ELAN EPIC

by Elan Group · Sector 70, Gurugram

Not on our price list yet

Possession 31 Dec 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
6 Dec 2018
Registered by
ELAN LIMITEDthe company that filed it, for Elan Group
Timeline
  1. 15 Nov 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 6 Dec 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningAs per DBR in select spaces
  • Lifts6 NOS
  • FloorsStone/ tile flooring in common areas
  • WallsCement plaster
  • BathroomsWhite chinaware with CP fittings
  • WindowsAluminium frames with glass
  • Main doorCommercial flush door shutters
  • Electrical fittingsElectrical fittings & fixtures not provided

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 7
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ELAN EPIC registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/298/2018/30, registered on 6 Dec 2018. Ended 31 Dec 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for ELAN EPIC?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 31 Dec 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELAN EPIC?From the records · Map pin and road lines, read 6 Sep 2026

ELAN EPIC is in Sector 70, Gurugram; the site address declared to HARERA is Sector - 70, Gurugram. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELAN EPIC?From the records · HARERA, read 4 Nov 2026

ELAN EPIC is a Elan Group project, registered by its company ELAN LIMITED.

The source ↗Elan Group's projects and court record

The records

What the registers hold for ELAN EPIC: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/298/2018/30: Registration expired. Ended 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 148 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 1 Aug 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Nov 2018, building plans 15 Nov 2018.Declared to HARERA, read 29 Oct 2026
The court record of Elan Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 148 OF 2008 validity ended

    Named in this project’s application. Valid to 1 Aug 2020. The register links a completion certificate (LC-IX), dated 20 Dec 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 17 HARERA files, with the dates we read them
Registration no.
GGM/298/2018/30
Registration date
6 Dec 2018
Registration valid till
31 Dec 2023
Declared possession
31 Dec 2023

Declared by the promoter to HARERA

Land area
3.525 (Acre) (14,265.17 sq m)
FAR
1.75 proposed
licence
148 of 2008 (01/08/2020)
Estimated project cost
₹370.00 crore
Cost of land
₹33.54 crore
Layout plan, declared approved (field 5a)
15 Nov 2018
Building plans, declared approved
15 Nov 2018
Construction to start
15 Feb 2019
Completion declared for
31 Dec 2023
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 404 units · 5,357 sq m carpet · 1 tower
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. TRANFER OF LICENCE — declared: already been obtained (23 Oct 2018)
  • II. CHANGE OF DEVELOPER — declared: already been obtained (23 Oct 2018)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (15 Nov 2018)
  • IV. ELECTRICAL LOAD NOC — declared: already been obtained (31 Oct 2018)
  • V. CONSTRUCTION WATER NOC — declared: already been obtained (13 Nov 2018)
  • VI. AAI HEIGHT APPROVAL — declared: already been obtained (6 Nov 2018)
On file with HARERA · 17 files

On file with HARERA (17)

Plans

Site plan

1 file
Approved Site Plan12 Nov 2018

Layout plan

1 file
Latest Layout Plan16 Nov 2018

Zoning plan

1 file
Zoning Plan12 Nov 2018

Demarcation plan

1 file
Demarcation Plan16 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set15 Nov 2018

Services

Electricity

1 file
Electrical Load Availability15 Nov 2018

Service plans

1 file
Service Plans on the Layout16 Nov 2018

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate9 Aug 2024

Completion certificate (CC)

1 file
CC uploaded9 Sept 2025

DTCP licence

1 file
Licence Copy with Land Schedule12 Nov 2018

Environment clearance

1 file
Environmental Clearance16 Nov 2018

Other NOCs and clearances

1 file
HUDA Construction Water NOC15 Nov 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration16 Nov 2018

Money

Accounts and finance

3 files
Cash Flow Statement16 Nov 2018CA Certificate on the Application’s Figures15 Nov 2018Non-Default Certificate from a CA15 Nov 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Nov 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

148 OF 2008 · Elan Ltd. · GURGAON-MANESAR

Licence valid to 1 Aug 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Nov 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

148 OF 2008: 8 parcels, 4 acres in all, in Tikli (hadbast 167), tehsil Badshahpur.

The licence register prints the licensed area as 3.525 acres.

  • rectangle 78, kila 17/15 kanal 16 marla
  • rectangle 78, kila 17/22 kanal 4 marla
  • rectangle 78, kila 18 min6 kanal 10 marla
  • rectangle 78, kila 23/12 kanal 1 marla
Show the other 4 parcels
  • rectangle 78, kila 23/24 kanal 16 marla
  • rectangle 78, kila 24/12 kanal 1 marla
  • rectangle 78, kila 24/24 kanal 16 marla
  • rectangle 78, kila 25/13 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Tikli (hadbast 167), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 78, kila 17/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan12 Nov 2018

Layout plan

1 file
Latest Layout Plan16 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set15 Nov 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (17 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/277 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Elan Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.