Skip to content

ELEVATE (PHASE II)

by Heritage Max Realtech · Sector 59, Gurugram

Not on our price list yet

Possession 30 Jun 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 59, Gurugram5.7 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
1,159–1,432 sq ft
In m²about 108–133 m², as declared
Registered by
HERITAGE MAX REALTECH PVT. LTD.the company that filed it, for Heritage Max Realtech
Timeline
  1. 25 Apr 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Jan 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

248homes, 1,159 to 1,432 sq ft of carpet area
  • 1,000–1,500 sq ft1,159–1,432 sq ft248

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.969 acres in all, by use
  • Other uses1.689 acres · 57%
  • Apartment buildings0.6 acres · 20%
  • Parks and playgrounds0.46 acres · 15%
  • Roads0.22 acres · 7%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV system
  • KitchenFloor tiles and paint
  • Kitchen appliancesStandard modular kitchen with hob and chimney
  • LiftsHigh RISE – 8 NOS. passenger lift & 2 NOS. service/fireman lift commercial 1 NOS. passenger lift
  • FloorsTiles
  • WallsPaint surface
  • BathroomsStandard CP fitting + WC+washbasin
  • WindowsDouble/ single glass + clear tented glass with UPVC frames in all habitable area

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 59, GurugramSector 59, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)5.7 km
  • Delhi–Gurugram–SNB RRTS8.3 km
  • Dwarka ExpresswayOpen, 17 Aug 202511.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ELEVATE (PHASE II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/459/191/2021/27. Ended 30 Jan 2026. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for ELEVATE (PHASE II)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2025. Its registration runs to 30 Jan 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELEVATE (PHASE II)?From the records · Map pin and road lines, read 6 Sep 2026

ELEVATE (PHASE II) is in Sector 59, Gurugram; the site address declared to HARERA is Village Behrampur, Sector-59, Gurugram. In a straight line it is about 5.7 km from Sohna Elevated Corridor (NH-248A), 8.3 km from Delhi–Gurugram–SNB RRTS and 11.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELEVATE (PHASE II)?From the records · HARERA, read 4 Nov 2026

ELEVATE (PHASE II) is a Heritage Max Realtech project, registered by its company HERITAGE MAX REALTECH PVT. LTD..

The source ↗Heritage Max Realtech's projects and court record

The records

What the registers hold for ELEVATE (PHASE II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/459/191/2021/27: Registration expired. Ended 30 Jan 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 16 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Jan 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Apr 2019, building plans 25 Apr 2019.Declared to HARERA, read 29 Oct 2026
The court record of Heritage Max Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Jan 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 16 OF 2008 lapsed

    Named in this project’s application. Valid to 30 Jan 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 28 OF 2008 lapsed

    Named in this project’s application. Valid to 16 Feb 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 35 HARERA files, with the dates we read them
Registration no.
GGM/459/191/2021/27
Registration valid till
30 Jan 2026
Declared possession
30 Jun 2025

Declared by the promoter to HARERA

Land area
2.96875 (Acre) (12,014.11 sq m)
FAR
1.87 proposed of 1.87 permissible
licence
1. 16 of 2008 2. 28 of 2008 3. 44 of 2011
Estimated project cost
₹543.50 crore
Cost of land
₹182.85 crore
Layout plan, declared approved (field 5a)
25 Apr 2019
Building plans, declared approved
25 Apr 2019
Completion declared for
30 Jun 2025
Declared inventory · 6 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK (S) · 31 units · 107.68 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK (L) · 64 units · 118.33 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK + STUDY · 33 units · 113.03 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK (S) · 31 units · 107.68 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK (L) · 29 units · 118.33 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK + STUDY · 60 units · 133.03 sq m carpet · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (18 Mar 2019)
  • II. HEIGHT CLEARANCE — declared: already been obtained (10 Aug 2017)
  • III. FIRE PLAN — declared: already been obtained (13 Sept 2019)
  • IV. MINNING PLAN — declared: already been obtained (24 Jan 2019)
  • V. TREE CUTTING PERMISSION — declared: already been obtained (23 Nov 2020)
  • VI. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (25 Apr 2019)
  • VII. BENEFICIAL INTEREST PERMISSION — declared: already been obtained (27 Apr 2017)
On file with HARERA · 35 files

On file with HARERA (35)

Plans

Site plan

2 files
C4 .Site Plan Green Area & Parking Calculation29 Jul 2021Approved Site Plan3 Mar 2021

Layout plan

1 file
Latest Layout Plan29 Jul 2021

Zoning plan

1 file
Zoning Plan29 Jul 2021

Demarcation plan

1 file
Demarcation Plan2 Mar 2021

Building plans

11 files
A-35-Tower-D Machine Room & Water Tank Floor Plan & Area Diagram29 Jul 2021A-43-Tower-E Elevations E1 & E229 Jul 2021A-34-Tower-D 32ND, 33RD. & Terrace Floor Plans & Area Diagram29 Jul 2021

Floor plans

6 files
A-33-Tower-D Typical (22ND to 31ST) Floor Plans & Area Diagram29 Jul 2021A-41-Tower-E Typical (22ND to 30TH) Floor Plans & Area Diagram29 Jul 2021A-31-Tower-D Ground Floor Plan & Area Diagram & Ground Coverage29 Jul 2021

Services

Sewerage and drainage

2 files
Sewerage Layout29 Jul 2021Storm Water Layout29 Jul 2021

Water supply

1 file
Water Supply Layout29 Jul 2021

Roads

1 file
Road Plan Layout29 Jul 2021

Service plans

1 file
Service Plans on the Layout3 Mar 2021

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded12 Dec 2025OC uploaded25 Jul 2025

DTCP licence

1 file
Licence Copy with Land Schedule14 Jun 2021

Land records

Land records

2 files
1 Khasra Plan with Phase Demarcation-Model29 Jul 2021Revenue Record Entry of Licence and Collaboration29 Jul 2021

Money

Accounts and finance

1 file
Non-Default Certificate from a CA29 Jul 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit29 Jul 2021

HARERA’s orders

HARERA’s orders

1 file
Extension No. 06 of 2025 dated 20.02.20253 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

16 OF 2008 · Base Exports Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 30 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

28 OF 2008 · IREO Buzz Hotel · GURGAON-MANESAR

Licence valid to 16 Feb 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

44 OF 2011 · IREO Buzz Hotel · GURGAON-MANESAR

Licence valid to 12 May 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Apr 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

16 OF 2008: 35 parcels, 17.55 acres in all, in Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 17.55 acres.

  • 12//19/25 kanal 5 marla
  • 12//21/11 kanal 2 marla
  • 12//21/14 marla
  • 12//222 kanal 9 marla
Show the other 31 parcels
  • 12//225 kanal 11 marla
  • rectangle 12, kila 21/22 kanal 4 marla
  • 20//13 kanal
  • 20//105 kanal 1 marla
  • 20//29 kanal 4 marla
  • 13//24 min4 kanal
  • 13//25 min4 kanal
  • 19//105 kanal 16 marla
  • 19//102 kanal 4 marla
  • 19//12/22 kanal 12 marla
  • 19//138 kanal
  • 19//44 kanal
  • 19//43 kanal 12 marla
  • 19//51 kanal
  • 19//57 kanal
  • 19//68 kanal
  • 19//77 kanal 12 marla
  • 19//87 kanal 16 marla
  • 19//84 marla
  • 19//9/111 marla
  • 19//9/12 kanal 1 marla
  • 19//9/22 kanal 4 marla
  • 19//9/23 kanal 4 marla
  • 18//146 kanal
  • 18//143 kanal 18 marla
  • 18//15/14 marla
  • 18//15/12 kanal
  • 18//16/22 kanal 12 marla
  • 18//178 kanal
  • 18//68 kanal 7 marla
  • 18//61 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

28 OF 2008: 13 parcels, 11.9 acres in all, in Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 11.9 acres.

  • 18//258 kanal
  • 19//20 min3 kanal 16 marla
  • 19//218 kanal
  • 31//18 kanal
Show the other 9 parcels
  • 31//108 kanal
  • 31//21/13 kanal 16 marla
  • 32//158 kanal
  • 32//168 kanal
  • 32//258 kanal
  • 32//58 kanal
  • 32//68 kanal
  • 34//5/17 kanal 16 marla
  • 35//1/17 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

44 OF 2011: 9 parcels, 4.725 acres in all, in Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 4.73 acres.

  • 19//19/219 marla
  • 19//19/3/219 marla
  • 19//22/12 kanal 4 marla
  • 19//22/23 kanal 7 marla
Show the other 5 parcels
  • 31//11/15 kanal 18 marla
  • 31//20/25 kanal 19 marla
  • 31//21/24 kanal 4 marla
  • 31//228 kanal
  • 35//2/1/16 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Behrampur (hadbast 80), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 12//19/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
C4 .Site Plan Green Area & Parking Calculation29 Jul 2021Approved Site Plan3 Mar 2021

Layout plan

1 file
Latest Layout Plan29 Jul 2021

Building plans

11 files
A-35-Tower-D Machine Room & Water Tank Floor Plan & Area Diagram29 Jul 2021A-43-Tower-E Elevations E1 & E229 Jul 2021A-34-Tower-D 32ND, 33RD. & Terrace Floor Plans & Area Diagram29 Jul 2021A-36-Tower-D Elevations E1 & E229 Jul 2021A-37-Tower-D Elevations E3 & E429 Jul 2021A-38-Tower-D Sections A-A & B-B29 Jul 2021

Floor plans

6 files
A-33-Tower-D Typical (22ND to 31ST) Floor Plans & Area Diagram29 Jul 2021A-41-Tower-E Typical (22ND to 30TH) Floor Plans & Area Diagram29 Jul 2021A-31-Tower-D Ground Floor Plan & Area Diagram & Ground Coverage29 Jul 2021A-32-Tower-D Typical (1ST to 21ST) Floor Plans & Area Diagram29 Jul 2021A-39-Tower-E Ground Floor Plan & Area Diagram & Ground Coverage29 Jul 2021A-40-Tower-E Typical (1ST to 21ST) Floor Plans & Area Diagram29 Jul 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (35 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1395 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Heritage Max Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.