CITY CENTRE 92

by Shishta Buildwell · Sector 92, Gurugram

Not on our price list yet

Possession 30 Jun 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
Carpet area
274–2,276 sq ft
In m²about 25–211 m², as declared
Registered by
SHISHTA BUILDWELL LLPthe company that filed it, for Shishta Buildwell
Timeline
  1. 24 Feb 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2032Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

80homes, 274 to 2,276 sq ft of carpet area
  • Under 1,000 sq ft274–905 sq ft78
  • 2,000–2,500 sq ft2,276 sq ft2

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 102 rows of a single unit and 136 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside14,037 m² in all, by use
  • Apartment buildings7,424 m² · 53%
  • Pavements4,400 m² · 31%
  • Green belts2,214 m² · 16%
  • Other uses0 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts6 no. of lifts
  • FloorsCement concrete flooring
  • WallsPlaster & whitewash
  • BathroomsEquivalent to reputed brands
  • WindowsExternal
  • Main doorWooden/aluminium/glass/shutter
  • Electrical fittingsReputed brands
  • Water storagePVC tanks/concrete

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 92, GurugramSector 92, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Delhi–Gurugram–SNB RRTS5.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is CITY CENTRE 92 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/953/685/2025/56. Valid to 31 Dec 2032.

The source ↗
What is the possession timeline for CITY CENTRE 92?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around CITY CENTRE 92?From the records · Map pin and road lines, read 6 Sep 2026

CITY CENTRE 92 is in Sector 92, Gurugram; the site address declared to HARERA is Village-Mekwa , Sector-92,Gurugram, Haryana. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building CITY CENTRE 92?From the records · HARERA, read 4 Nov 2026

CITY CENTRE 92 is a Shishta Buildwell project, registered by its company SHISHTA BUILDWELL LLP.

The source ↗Shishta Buildwell's projects and court record

The records

What the registers hold for CITY CENTRE 92: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/953/685/2025/56: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 268 OF 2023 is on the DTCP register, valid to 26 Dec 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 24 Feb 2025.Declared to HARERA, read 29 Oct 2026
The court record of Shishta Buildwell’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
Registration no.
GGM/953/685/2025/56
Registration valid till
31 Dec 2032
Declared possession
30 Jun 2032

Declared by the promoter to HARERA

Land area
3.46875 (Acre) (14,037.53 sq m)
FAR
the application prints 172.54, which is not a ratio
licence
License No. 268 of2023 dated 27.12.2023.
Estimated project cost
₹220.12 crore
Cost of land
₹25.74 crore
Building plans, declared approved
24 Feb 2025
Construction to start
1 Apr 2025
Completion declared for
30 Jun 2032
Declared inventory · 189 types

Declared inventory — 189 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 4.73 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 3 units · 6.22 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 14 units · 7.71 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 10.4 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 10.86 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 10.96 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 11.05 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 11.33 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. ELECTRIFICATION POWER ASSURANCE APPROVAL — declared: already been obtained (26 Feb 2024)
  • II. AIRPORT HEIGHT CLEARENCE APPROVAL — declared: already been obtained (5 Oct 2024)
  • III. ARAVALI APPROVAL — declared: already been obtained (19 Feb 2024)
  • IV. WATER SUPPLY APPROVAL — declared: already been obtained (23 Jan 2024)
  • V. BUILDING PLAN APPROVAL — declared: already been obtained (24 Feb 2025)
  • VI. LOI APPROVAL — declared: already been obtained (24 Aug 2023)
  • VII. LICENSE APPROVAL — declared: already been obtained (27 Dec 2023)
  • VIII. FOREST NOC — declared: already been obtained (18 Sept 2023)
  • IX. STORM WATER CONNECTION — declared: already been obtained (16 Feb 2024)
  • X. SEWERAGE CONNECTION ASSUARNCE — declared: already been obtained (16 Feb 2024)
  • XI. ZOOING APPROVAL — declared: already been obtained (28 Dec 2023)
  • XII. ENVIRONMENTAL APPROAVL — declared: applied for but yet to receive (12 Jun 2024)
  • XIII. SERVICES ESTIMATES APPROVAL — declared: applied for but yet to receive
  • XIV. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
On file with HARERA · 51 files

On file with HARERA (51)

Plans

Site plan

4 files
Superimposed Plan27 Feb 2025Site Plan27 Feb 2025Approved Site Plan27 Feb 2025Site Plan and Services27 Feb 2025

Layout plan

1 file
Latest Layout Plan27 Feb 2025

Zoning plan

1 file
Zoning Plan27 Feb 2025

Demarcation plan

1 file
Demarcation Plan27 Feb 2025

Building plans

5 files
Terrace Floor Plan27 Feb 2025Elevation Plan27 Feb 2025Building Plan Approval27 Feb 2025

Floor plans

7 files
2nd Basement Plan27 Feb 2025First Floor Plan27 Feb 2025Second Floor Plan27 Feb 2025

Services

Sewerage and drainage

1 file
Storm Water Drainage27 Feb 2025

Water supply

1 file
Water Supply Approval27 Feb 2025

Landscape and green areas

1 file
Landscape Plan27 Feb 2025

Service plans

1 file
Service Plans on the Layout27 Feb 2025

Approvals and clearances

DTCP licence

3 files
LOI27 Feb 2025LC-IV27 Feb 2025Licence Copy with Land Schedule27 Feb 2025

Environment clearance

1 file
EC Applied Copy27 Feb 2025

Other NOCs and clearances

4 files
STP Treated Water NOC27 Feb 2025Airport Height Clearance Approval27 Feb 2025Forest NOC27 Feb 2025Aravali NOC27 Feb 2025

Land records

Land records

5 files
Revenue Record Entry of Licence and Collaboration28 Feb 2025Sijra27 Feb 2025Sale Deed27 Feb 2025

Sales papers

Allotment and sale agreements

1 file
Inventory Certificate28 Feb 2025

Money

Accounts and finance

6 files
Quarterly Expenditure Statement28 Feb 2025Cost Incurred Certificate28 Feb 2025Net Worth Certificate28 Feb 2025

The promoter’s papers

Declarations and affidavits

4 files
The Promoter’s Declaration on Affidavit28 Feb 2025Affidavit NOC Not Applicable28 Feb 2025Affidavit 4(2) (I)(d)28 Feb 2025Bank Undertaking27 Feb 2025

HARERA’s orders

HARERA’s orders

1 file
Collaboration Agreement with Addendum Agreement27 Feb 2025

Other filings

Other filings

3 files
Fund Flow Statement28 Feb 2025Mutataion27 Feb 2025All Plans27 Feb 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

268 OF 2023 · DIYA REALTECH PRIVATE LIMITED · GURGAON-MANESAR

Licence valid to 26 Dec 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Feb 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

268 OF 2023: 9 parcels, 3.4688 acres in all, in Meoka (hadbast 121), tehsil Harsaru.

The licence register prints the same licensed area, 3.4688 acres.

  • 22//21/2/21 kanal
  • 22//22/13 kanal 4 marla
  • 25//18 kanal
  • 25//10/13 kanal 13 marla
Show the other 5 parcels
  • 25//2/17 kanal 12 marla
  • 25//3/1/11 kanal 16 marla
  • 25//9/2/112 marla
  • 24//51 kanal
  • 24//6/118 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Meoka (hadbast 121), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 22//21/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Superimposed Plan27 Feb 2025Site Plan27 Feb 2025Approved Site Plan27 Feb 2025Site Plan and Services27 Feb 2025

Layout plan

1 file
Latest Layout Plan27 Feb 2025

Building plans

5 files
Terrace Floor Plan27 Feb 2025Elevation Plan27 Feb 2025Building Plan Approval27 Feb 2025Approved Building Plans, Full Set27 Feb 2025Section Plan27 Feb 2025

Floor plans

7 files
2nd Basement Plan27 Feb 2025First Floor Plan27 Feb 2025Second Floor Plan27 Feb 2025Third & Fourth Floor Plan27 Feb 2025Lower Ground Floor Plan27 Feb 20251 St Basement Plan27 Feb 2025Upper Ground Floor27 Feb 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (51 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3148 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Shishta Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.