Skip to content

70 Grandwalk

by Shine Buildcon · Sector 70, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
28 Jul 2017
Registered by
SHINE BUILDCON PRIVATE LIMITEDthe company that filed it, for Shine Buildcon
Timeline
  1. 28 Jul 2017Registered with HARERAHARERA, read 3 Nov 2026
  2. 14 Mar 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Dec 2027Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,708 m² in all, by use
  • Other usesas the form names them: Grass, Area6,410 m² · 55%
  • Apartment buildings2,893 m² · 25%
  • Roads1,945 m² · 17%
  • Pavements459 m² · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningShops : DX system - indoor unit to be DONE by client, apartment : split AC - indoor and outdoor unit to be DONE by client
  • KitchenWalls - ceramic tile up to 2FT.above counter and oil bound distemper in the balance area, counter: polished granite counter top, fitting/fixtures : CP fittings, single bowl stainless steel sink.
  • Lifts7 passenger 1 service
  • FloorsGF central plaza - pavers/ tiles, common toilets - vitrified / ceramic tiles, corridors / passage - vitrified / ceramic tiles, retail shops - BARE shell, common staircase - KOTA stone, living room - vitrified flooring / laminated wooden flooring, balcony - anti-skid ceramic tiles.
  • WallsPlastered walls in SHOP
  • BathroomsSingle lever C.P. fittings, EWC, health faucet, WASH basin, towel RING, towel ROD, SOAP-DISH.
  • WindowsUPVC/aluminium sliding swing glass shutter
  • Main doorSeasoned wooden frame with hardwood (polished) door shutter.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 70 Grandwalk registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 28 OF 2017, registered on 28 Jul 2017. Valid to 30 Dec 2027.

The source ↗
How is the connectivity around 70 Grandwalk?From the records · Map pin and road lines, read 6 Sep 2026

70 Grandwalk is in Sector 70, Gurugram; the site address declared to HARERA is Sector-70, Badshahpur, Gurugram. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 70 Grandwalk?From the records · HARERA, read 3 Nov 2026

70 Grandwalk is a Shine Buildcon project, registered by its company SHINE BUILDCON PRIVATE LIMITED.

The source ↗Shine Buildcon's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for 70 Grandwalk: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 28 OF 2017: Registered. Valid to 30 Dec 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 34 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 14 Apr 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 14 Mar 2018, building plans 14 Mar 2018.Declared to HARERA, read 29 Oct 2026
The court record of Shine Buildcon’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 34 OF 2012 lapsed

    Named in this project’s application. Valid to 14 Apr 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 49 HARERA files, with the dates we read them
Registration no.
28 OF 2017
Registration date
28 Jul 2017
Registration valid till
30 Dec 2027

Declared by the promoter to HARERA

Land area
2.893 (Acre) (11,707.56 sq m)
FAR
1.77 proposed of 1.78 permissible
licence
34 OF 2012 (15-04-2012)
Estimated project cost
₹179.00 crore
Cost of land
₹8.60 crore
Layout plan, declared approved (field 5a)
14 Mar 2018
Building plans, declared approved
14 Mar 2018
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 270 units · 4,301 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type STUDIO/OFFICE · 213 units · 5,631 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FOOD COURT · 25 units · 430 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type MULTIPLEX · 3 units · 1,005 sq m carpet
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (20 Aug 2018)
  • II. APPROVED ZONING PLAN DRAWING — declared: already been obtained (25 Aug 2015)
  • III. APPROVED ZONING PLAN LETTER — declared: already been obtained (25 Aug 2015)
  • IV. BOCW REGISTRATION ISSUED BY THE ASSISTANT DIRECTOR (IS& H) GURUGRAM -II, REGISTRATION OFFICER CUM ASSESSING AUTHORITY , GOVERNMENT OF HARYANA — declared: already been obtained (10 Mar 2015)
  • V. BR-III APPROVAL OF REVISED BUILDING PLAN — declared: already been obtained (14 Mar 2018)
  • VI. CERTIFICATE OF REGISTRATION ISSUED BY THE LABOUR COMMISSIONER HARYANA & REGISTERING OFFICER, LABOUR DEPARTMENT HARYANA — declared: already been obtained (14 Dec 2015)
  • VII. NOC FROM POLLUTION BOARD — declared: already been obtained (6 Feb 2017)
  • VIII. ARAVALI NOTIFICATION — declared: already been obtained (25 Apr 2014)
  • IX. NOC FROM FOREST DEPT. — declared: already been obtained (22 Apr 2014)
  • X. ASSURANCE LETTER FOR ELECTRICITY DEPARTMENT — declared: already been obtained (11 Mar 2014)
  • XI. NOC FROM HUDA FOR CONSTRUCTION — declared: already been obtained (22 Apr 2013)
  • XII. NOC FROM AIRPORTS AUTHORITY — declared: already been obtained (17 Apr 2013)
  • XIII. LICENCE NO. 34 OF 2012 — declared: already been obtained (15 Apr 2012)
  • XIV. APPROVAL OF REVISED BUILDING PLANS — declared: already been obtained (14 Mar 2018)
On file with HARERA · 49 files

On file with HARERA (49)

Plans

Site plan

2 files
Building Plan/ Site Plan/apartment Plan/elevation Sections/permissible FAR/ Covered Area Achieved FAR3 Aug 2019Approved Site Plan3 Aug 2019

Layout plan

2 files
Lay Out Planfloor Plan (Ground to 12th Floors)3 Aug 2019Latest Layout Plan3 Aug 2019

Zoning plan

2 files
Zoning Plan3 Aug 2019Approved Zoning Plan Letter3 Aug 2019

Demarcation plan

1 file
Demarcation Plan3 Aug 2019

Building plans

3 files
BR III3 Feb 2020BR-III Approval of Revised Building Plan3 Aug 2019Approved Building Plans, Full Set3 Aug 2019

Services

Sewerage and drainage

2 files
Strom Water Drainage3 Aug 2019Sewerage and Garbage Disposal Plan3 Aug 2019

Water supply

1 file
Water Supply Plan3 Aug 2019

Electricity

2 files
Assurance Letter for Electricity Department30 Aug 2019Electricity Supply Plan3 Aug 2019

Roads

1 file
Roads and Pavement Plan3 Aug 2019

Service plans

3 files
Service Plan Letter3 Feb 2020Service Plans on the Layout3 Feb 2020Service Estimates3 Feb 2020

Approvals and clearances

DTCP licence

4 files
LC- IV3 Feb 2020LOI3 Feb 2020Renewal of Licence No. 342 Nov 2019Licence Copy with Land Schedule3 Aug 2019

Environment clearance

1 file
Environmental Clearance30 Aug 2019

Fire safety

2 files
Fire Scheme Letter3 Feb 2020Fire Scheme3 Feb 2020

Other NOCs and clearances

6 files
Airport Height Clearance3 Feb 2020Aravali Notification30 Aug 2019NOC from HUDA for Construction30 Aug 2019

Land records

Land records

3 files
Land Title Documents3 Feb 2020Non Encumbrance Certificate3 Feb 2020Revenue Record Entry of Licence and Collaboration3 Aug 2019

Sales papers

Allotment and sale agreements

2 files
Draft Allotment Letter3 Aug 2019Draft Agreement3 Aug 2019

Money

Accounts and finance

8 files
BR for Accounts Authority3 Feb 2020Balance Sheet Fy 15-163 Aug 2019CA Certificate on the Application’s Figures3 Aug 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit3 Aug 2019

Other filings

Other filings

3 files
PROJECT CONTINUATION- RC/REP/HARERA/GGM/28 of 2017/7(3)/61/2025/03 DATED 04.03.202518 Mar 2025Bocw Registration30 Aug 2019Certificate of Registration Issued by the Labour Commissioner30 Aug 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

34 OF 2012 · Shine Buildcon · GURGAON-MANESAR

Licence valid to 14 Apr 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

34 OF 2012: 5 parcels, 2.8937 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 2.89 acres.

  • 89//148 kanal
  • 89//152 kanal 9 marla
  • 89//162 kanal 9 marla
  • 89//177 kanal 16 marla
Show the other 1 parcel
  • 89//252 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 89//14.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Building Plan/ Site Plan/apartment Plan/elevation Sections/permissible FAR/ Covered Area Achieved FAR3 Aug 2019Approved Site Plan3 Aug 2019

Layout plan

2 files
Lay Out Planfloor Plan (Ground to 12th Floors)3 Aug 2019Latest Layout Plan3 Aug 2019

Building plans

3 files
BR III3 Feb 2020BR-III Approval of Revised Building Plan3 Aug 2019Approved Building Plans, Full Set3 Aug 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (49 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/759 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Shine Buildcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.