CITY CENTRE 92
by Shishta Buildwell · Sector 92, Gurugram
Not on our price list yet
Possession 30 Jun 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
- Registered by
- SHISHTA BUILDWELL LLPthe company that filed it, for Shishta Buildwell
- 24 Feb 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2032Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft274–905 sq ft78
- 2,000–2,500 sq ft2,276 sq ft2
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 102 rows of a single unit and 136 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings7,424 m² · 53%
- Pavements4,400 m² · 31%
- Green belts2,214 m² · 16%
- Other uses0 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Lifts6 no. of lifts
- FloorsCement concrete flooring
- WallsPlaster & whitewash
- BathroomsEquivalent to reputed brands
- WindowsExternal
- Main doorWooden/aluminium/glass/shutter
- Electrical fittingsReputed brands
- Water storagePVC tanks/concrete
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
- Delhi–Gurugram–SNB RRTS5.2 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Signature Infrbuild | Same sector | — | — | 31 Dec 2023 | |
No photo of the project on file yet | GLS Infraprojects | Same sector | — | — | — |
No photo of the project on file yet | Ramprastha Sare Realty | Same sector | — | — | — |
Parkwood Westend Phase-INo photo on file yet | Parkwood Infrastructure | Same sector | — | — | — |
No photo of the project on file yet | Nani Resorts and Floriculture | Same sector | — | — | 27 Feb 2024 |
No photo of the project on file yet | Ramprastha Sare Realty | Same sector | — | — | — |
No photo of the project on file yet | Spaze Towers | Same sector | — | — | — |
No photo of the project on file yet | Sare Gurugram | Same sector | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is CITY CENTRE 92 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/953/685/2025/56. Valid to 31 Dec 2032.
The source ↗What is the possession timeline for CITY CENTRE 92?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around CITY CENTRE 92?From the records · Map pin and road lines, read 6 Sep 2026
CITY CENTRE 92 is in Sector 92, Gurugram; the site address declared to HARERA is Village-Mekwa , Sector-92,Gurugram, Haryana. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building CITY CENTRE 92?From the records · HARERA, read 4 Nov 2026
CITY CENTRE 92 is a Shishta Buildwell project, registered by its company SHISHTA BUILDWELL LLP.
The source ↗Shishta Buildwell's projects and court recordThe records
What the registers hold for CITY CENTRE 92: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/953/685/2025/56: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 268 OF 2023 is on the DTCP register, valid to 26 Dec 2028.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 24 Feb 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
- Registration no.
- GGM/953/685/2025/56
- Registration valid till
- 31 Dec 2032
- Declared possession
- 30 Jun 2032
Declared by the promoter to HARERA
- Land area
- 3.46875 (Acre) (14,037.53 sq m)
- FAR
- the application prints 172.54, which is not a ratio
- licence
- License No. 268 of2023 dated 27.12.2023.
- Estimated project cost
- ₹220.12 crore
- Cost of land
- ₹25.74 crore
- Building plans, declared approved
- 24 Feb 2025
- Construction to start
- 1 Apr 2025
- Completion declared for
- 30 Jun 2032
Declared inventory · 189 types
Declared inventory — 189 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 1 unit · 4.73 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 3 units · 6.22 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 14 units · 7.71 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.4 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.86 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.96 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 11.05 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 11.33 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 14
Statutory approvals, as declared
- I. ELECTRIFICATION POWER ASSURANCE APPROVAL — declared: already been obtained (26 Feb 2024)
- II. AIRPORT HEIGHT CLEARENCE APPROVAL — declared: already been obtained (5 Oct 2024)
- III. ARAVALI APPROVAL — declared: already been obtained (19 Feb 2024)
- IV. WATER SUPPLY APPROVAL — declared: already been obtained (23 Jan 2024)
- V. BUILDING PLAN APPROVAL — declared: already been obtained (24 Feb 2025)
- VI. LOI APPROVAL — declared: already been obtained (24 Aug 2023)
- VII. LICENSE APPROVAL — declared: already been obtained (27 Dec 2023)
- VIII. FOREST NOC — declared: already been obtained (18 Sept 2023)
- IX. STORM WATER CONNECTION — declared: already been obtained (16 Feb 2024)
- X. SEWERAGE CONNECTION ASSUARNCE — declared: already been obtained (16 Feb 2024)
- XI. ZOOING APPROVAL — declared: already been obtained (28 Dec 2023)
- XII. ENVIRONMENTAL APPROAVL — declared: applied for but yet to receive (12 Jun 2024)
- XIII. SERVICES ESTIMATES APPROVAL — declared: applied for but yet to receive
- XIV. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
On file with HARERA · 51 files
On file with HARERA (51)
Plans
Site plan
4 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
5 filesFloor plans
7 filesServices
Sewerage and drainage
1 fileWater supply
1 fileLandscape and green areas
1 fileService plans
1 fileApprovals and clearances
DTCP licence
3 filesEnvironment clearance
1 fileOther NOCs and clearances
4 filesLand records
Land records
5 filesSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
4 filesHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
268 OF 2023 · DIYA REALTECH PRIVATE LIMITED · GURGAON-MANESAR
Licence valid to 26 Dec 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Feb 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
268 OF 2023: 9 parcels, 3.4688 acres in all, in Meoka (hadbast 121), tehsil Harsaru.
The licence register prints the same licensed area, 3.4688 acres.
- 22//21/2/21 kanal
- 22//22/13 kanal 4 marla
- 25//18 kanal
- 25//10/13 kanal 13 marla
Show the other 5 parcels
- 25//2/17 kanal 12 marla
- 25//3/1/11 kanal 16 marla
- 25//9/2/112 marla
- 24//51 kanal
- 24//6/118 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Meoka (hadbast 121), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 22//21/2/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
1 fileBuilding plans
5 filesFloor plans
7 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (51 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3148 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Shishta Buildwell
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.