Urban Homes

by Pyramid Infratech · Sector 70, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
3 Oct 2017
Registered by
PYRAMID INFRATECH PRIVATE LIMITEDthe company that filed it, for Pyramid Infratech
Timeline
  1. 3 Aug 2015Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 3 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 28 Feb 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside38,975 m² in all, by use
  • Parking21,569 m² · 55%
  • Green belts6,701 m² · 17%
  • Apartment buildings5,134 m² · 13%
  • Roads4,954 m² · 13%
  • Other usesas the form names them: Anganwadi and community building, Rain water harvesting system576 m² · 1%
  • Sewage and waste treatment41 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter with tile
  • FloorsI PS flooring
  • WallsOBD paint
  • BathroomsPVC
  • WindowsGlass panels
  • Main doorSKIN door
  • Water storageOver HEAD tank

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Urban Homes registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 254 OF 2017, registered on 3 Oct 2017. Ended 28 Feb 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Urban Homes?From the records · Map pin and road lines, read 6 Sep 2026

Urban Homes is in Sector 70, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Palra. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Urban Homes?From the records · HARERA, read 4 Nov 2026

Urban Homes is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PRIVATE LIMITED.

The source ↗Pyramid Infratech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Urban Homes: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 254 OF 2017: Registration expired. Ended 28 Feb 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 116 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 29 Feb 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Aug 2015, building plans 3 Aug 2015.Declared to HARERA, read 15 Oct 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 28 Feb 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 116 OF 2014 lapsed

    Named in this project’s application. Valid to 29 Feb 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
254 OF 2017
Registration date
3 Oct 2017
Registration valid till
28 Feb 2020

Declared by the promoter to HARERA

Land area
9.875 (Acre) (39,962.71 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
116 OF 2014
Estimated project cost
₹288.58 crore
Cost of land
₹46.40 crore
Layout plan, declared approved (field 5a)
3 Aug 2015
Building plans, declared approved
3 Aug 2015
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (3 Aug 2015)
  • II. LICENSE — declared: already been obtained (20 Aug 2014)
  • III. TRANFER OF LICENSE — declared: already been obtained (19 Oct 2015)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (19 Feb 2016)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan6 Apr 2020

Layout plan

1 file
Latest Layout Plan7 Apr 2020

Zoning plan

1 file
Zoning Plan6 Apr 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate5 Aug 2024

DTCP licence

2 files
Licence Copy with Land Schedule6 Apr 2020Order for Transfer of License6 Apr 2020

Environment clearance

1 file
Environment Clearance6 Apr 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA6 Apr 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit7 Apr 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

116 OF 2014 · Pyramid Infratech Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 29 Feb 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Apr 2020 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

116 OF 2014: 17 parcels, 9.875 acres in all, in Palda (hadbast 164), tehsil Badshahpur.

The licence register prints the same licensed area, 9.88 acres.

  • 17//12/1/32 kanal 13 marla
  • 17//13/14 kanal 12 marla
  • 17//13/23 kanal 8 marla
  • 17//148 kanal
Show the other 13 parcels
  • 17//158 kanal
  • 17//168 kanal
  • 17//177 kanal 9 marla
  • 17//25/14 kanal
  • 17//7/23 kanal 18 marla
  • 16//20/23 kanal 7 marla
  • 16//217 kanal 12 marla
  • 16//22/14 kanal
  • 26//5/24 kanal
  • 27//1/1/13 kanal 18 marla
  • 27//1/1/21 kanal 17 marla
  • 27//1/2/16 marla
  • 17//25/24 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 17//12/1/3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Urban Homes”, by Pyramid Infratech Pvt Ltd, code NCR-2015-439, approved 2015.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Apr 2020

Layout plan

1 file
Latest Layout Plan7 Apr 2020

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (9 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1354 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.