Skip to content

COURTYARD 37D

by Eternal Sunshine Infra · Sector 37D, Gurugram

Not on our price list yet

Possession 30 Sep 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 37D, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered by
ETERNAL HOUSING INFRA LLPthe company that filed it, for Eternal Sunshine Infra
Timeline
  1. 18 May 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 12 Oct 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.631 acres in all, by use
  • Parking1.797 acres · 49%
  • Plots for sale1.198 acres · 33%
  • Roads0.306 acres · 8%
  • Green belts0.266 acres · 7%
  • Other usesas the form names them: Utility, Toilet0.065 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37D, GurugramSector 37D, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)6.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is COURTYARD 37D registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/798/530/2024/25. Valid to 30 Sep 2028.

The source ↗
What is the possession timeline for COURTYARD 37D?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2028. Its registration runs to 30 Sep 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around COURTYARD 37D?From the records · Map pin and road lines, read 6 Sep 2026

COURTYARD 37D is in Sector 37D, Gurugram; the site address declared to HARERA is Sector 37-D Vill Harsaru, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building COURTYARD 37D?From the records · HARERA, read 3 Nov 2026

COURTYARD 37D is a Eternal Sunshine Infra project, registered by its company ETERNAL HOUSING INFRA LLP.

The source ↗Eternal Sunshine Infra's projects and court record

The records

What the registers hold for COURTYARD 37D: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/798/530/2024/25: Registered. Valid to 30 Sep 2028.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2023 is on the DTCP register, valid to 1 Mar 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Oct 2023, building plans 18 May 2023.Declared to HARERA, read 29 Oct 2026
The court record of Eternal Sunshine Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 32 HARERA files, with the dates we read them
Registration no.
GGM/798/530/2024/25
Registration valid till
30 Sept 2028
Declared possession
30 Sept 2028

Declared by the promoter to HARERA

Land area
3.63125 (Acre) (14,695.15 sq m)
FAR
1.45 proposed of 1.5 permissible
licence
Licence No. 47 of 2023 dated 02.03.2023 Licence No. 203 of 2023 dated 09.10.2023 granted by Directorate, Department of Town and Country Planning, Haryana, Chadigarh
Estimated project cost
₹86.48 crore
Cost of land
₹41.19 crore
Layout plan, declared approved (field 5a)
12 Oct 2023
Building plans, declared approved
18 May 2023
Construction to start
1 Jan 2024
Completion declared for
30 Sept 2028
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE 203 OF 2023 — declared: already been obtained (9 Oct 2023)
  • II. LICENSE 47 OF 2023 — declared: already been obtained (2 Mar 2023)
  • III. LAYOUT PLAN — declared: already been obtained (12 Oct 2023)
  • IV. STANDARD DESIGN — declared: already been obtained (18 May 2023)
  • V. SPE — declared: already been obtained (26 Feb 2024)
On file with HARERA · 32 files

On file with HARERA (32)

Plans

Site plan

1 file
Approved Site Plan28 Nov 2023

Layout plan

3 files
Garden Hyderant Layout14 Jun 2024Layout Plan14 Jun 2024Latest Layout Plan28 Nov 2023

Demarcation plan

1 file
Demarcation Plan28 Nov 2023

Building plans

10 files
Sd Approved Drawings 3.63 Acre-314 Jun 2024Sd Approved Drawings 363 Acre-614 Jun 2024Sd Approved Drawings 363 Acre-514 Jun 2024

Services

Sewerage and drainage

2 files
External Drainage Layout14 Jun 2024External Sewerage Layout14 Jun 2024

Water supply

1 file
External Water Supply14 Jun 2024

Roads

1 file
Road Layout14 Jun 2024

Service plans

3 files
Approved Service Estimates First14 Jun 2024Service Esimate Final Booklet14 Jun 2024Service Plans on the Layout14 Jun 2024

Approvals and clearances

DTCP licence

3 files
Licence 47 of 202314 Jun 2024License 47 of 202314 Jun 2024Licence Copy with Land Schedule28 Nov 2023

Land records

Land records

3 files
Non Encumbrance & Owership Certificate DT.16.01.24 3.63125 Acre14 Jun 2024Jamabandi Mutation Ak Shijra14 Jun 2024TSR14 Jun 2024

Money

Accounts and finance

3 files
Non-Default Certificate from a CA14 Jun 2024CA Certificate on the Application’s Figures14 Jun 2024Cash Flow Statement28 Nov 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

47 OF 2023 · Eternal Housing Infra LLP · GURGAON-MANESAR

Licence valid to 1 Mar 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

203 OF 2023 · Eternal Housing Infra LLP · GURGAON-MANESAR

Licence valid to 8 Oct 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Nov 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2023: 3 parcels, 2.2 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 2.2 acres.

  • 30//16/16 kanal 12 marla
  • 31//19min3 kanal
  • 31//208 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

203 OF 2023: 2 parcels, 1.4312 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 1.4313 acres.

  • 31//12/26 kanal 9 marla
  • 31//195 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//16/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Nov 2023

Layout plan

3 files
Garden Hyderant Layout14 Jun 2024Layout Plan14 Jun 2024Latest Layout Plan28 Nov 2023

Building plans

10 files
Sd Approved Drawings 3.63 Acre-314 Jun 2024Sd Approved Drawings 363 Acre-614 Jun 2024Sd Approved Drawings 363 Acre-514 Jun 2024Standard Design Block A14 Jun 2024Standard Design Block B14 Jun 2024Sd Approved Drawings 3.63 Acre-214 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (32 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2710 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Eternal Sunshine Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.