Not on our price list yet

Possession 23 Aug 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 59, Gurugram5.7 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
1,535–2,740 sq ft
In m²about 143–255 m², as declared
Registered by
MAHINDRA HOMES PRIVATE LIMITEDthe company that filed it, for Mahindra Homes Pvt. Ltd. & IREO
Timeline
  1. 23 Aug 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Aug 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

140homes, 1,535 to 2,740 sq ft of carpet area
  • 1,500–2,000 sq ft1,535–1,624 sq ft136
  • 2,500–3,000 sq ft2,740 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.415 acres in all, by use
  • Parks and playgrounds1.046 acres · 74%
  • Apartment buildings0.214 acres · 15%
  • Pavements0.155 acres · 11%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV AIR-conditioning
  • KitchenCeramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area,ceiling - low VOC acrylic emulsion paint and PART gypsum board false ceiling as per design. modular kitchen cabinet with granite counter-top, hob (haffele), chimney WILL be provided.
  • Kitchen appliancesModular kitchen cabinet with granite counter top/ hob, chimney WILL be provided.
  • LiftsHigh speed elevators- by thyssenkrupp or equivalent
  • FloorsLiving room / dining family lounge - italian/ imported marble bed room-laminated wooden floor kitchen-anti-skid vitrified tiles toilets-anti-skid vitrified tiles bathrooms -anti-skid vitrified tiles balconies / terraces-anti-skid vitrified tiles servant room & toilet-anti-skid vitrified tiles apartment lift lobbies (private).-italian/ imported marble
  • WallsWalls - low VOC acrylic emulsion paint , ceramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area ,vitrified tiles up to false ceiling with granite on the counter ,SS handrail with laminated toughened glass with granite coping,low VOC oil-based distemper paint , stone cladding and low VOC acrylic emulsion paint
  • BathroomsTOTO, grohe or equivalent
  • WindowsUPVC framed double glazing

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 59, GurugramSector 59, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)5.7 km
  • Delhi–Gurugram–SNB RRTS8.3 km
  • Dwarka ExpresswayOpen, 17 Aug 202511.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is LUMINARE PHASE 3 (TOWER B) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/551/283/2022/26. The register’s record shows an end date of 23 Aug 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for LUMINARE PHASE 3 (TOWER B)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 23 Aug 2026. Its registration runs to 23 Aug 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around LUMINARE PHASE 3 (TOWER B)?From the records · Map pin and road lines, read 6 Sep 2026

LUMINARE PHASE 3 (TOWER B) is in Sector 59, Gurugram; the site address declared to HARERA is Sector 59 ,Behrampur ,Gurugram ,Haryana 122001. In a straight line it is about 5.7 km from Sohna Elevated Corridor (NH-248A), 8.3 km from Delhi–Gurugram–SNB RRTS and 11.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building LUMINARE PHASE 3 (TOWER B)?From the records · HARERA, read 4 Nov 2026

LUMINARE PHASE 3 (TOWER B) is a Mahindra Homes Pvt. Ltd. & IREO project, registered by its company MAHINDRA HOMES PRIVATE LIMITED.

The source ↗Mahindra Homes Pvt. Ltd. & IREO's projects and court record

The records

What the registers hold for LUMINARE PHASE 3 (TOWER B): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/551/283/2022/26: Registration lapsed. The register’s record shows an end date of 23 Aug 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 16 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Jan 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 23 Aug 2021.Declared to HARERA, read 29 Oct 2026
The court record of Mahindra Homes Pvt. Ltd. & IREO’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 16 OF 2008 lapsed

    Named in this project’s application. Valid to 30 Jan 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 23 Aug 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 30 HARERA files, with the dates we read them
Registration no.
GGM/551/283/2022/26
Registration valid till
23 Aug 2026
Declared possession
23 Aug 2026

Declared by the promoter to HARERA

Land area
1.415 (Acre) (5,726.3 sq m)
FAR
1.87 proposed of 1.87 permissible
licence
16 of 2008 , dated 31.01.2008 Renewed up to 30/01/2025
Estimated project cost
₹384.97 crore
Cost of land
₹1.53 crore
Building plans, declared approved
23 Aug 2021
Construction to start
1 Jun 2021
Completion declared for
23 Aug 2026
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 128 units · 150.875 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 142.568 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 254.547 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. MINING PERMISSION — declared: already been obtained (29 Jun 2021)
  • II. SEWAGE DISPOSAL — declared: already been obtained (2 Jun 2021)
  • III. STORM WATER DRAINAGE — declared: already been obtained (1 Jul 2021)
  • IV. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (24 Nov 2020)
  • V. FOREST NOC — declared: already been obtained (4 Jun 2014)
  • VI. WATER SUPPLY — declared: already been obtained (25 Apr 2019)
  • VII. FIRE SCHEME APPROVAL MEMO NO. FS/2021/25 — declared: already been obtained (21 Oct 2021)
  • VIII. AIRPORT HEIGHT CLEARANCE AAI/RHQ/NR/ATM/NOC/2021/137/558-56 — declared: already been obtained (8 Apr 2021)
  • IX. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN SEIAA (128)/HR/2021/652 — declared: already been obtained (13 Jul 2021)
  • X. BUILDING PLAN / SITE PLAN APPROVAL MEMO NO. ZP- 435-VOL-II/AD(RA)/2021/20785 — declared: already been obtained (23 Aug 2021)
  • XI. CONSTRUCTION WATER NOC — declared: already been obtained (25 Apr 2019)
  • XII. SERVICE PLAN ESTIMATES APPROVAL 8LC1042 VOL II JE (VA) 2021 — declared: applied for but yet to receive (6 Sept 2021)
On file with HARERA · 30 files

On file with HARERA (30)

Plans

Site plan

2 files
Superimposed Plan24 May 2022Approved Site Plan16 Sept 2021

Layout plan

1 file
Latest Layout Plan21 Sept 2021

Zoning plan

1 file
Zoning Plan16 Sept 2021

Demarcation plan

1 file
Demarcation Plan9 May 2022

Building plans

4 files
Elevation Plan16 Sept 2021Building Plan Approval Letter (BR-III)16 Sept 2021X-Section Plan16 Sept 2021Approved Building Plans, Full Set16 Sept 2021

Floor plans

2 files
Floors Plan21 Apr 2022Parking Plan16 Sept 2021

Services

Sewerage and drainage

1 file
Sewer Assurance9 May 2022

Service plans

3 files
A Service Plan24 May 2022Service Plans on the Layout24 May 2022Service Plan and Estimates Approval/sanction Letter Only4 May 2022

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule4 May 2022LOI16 Sept 2021LC-IV16 Sept 2021

Environment clearance

1 file
Environment Clearance Approval16 Sept 2021

Fire safety

1 file
Fire Scheme Approval21 Apr 2022

Other NOCs and clearances

4 files
Strom Water NOC9 May 2022Water NOC21 Apr 2022Airport Height Clearance16 Sept 2021Forest NOC16 Sept 2021

Land records

Land records

2 files
Phasing Sajra Revised24 May 2022Revenue Record Entry of Licence and Collaboration4 May 2022

Money

Accounts and finance

2 files
Cash Flow Statement24 May 2022Non-Default Certificate from a CA16 Sept 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit28 Apr 2022

Other filings

Other filings

1 file
Bip16 Sept 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

16 OF 2008 · Base Exports Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 30 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Sept 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

16 OF 2008: 35 parcels, 17.55 acres in all, in Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 17.55 acres.

  • 12//19/25 kanal 5 marla
  • 12//21/11 kanal 2 marla
  • 12//21/14 marla
  • 12//222 kanal 9 marla
Show the other 31 parcels
  • 12//225 kanal 11 marla
  • rectangle 12, kila 21/22 kanal 4 marla
  • 20//13 kanal
  • 20//105 kanal 1 marla
  • 20//29 kanal 4 marla
  • 13//24 min4 kanal
  • 13//25 min4 kanal
  • 19//105 kanal 16 marla
  • 19//102 kanal 4 marla
  • 19//12/22 kanal 12 marla
  • 19//138 kanal
  • 19//44 kanal
  • 19//43 kanal 12 marla
  • 19//51 kanal
  • 19//57 kanal
  • 19//68 kanal
  • 19//77 kanal 12 marla
  • 19//87 kanal 16 marla
  • 19//84 marla
  • 19//9/111 marla
  • 19//9/12 kanal 1 marla
  • 19//9/22 kanal 4 marla
  • 19//9/23 kanal 4 marla
  • 18//146 kanal
  • 18//143 kanal 18 marla
  • 18//15/14 marla
  • 18//15/12 kanal
  • 18//16/22 kanal 12 marla
  • 18//178 kanal
  • 18//68 kanal 7 marla
  • 18//61 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Behrampur (hadbast 80), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 12//19/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Superimposed Plan24 May 2022Approved Site Plan16 Sept 2021

Layout plan

1 file
Latest Layout Plan21 Sept 2021

Building plans

4 files
Elevation Plan16 Sept 2021Building Plan Approval Letter (BR-III)16 Sept 2021X-Section Plan16 Sept 2021Approved Building Plans, Full Set16 Sept 2021

Floor plans

2 files
Floors Plan21 Apr 2022Parking Plan16 Sept 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (30 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1729 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mahindra Homes Pvt. Ltd. & IREO

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.