Skip to content

Aster Court Premier

by B.E. Office Automation Products · Sector 85, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 85, Gurugram1.9 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
1,240–1,513 sq ft
In m²about 115–141 m², as declared
Registered
13 Oct 2018
Registered by
ORRIS INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for B.E. Office Automation Products
Timeline
  1. 10 Apr 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 13 Oct 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

262homes, 1,240 to 1,513 sq ft of carpet area
  • 1,000–1,500 sq ft1,240 sq ft126
  • 1,500–2,000 sq ft1,513 sq ft136

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.906 acres in all, by use
  • Parks and playgrounds1.61 acres · 27%
  • Roads1.579 acres · 27%
  • Other uses1.325 acres · 22%
  • Apartment buildings1.016 acres · 17%
  • Club house0.201 acres · 3%
  • Pavements0.175 acres · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningOnly provision for split/window a.C.
  • KitchenCeramic tile in floor, granite on counter, SS sink
  • Lifts10-15 passenger 1-1.5M / SEC speed
  • FloorsVitrified tile in drawing HALL ceramic tile in toilet, balcony & kitchen
  • WallsOBD in ceiling, acrylic emulsion in wall
  • BathroomsC. P. fittings & chinaware
  • WindowsUPVC door windows
  • Main doorSolid wooden flush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 85, GurugramSector 85, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.9 km
  • Delhi–Gurugram–SNB RRTS2.5 km
  • Sohna Elevated Corridor (NH-248A)8.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Aster Court Premier registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/287/2018/19, registered on 13 Oct 2018. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Aster Court Premier?From the records · Map pin and road lines, read 6 Sep 2026

Aster Court Premier is in Sector 85, Gurugram; the site address declared to HARERA is Sector - 85, Village- Badha , Tehsil-Manesar, Gurugram. In a straight line it is about 1.9 km from Dwarka Expressway, 2.5 km from Delhi–Gurugram–SNB RRTS and 8.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Aster Court Premier?From the records · HARERA, read 4 Nov 2026

Aster Court Premier is a B.E. Office Automation Products project, registered by its company ORRIS INFRASTRUCTURE PRIVATE LIMITED.

The source ↗B.E. Office Automation Products's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Aster Court Premier: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/287/2018/19: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 99 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 16 Nov 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Apr 2012, building plans 10 Apr 2012.Declared to HARERA, read 29 Oct 2026
The court record of B.E. Office Automation Products’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 99 OF 2011 lapsed

    Named in this project’s application. Valid to 16 Nov 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 41 HARERA files, with the dates we read them
Registration no.
GGM/287/2018/19
Registration date
13 Oct 2018
Registration valid till
31 Dec 2025

Declared by the promoter to HARERA

Land area
5.90625 (Acre) (23,901.75 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
39 OF 2009 (24.07.2009), 99 OF 2011 (17.11.2011)
Estimated project cost
₹305.16 crore
Cost of land
₹4.79 crore
Layout plan, declared approved (field 5a)
10 Apr 2012
Building plans, declared approved
10 Apr 2012
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3K (3BHK+S) · 22 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3L(3BHK+S) · 20 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3M(3BHK+S) · 20 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3N(3BHK+S) · 22 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3O(3BHK+S) · 20 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3P(3BHK+S) · 22 units · 115.2 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4A(4BHK+S) · 22 units · 140.6 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4B(4BHK+S) · 24 units · 140.6 sq m carpet · one flat
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. AIRPORT HEIGHT CLERANCE — declared: already been obtained (20 Sept 2010)
  • II. WET CONSTRUCTION — declared: already been obtained (24 Sept 2012)
  • III. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (22 Jul 2012)
  • IV. TREE CUTTING — declared: already been obtained (27 Oct 2010)
  • V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (15 Oct 2013)
  • VI. CONSENT TO ESTABLISH — declared: already been obtained (15 Apr 2011)
  • VII. FIRE SCHEME APPROVAL — declared: already been obtained (29 Jul 2013)
  • VIII. APPROVAL OF SERVICE PLAN ESTIMATE — declared: already been obtained (21 Mar 2014)
  • IX. ROAD ACCESS WITH IN PWD — declared: already been obtained (27 Jan 2011)
  • X. ARAVALLI — declared: already been obtained (30 Jan 2013)
On file with HARERA · 41 files

On file with HARERA (41)

Plans

Site plan

2 files
Site Plan11 Feb 2020Approved Site Plan19 Dec 2019

Layout plan

1 file
Latest Layout Plan26 Dec 2019

Zoning plan

1 file
Zoning Plan11 Feb 2020

Demarcation plan

1 file
Demarcation Plan11 Feb 2020

Building plans

9 files
BR III11 Feb 2020Elevation & Section - 411 Feb 2020Elevation & Section11 Feb 2020

Floor plans

6 files
Floor Plan - 311 Feb 2020Floor Plan -211 Feb 2020Floor Plan -311 Feb 2020

Services

Sewerage and drainage

1 file
Service, Sewer,storm,water Supply Plan11 Feb 2020

Roads

1 file
Road & Pavement Plan11 Feb 2020

Service plans

4 files
Service Plan Approval Letter11 Feb 2020Service Plan11 Feb 2020Services Estimate Approved11 Feb 2020Service Plans on the Layout26 Dec 2019

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule11 Feb 2020LC IV11 Feb 2020LOI11 Feb 2020

Environment clearance

1 file
Environment Clearance Approval11 Feb 2020

Fire safety

1 file
Fire Scheme Approval11 Feb 2020

Other NOCs and clearances

2 files
Airport Height Clearance11 Feb 2020Forest NOC11 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration11 Feb 2020

Sales papers

Allotment and sale agreements

1 file
Agreement to Sale11 Feb 2020

Money

Accounts and finance

2 files
Non-Default Certificate from a CA11 Feb 2020CA Certificate on the Application’s Figures11 Feb 2020

The promoter’s papers

Declarations and affidavits

2 files
Application Form11 Feb 2020The Promoter’s Declaration on Affidavit11 Feb 2020

Other filings

Other filings

2 files
Project Continuation- RC/REP/HARERA/GGM/19 of 2018 /7(3)/2022/2 dated 09.08.202229 Sept 2022Chg - 111 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

39 OF 2009 · Orris Infrastructure · GURGAON-MANESAR

Licence valid to 23 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

99 OF 2011 · Orris Infrastructure · GURGAON-MANESAR

Licence valid to 16 Nov 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

39 OF 2009

DTCP’s page showed no land schedule for licence 39 OF 2009 when Bhumiq read it on 18 Oct 2026. verify at source

99 OF 2011: 9 parcels, 4.05 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 4.05 acres.

  • 26//157 kanal 8 marla
  • 26//248 kanal
  • 26//5/24 kanal 8 marla
  • 27//13/2/11 kanal 11 marla
Show the other 5 parcels
  • 27//13/319 marla
  • 27//13/41 kanal 16 marla
  • 27//19/25 kanal 19 marla
  • 27//19/22 marla
  • 27//21/1/12 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 26//15.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 85 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Aster Court Premier”, by ORRIS Infrastructure Pvt Ltd, code NCR-2011-55, approved 2011.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan11 Feb 2020Approved Site Plan19 Dec 2019

Layout plan

1 file
Latest Layout Plan26 Dec 2019

Building plans

9 files
BR III11 Feb 2020Elevation & Section - 411 Feb 2020Elevation & Section11 Feb 2020FAR Details11 Feb 2020Elevation & Section - 211 Feb 2020Elevation & Section - 311 Feb 2020

Floor plans

6 files
Floor Plan - 311 Feb 2020Floor Plan -211 Feb 2020Floor Plan -311 Feb 2020Floor Plan11 Feb 2020Parking Plan -111 Feb 2020Parking Plan11 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (41 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1018 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on B.E. Office Automation Products

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.