About this project

Key facts

Location
Sector 103, Gurugram0.9 km from Dwarka Expressway, in a straight line
Carpet area
1,290–1,901 sq ft
In m²about 120–177 m², as declared
Registered by
FLORALESSENCE PROJECTS PRIVATE LIMITEDthe company that filed it, for Floralessence Projects
Timeline
  1. 2 Feb 2026Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2034Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

200homes, 1,290 to 1,901 sq ft of carpet area
  • 1,000–1,500 sq ft1,290–1,421 sq ft31
  • 1,500–2,000 sq ft1,577–1,901 sq ft169

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 40 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.106 acres in all, by use
  • Other uses2.185 acres · 43%
  • Apartment buildings1.043 acres · 20%
  • Roads1 acres · 20%
  • Parks and playgrounds0.423 acres · 8%
  • Green belts0.28 acres · 5%
  • Parking0.101 acres · 2%
  • Pavements0.074 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRF
  • KitchenTiles for flooring, tiles upto 2' abovecounter & acrylic emulsion paint onremaining area. granite / marble /engineered stone for counter
  • Kitchen appliancesModular kitchen with hob, chimney
  • FloorsMarble for living area , laminatedwooden flooring for bedroom & tiles forkitchen & balcony area.
  • WallsAcrylic emulsion paint
  • BathroomsWASH basin, floor-mounted / wall-hungwcs
  • WindowsUPVC / aluminium frames with glass
  • Main doorPolished frame with painted / laminated /veneered flush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 103, GurugramSector 103, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.9 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is AQUARIA AT AIPL LAKE CITY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GM/1063/795/2026/35. Valid to 31 Mar 2034.

The source ↗
What is the possession timeline for AQUARIA AT AIPL LAKE CITY?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2034. Its registration runs to 31 Mar 2034; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AQUARIA AT AIPL LAKE CITY?From the records · Map pin and road lines, read 6 Sep 2026

AQUARIA AT AIPL LAKE CITY is in Sector 103, Gurugram; the site address declared to HARERA is Village Daultabad Sector- 103. In a straight line it is about 0.9 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AQUARIA AT AIPL LAKE CITY?From the records · HARERA, read 4 Nov 2026

AQUARIA AT AIPL LAKE CITY is a Floralessence Projects project, registered by its company FLORALESSENCE PROJECTS PRIVATE LIMITED.

The source ↗Floralessence Projects's projects and court record

The records

What the registers hold for AQUARIA AT AIPL LAKE CITY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GM/1063/795/2026/35: Registered. Valid to 31 Mar 2034.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 61 OF 2025 is on the DTCP register, valid to 30 Apr 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 2 Feb 2026, building plans 2 Feb 2026.Declared to HARERA, read 29 Oct 2026
The court record of Floralessence Projects’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 101 HARERA files, with the dates we read them
Registration no.
GM/1063/795/2026/35
Registration valid till
31 Mar 2034
Declared possession
31 Mar 2034

Declared by the promoter to HARERA

Land area
5.10625 (Acre) (20,664.26 sq m)
FAR
the application prints 190, which is not a ratio
licence
61 of 2025 Dated 01.05.2025
Estimated project cost
₹807.81 crore
Cost of land
₹302.47 crore
Layout plan, declared approved (field 5a)
2 Feb 2026
Building plans, declared approved
2 Feb 2026
Construction to start
1 Oct 2026
Completion declared for
31 Mar 2034
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 20 units · 176.61 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 63 units · 170.95 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 149.53 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 83 units · 146.54 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 14 units · 131.98 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 125.11 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 14 units · 119.8 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 33 units · 17.73 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (20 May 2025)
  • II. LICENCE — declared: already been obtained (1 May 2025)
  • III. BUILDING PLAN — declared: already been obtained (2 Feb 2026)
  • IV. FOREST NOC — declared: already been obtained (10 Mar 2025)
  • V. TREE CUTTING PERMISSION — declared: already been obtained (26 Jun 2025)
  • VI. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (9 Jun 2025)
  • VII. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (5 Jun 2025)
  • VIII. ASSURANCE FOR STORM WATER DRAINAGE — declared: already been obtained (9 Jun 2025)
  • IX. CONSTRUCTION WATER NOC — declared: already been obtained (20 Apr 2026)
  • X. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (28 Apr 2025)
  • XI. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive
  • XII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
  • XIII. SERVICE PLAN APPROVAL — declared: applied for but yet to receive
On file with HARERA · 101 files

On file with HARERA (101)

Plans

Site plan

5 files
Approved Site Plan20 May 2026Approved Site Plan20 May 2026Site Plan20 May 2026

Layout plan

1 file
Latest Layout Plan26 Mar 2026

Zoning plan

1 file
Zoning Plan Cum Demarcation20 May 2026

Demarcation plan

1 file
Superimposed Demarcation Plan20 May 2026

Building plans

15 files
Ground Floor,typical (1ST to 3RD)4TH Floor,terrace,mumty(oth Plan & Area Calculation EWS)20 May 2026Section -Aa Tower-0120 May 2026Elevation -A Towr-0120 May 2026

Floor plans

9 files
Basement -03 Area Calculation20 May 2026Basement -01 Area Calculation20 May 2026Basement - 0320 May 2026

Services

Sewerage and drainage

1 file
Assurance- Water Supply, Sewerage and Storm Water20 May 2026

Electricity

1 file
DHBVN Assurance Certificate20 May 2026

Service plans

1 file
SPE Apply Copy20 May 2026

Approvals and clearances

DTCP licence

4 files
LOI20 May 2026LC-IV20 May 2026Licence Copy with Land Schedule20 May 2026Licence Copy with Land Schedule20 May 2026

Environment clearance

1 file
EC Apply Copy20 May 2026

Fire safety

1 file
Fire Scheme Apply Copy20 May 2026

Other NOCs and clearances

4 files
Tree Cutting NOC1 Jul 2026AAI NOC20 May 2026GMDA Construction Water NOC20 May 2026Forest NOC20 May 2026

Land records

Land records

7 files
Non Encumbrance Certificate20 May 2026Mutation Copy20 May 2026Sizra Aks20 May 2026

Sales papers

Allotment and sale agreements

6 files
Draft Allotment Letter2 Jun 2026Draft BBA2 Jun 2026Draft Allotment Letter2 Jun 2026

Brochure and specifications

1 file
Draft Brochure20 May 2026

Money

Accounts and finance

17 files
BG for Fire Scheme2 Jun 2026BG for Fire Scheme2 Jun 2026Cash Flow Statement2 Jun 2026

Timeline and progress

Construction schedule

1 file
PERT Chart2 Jun 2026

The promoter’s papers

Declarations and affidavits

19 files
Affidavit Outiling Compliance of 4(2)L(D)1 Jul 2026Darft Application Form2 Jun 2026Affidavit Regarding Amount Collect in 70% Account2 Jun 2026

Company papers

1 file
MOA & AOA20 May 2026

Other filings

Other filings

4 files
Trade Mark Agreement2 Jun 2026Trade Mark Agreement2 Jun 2026Coi Fppl20 May 2026Basemengt-0120 May 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

61 OF 2025 · Floralessence Projects Private Limited · GURGAON-MANESAR

Licence valid to 30 Apr 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Mar 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

61 OF 2025

DTCP’s page showed no land schedule for licence 61 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

5 files
Approved Site Plan20 May 2026Approved Site Plan20 May 2026Site Plan20 May 2026Site Plan for Services20 May 2026Site Plan (Green Area Calculation)20 May 2026

Layout plan

1 file
Latest Layout Plan26 Mar 2026

Building plans

15 files
Ground Floor,typical (1ST to 3RD)4TH Floor,terrace,mumty(oth Plan & Area Calculation EWS)20 May 2026Section -Aa Tower-0120 May 2026Elevation -A Towr-0120 May 2026Elevation-D Tower-0120 May 2026Elevation - C Tower -0120 May 2026Elevation & Section EWS20 May 2026

Floor plans

9 files
Basement -03 Area Calculation20 May 2026Basement -01 Area Calculation20 May 2026Basement - 0320 May 2026Basement-0220 May 2026Ground Coverage Tower-01&02;20 May 2026Groundstilt Floor Plan & Area Calculation Tower -01&02;20 May 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (101 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4051 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Floralessence Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.