with stainless steel sink, cpfittings and modular kitchen.
- LiftsCapacity of 10 / 13 persons, KONE or equivalent
- FloorsI) living/dining: tiles /imported marble II) master bedroom/dress room and bedroom : laminated woodenflooring III) kitchen: anti skid tiles / equivalent IV) alltoilets: premium quality tiles. V) SIT OUTS/balcony: antiskid ceramic tiles VI) utility room: vitrified tiles VII)utility toilet & balcony: anti skid ceramic floor tiles.
- WallsI) living/dining, master bedroom, bedrooms: acrylicemulsion paint finish II) master toilet/dress room,toilets: premium quality tiles/mirror III) kitchen: 2’-0”DADO above counters and acrylic emulsion paint. IV)utility rooms/ utility balcony/utility toilet: oil boundpaint finish V) SIT OUTS/balcony: permanenttexture/paint finish.
- BathroomsI) master toilet/dress room: sanitary WARE includeswash basin and EWC CP fittings: hot and cold waterwall and basin mixture of premium brands, handshower, health fauset& angle valve.
- WindowsNergy efficient double glass aluminium /upvcglazings with FLY MESH shutter in all habitableareas & aluminium / UPVC frames with single glass inall toilets & utility rooms.
- Main doorMoulded SKIN door / panel door shutters.
- Electrical fittingsSwitches only (no lights& fixtures)
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 69 & 70
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 4
- Other register states: 3
Questions buyers ask
Is TULIP VIOLET registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/967/699/2025/70. Valid to 30 Dec 2032.
The source ↗What is the possession timeline for TULIP VIOLET?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 30 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around TULIP VIOLET?From the records · HARERA, read 4 Nov 2026
TULIP VIOLET is in Gurugram; the site address declared to HARERA is Sector 69 & 70. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building TULIP VIOLET?From the records · HARERA, read 4 Nov 2026
TULIP VIOLET is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD.
The source ↗Tulip Infratech's projects and court recordThe records
What the registers hold for TULIP VIOLET: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/967/699/2025/70: Registered. Valid to 30 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 34 OF 2024 is on the DTCP register, valid to 6 Mar 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 20 Feb 2025, building plans 20 Feb 2025.Declared to HARERA, read 15 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
- Registration no.
- GGM/967/699/2025/70
- Registration valid till
- 30 Dec 2032
- Declared possession
- 31 Dec 2032
Declared by the promoter to HARERA
- Land area
- 7.64375 (Acre) (30,933.16 sq m)
- FAR
- the application prints 175, which is not a ratio
- licence
- 34 of 2024 (07-03-2024), 78 of 2010 (15-10-2010)
- Estimated project cost
- ₹345.28 crore
- Cost of land
- ₹6.30 crore
- Layout plan, declared approved (field 5a)
- 20 Feb 2025
- Building plans, declared approved
- 20 Feb 2025
- Construction to start
- 1 Jul 2025
- Completion declared for
- 31 Dec 2032
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 28 units · 122.21 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 30 units · 122.09 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 3 units · 127.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 153 units · 173.05 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 131.32 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. LICENSE NO. 34 OF 2024 — declared: already been obtained (7 Mar 2024)
- II. BR-III VIDE MEMO NO. ZP-663-II/PA(DK)/2025/6649 — declared: already been obtained (20 Feb 2025)
- III. ENVIRONMENT CLEARANCE VIDE NO. SEAC/HR/2024/174 — declared: already been obtained (30 Jan 2025)
On file with HARERA · 37 files
On file with HARERA (37)
Plans
Site plan
2 filesLayout plan
8 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
5 filesServices
Service plans
3 filesApprovals and clearances
DTCP licence
3 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
2 filesLand records
Land records
2 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
34 OF 2024 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR
Licence valid to 6 Mar 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
78 OF 2010 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR
Licence valid to 14 Oct 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Apr 2025 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
34 OF 2024: 19 parcels, 7.6437 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 7.6438 acres.
- rectangle 76, kila 12 min2 kanal 4 marla
- rectangle 76, kila 13 min3 kanal 15 marla
- 76//18/22 kanal 1 marla
- 76//192 kanal 9 marla
Show the other 15 parcels
- 76//2219 marla
- rectangle 76, kila 20 min1 kanal 14 marla
- rectangle 76, kila 21/1 min1 kanal 2 marla
- rectangle 76, kila 21/2 min1 kanal 1 marla
- 77//198 kanal
- 77//261 kanal 7 marla
- 77//7/21 kanal 13 marla
- 90//13/23 kanal 16 marla
- rectangle 90, kila 13/12 kanal 1 marla
- 91//26 kanal 1 marla
- 91//97 kanal 16 marla
- rectangle 91, kila 1 min2 kanal 16 marla
- rectangle 91, kila 10 min2 kanal 16 marla
- rectangle 76, kila 14/16 kanal 14 marla
- rectangle 76, kila 17/22 kanal 18 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
78 OF 2010: 38 parcels, 25.4375 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 25.44 acres.
- rectangle 76, kila 21/2 min19 marla
- rectangle 76, kila 20 min3 kanal 6 marla
- rectangle 76, kila 21/1 min3 kanal 14 marla
- 90//5/12 kanal 10 marla
Show the other 34 parcels
- 90//158 kanal
- 90//28 kanal
- 90//38 kanal
- 90//47 kanal 16 marla
- 90//5/24 kanal
- 90//68 kanal
- 90//7/21 kanal 12 marla
- 90//7/317 marla
- 90//8/1/113 marla
- 90//8/1/25 kanal 16 marla
- 90//8/2/13 marla
- 90//8/2/21 kanal 5 marla
- 90//98 kanal
- rectangle 91, kila 1 min5 kanal 4 marla
- rectangle 91, kila 10 min5 kanal 4 marla
- 77//10/27 kanal 10 marla
- 77//11/14 kanal
- 77//11/2/21 kanal 11 marla
- 77//128 kanal
- 77//138 kanal
- 77//147 kanal 8 marla
- 77//167 kanal 9 marla
- 77//178 kanal
- 77//188 kanal
- 77//208 kanal
- 77//236 kanal 18 marla
- 77//246 kanal 18 marla
- 77//256 kanal 18 marla
- 78//14/17 kanal 8 marla
- 78//261 kanal 13 marla
- 78//46 kanal 7 marla
- 78//7/17 kanal 12 marla
- rectangle 78, kila 6 min4 kanal 19 marla
- rectangle 90, kila 7/14 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 76, kila 12 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Tulip Violet”, by Tulip Infratech Pvt. Ltd., code NCR-2011-52, approved 2011.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
8 filesBuilding plans
5 filesAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (37 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3447 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Tulip Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.