Pyramid Heights

by Pyramid Infratech · Sector 85, Gurugram

Not on our price list yet

Possession 9 Dec 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 85, Gurugram1.9 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
526–599 sq ft
In m²about 49–56 m², as declared
Registered
13 May 2019
Registered by
PYRAMID INFRATECH PVT. LTD.the company that filed it, for Pyramid Infratech
Timeline
  1. 29 Mar 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 13 May 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 9 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 9 Jun 2025Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

738homes, 526 to 599 sq ft of carpet area
  • Under 1,000 sq ft526–599 sq ft738

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 67 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,335 m² in all, by use
  • Parking11,151 m² · 55%
  • Parks and playgrounds4,346 m² · 21%
  • Apartment buildings2,413 m² · 12%
  • Roads1,231 m² · 6%
  • Other usesas the form names them: Area, Rain763 m² · 4%
  • Club house207 m² · 1%
  • Electricity sub-station145 m² · under 1%
  • Sewage and waste treatment78 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter with tile
  • FloorsI PS flooring
  • WallsOBD paint
  • BathroomsPVC
  • WindowsGlass panels
  • Main doorSKIN door
  • Water storageOver HEAD tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 85, GurugramSector 85, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.9 km
  • Delhi–Gurugram–SNB RRTS2.5 km
  • Sohna Elevated Corridor (NH-248A)8.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Pyramid Heights registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/331/63/2019/25, registered on 13 May 2019. Ended 9 Jun 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Pyramid Heights?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 9 Dec 2023. Its registration runs to 9 Jun 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Pyramid Heights?From the records · Map pin and road lines, read 6 Sep 2026

Pyramid Heights is in Sector 85, Gurugram; the site address declared to HARERA is Sector-85, Gurugram. In a straight line it is about 1.9 km from Dwarka Expressway, 2.5 km from Delhi–Gurugram–SNB RRTS and 8.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Pyramid Heights?From the records · HARERA, read 4 Nov 2026

Pyramid Heights is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT. LTD..

The source ↗Pyramid Infratech's projects and court record

The records

What the registers hold for Pyramid Heights: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/331/63/2019/25: Registration expired. Ended 9 Jun 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 85 OF 2018 is on the DTCP register, valid to 16 May 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 29 Mar 2019, building plans 29 Mar 2019.Declared to HARERA, read 29 Oct 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 9 Jun 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
Registration no.
GGM/331/63/2019/25
Registration date
13 May 2019
Registration valid till
9 Jun 2025
Declared possession
9 Dec 2023

Declared by the promoter to HARERA

Land area
5.025 (Acre) (20,335.45 sq m)
FAR
the application prints 225, which is not a ratio
licence
85 OF 2018
Estimated project cost
₹157.63 crore
Cost of land
₹45.20 crore
Layout plan, declared approved (field 5a)
29 Mar 2019
Building plans, declared approved
29 Mar 2019
Construction to start
15 May 2019
Completion declared for
9 Dec 2023
Declared inventory · 16 types

Declared inventory — 16 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 369 units · 54.919 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 183 units · 53.933 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 90 units · 53.723 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 90 units · 55.605 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 48.843 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 14 units · 17.721 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 6 units · 16.849 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 14 units · 17.721 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. LOI — declared: already been obtained (21 Sept 2018)
  • II. LICENSE — declared: already been obtained (10 Dec 2018)
  • III. LC-IV — declared: already been obtained (19 Nov 2018)
  • IV. COLLABORATION AGREEMENT — declared: already been obtained (21 Mar 2018)
  • V. LAND TITLE SEARCH REPORT — declared: already been obtained (9 Jan 2019)
  • VI. NON-ENCUMBRANCE CERTIFICATE — declared: already been obtained (7 Jan 2019)
  • VII. BUILDING PLAN APPROVAL LETTER (BR-III) — declared: already been obtained (29 Mar 2019)
  • VIII. ELECTRICAL LOAD AVAILABILITY CONNECTION — declared: already been obtained (11 Apr 2019)
  • IX. FOREST NOC — declared: already been obtained (19 Dec 2018)
  • X. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (3 Jan 2019)
  • XI. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (29 Jan 2019)
  • XII. ENVIRONMENT CLEARANCE APPROVAL — declared: applied for but yet to receive
  • XIII. SERVICE PLANS AND ESTIMATES APPROVAL/ SANCTION LETTER — declared: applied for but yet to receive (3 Apr 2019)
  • XIV. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
  • XV. MINING PERMISSION — declared: yet to file for approval
On file with HARERA · 22 files

On file with HARERA (22)

Plans

Site plan

1 file
Approved Site Plan15 Apr 2019

Layout plan

1 file
Latest Layout Plan15 Apr 2019

Zoning plan

1 file
Zoning Plan15 Apr 2019

Demarcation plan

1 file
Demarcation Plan15 Apr 2019

Building plans

1 file
Approved Building Plans, Full Set15 Apr 2019

Services

Electricity

1 file
Electrical Load Availability Connection15 Apr 2019

Service plans

1 file
Service Plans on the Layout15 Apr 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate20 Sept 2024

DTCP licence

2 files
Licence Copy with Land Schedule15 Apr 2019LC IV15 Apr 2019

Other NOCs and clearances

6 files
Airport Height Clearance15 Apr 2019Forest NOC15 Apr 2019HUDA Construction Water NOC15 Apr 2019

Land records

Land records

3 files
Revenue Record Entry of Licence and Collaboration15 Apr 2019Land Title Search Report15 Apr 2019Non-Encumbrance Certificate15 Apr 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA15 Apr 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Apr 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 09 of 2025 dated 04.03.202516 May 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

85 OF 2018 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR

Licence valid to 16 May 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Apr 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

85 OF 2018: 11 parcels, 5.025 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 5.025 acres.

  • 25//1/1/23 marla
  • 25//1/2/21 kanal 3 marla
  • 25//1/3/21 kanal 18 marla
  • 25//12/14 kanal
Show the other 7 parcels
  • 25//12/24 kanal
  • 25//136 kanal 7 marla
  • 25//18/27 kanal 8 marla
  • 25//198 kanal
  • 25//2/23 kanal 11 marla
  • 25//9/3/12 kanal 18 marla
  • 25//9/3/216 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 25//1/1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 85 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan15 Apr 2019

Layout plan

1 file
Latest Layout Plan15 Apr 2019

Building plans

1 file
Approved Building Plans, Full Set15 Apr 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/572 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.