Commercial Colony

by Ameya Commercial Projects · Sector 92, Gurugram

Not on our price list yet

Possession 27 Aug 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
295 sq ft
In m²about 27–27 m², as declared
Registered
28 Aug 2017
Registered by
AMEYA COMMERCIAL PROJECTS PVT LTDthe company that filed it, for Ameya Commercial Projects
Timeline
  1. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 27 Aug 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 27 Feb 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

474homes, 295 to 295 sq ft of carpet area
  • Under 1,000 sq ft295 sq ft474

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10,117 m² in all, by use
  • Apartment buildings4,047 m² · 40%
  • Roads2,262 m² · 22%
  • Pavements1,518 m² · 15%
  • Parking1,484 m² · 15%
  • Green belts535 m² · 5%
  • Parks and playgrounds271 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 92, GurugramSector 92, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Delhi–Gurugram–SNB RRTS5.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Commercial Colony registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 155 OF 2017, registered on 28 Aug 2017. The register’s record shows an end date of 27 Feb 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Commercial Colony?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 27 Aug 2024. Its registration runs to 27 Feb 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Commercial Colony?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Colony is in Sector 92, Gurugram; the site address declared to HARERA is Sector 92, Gurgaon. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Colony?From the records · HARERA, read 4 Nov 2026

Commercial Colony is a Ameya Commercial Projects project, registered by its company AMEYA COMMERCIAL PROJECTS PVT LTD.

The source ↗Ameya Commercial Projects's projects and court record

The records

What the registers hold for Commercial Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 155 OF 2017: Registration lapsed. The register’s record shows an end date of 27 Feb 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 102 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 12 Aug 2025.DTCP, read 3 Nov 2026
The court record of Ameya Commercial Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 102 OF 2014 lapsed

    Named in this project’s application. Valid to 12 Aug 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 27 Feb 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
155 OF 2017
Registration date
28 Aug 2017
Registration valid till
27 Feb 2026
Declared possession
27 Aug 2024

Declared by the promoter to HARERA

Land area
2.50 (Acre) (10,117.14 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
102 of 2014
Estimated project cost
₹126.04 crore
Cost of land
₹0.13 crore
Completion declared for
27 Aug 2024
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type · 474 units · 27.42 sq m carpet · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. CONSENT TO ESTABLISH — declared: already been obtained (30 Oct 2018)
  • II. MINING PERMISSION — declared: already been obtained (13 Jan 2018)
  • III. REGISTRATION UNDER BOCW ACT — declared: already been obtained (31 May 2019)
  • IV. SANCTIONED LETTER OF APPROVAL OF BUILDING PLANS — declared: already been obtained (26 Feb 2015)
  • V. ASSURANCE OF WATER SUPPLY — declared: already been obtained (4 Nov 2015)
  • VI. NOC FOR CONSTRUCTION PURPOSE — declared: already been obtained (3 Sept 2014)
  • VII. ASSURANCE OF ELECTRICAL CONNECTION — declared: already been obtained (21 Oct 2014)
  • VIII. ASSURANCE OF EXTERNAL SERVICES — declared: already been obtained (20 Dec 2014)
  • IX. FOREST NOC — declared: already been obtained (8 Jun 2013)
  • X. ARAVALI NOC — declared: already been obtained (13 Feb 2015)
  • XI. AIRPORT AUTHORITY HEIGHT PERMISSION — declared: already been obtained (11 Mar 2015)
  • XII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (27 Apr 2018)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan7 Dec 2019

Layout plan

1 file
Latest Layout Plan7 Dec 2019

Zoning plan

1 file
Zoning Plan9 Mar 2021

Demarcation plan

1 file
Demarcation Plan9 Mar 2021

Building plans

2 files
Building Plan Approval9 Mar 2021Approved Building Plans, Full Set7 Dec 2019

Floor plans

1 file
Annexure-Details of the Plots/apartments in the Project10 Mar 2021

Services

Service plans

1 file
Service Plans on the Layout9 Mar 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule9 Mar 2021

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures9 Mar 2021Non-Default Certificate from a CA9 Mar 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Mar 2021

HARERA’s orders

HARERA’s orders

1 file
Extension no. 27 of 2025 dated 17.06.202518 Jul 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

102 OF 2014 · Ameya Commercial Projects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 12 Aug 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

102 OF 2014: 4 parcels, 2.5 acres in all, in Meoka (hadbast 121), tehsil Harsaru.

The licence register prints the same licensed area, 2.5 acres.

  • 5//20/21 kanal 10 marla
  • 5//217 kanal 12 marla
  • 14//17 kanal 12 marla
  • 14//10/2/13 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Meoka (hadbast 121), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 5//20/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 92, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan7 Dec 2019

Layout plan

1 file
Latest Layout Plan7 Dec 2019

Building plans

2 files
Building Plan Approval9 Mar 2021Approved Building Plans, Full Set7 Dec 2019

Floor plans

1 file
Annexure-Details of the Plots/apartments in the Project10 Mar 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1033 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ameya Commercial Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.