Godrej Air Phase-1

by Godrej Properties · Sector 85, Gurugram

Not on our price list yet

Possession 31 Jan 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 85, Gurugram1.9 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
895–1,654 sq ft
In m²about 83–154 m², as declared
Registered
7 Dec 2018
Registered by
GODREJ DEVELOPERS AND PROPERTIES LLPthe company that filed it, for Godrej Properties
Timeline
  1. 28 Sep 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 7 Dec 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 29 Jun 2027Registration valid toHARERA, read 4 Nov 2026
  4. 31 Jan 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

178homes, 895 to 1,654 sq ft of carpet area
  • Under 1,000 sq ft895–994 sq ft80
  • 1,000–1,500 sq ft1,371 sq ft48
  • 1,500–2,000 sq ft1,654 sq ft50

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside21,917 m² in all, by use
  • Parks and playgrounds11,234 m² · 51%
  • Roads4,410 m² · 20%
  • Pavements1,890 m² · 9%
  • Parking1,325 m² · 6%
  • Apartment buildings1,272 m² · 6%
  • Green belts953 m² · 4%
  • Club house833 m² · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCounter with sink and CP fittings or equivalent
  • Kitchen appliancesYes
  • LiftsYes
  • WardrobesNo wardrobe provided
  • FloorsVitrified tiles in living/dining, wooden flooring in bedrooms, anti skid tiles in toilets, kitchen, balcony & utility or equivalent
  • WallsAcrylic emulsion in internal walls, weather proof in external walls or equivalent
  • BathroomsYes
  • WindowsAluminium

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 85, GurugramSector 85, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.9 km
  • Delhi–Gurugram–SNB RRTS2.5 km
  • Sohna Elevated Corridor (NH-248A)8.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 13 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 8
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Godrej Air Phase-1 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/300/2018/32, registered on 7 Dec 2018. Valid to 29 Jun 2027.

The source ↗
What is the possession timeline for Godrej Air Phase-1?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2029. Its registration runs to 29 Jun 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Air Phase-1?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Air Phase-1 is in Sector 85, Gurugram; the site address declared to HARERA is Sector 85, Village Baddha. In a straight line it is about 1.9 km from Dwarka Expressway, 2.5 km from Delhi–Gurugram–SNB RRTS and 8.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Godrej Air Phase-1?From the records · HARERA, read 4 Nov 2026

Godrej Air Phase-1 is a Godrej Properties project, registered by its company GODREJ DEVELOPERS AND PROPERTIES LLP.

The source ↗Godrej Properties's projects and court record

The records

What the registers hold for Godrej Air Phase-1: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/300/2018/32: Registered. Valid to 29 Jun 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 115 OF 2012 is on the DTCP register, valid to 15 Nov 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Sep 2018, building plans 28 Sep 2018.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Properties’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
GGM/300/2018/32
Registration date
7 Dec 2018
Registration valid till
29 Jun 2027
Declared possession
31 Jan 2029

Declared by the promoter to HARERA

Land area
5.417 (Acre) (21,921.82 sq m)
FAR
the application prints 184, which is not a ratio
licence
115 of 2012
Estimated project cost
₹188.61 crore
Cost of land
₹30.11 crore
Layout plan, declared approved (field 5a)
28 Sept 2018
Building plans, declared approved
28 Sept 2018
Construction to start
1 Feb 2019
Completion declared for
31 Jan 2029
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1 unit · 83.98 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 78 units · 83.11 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 92.33 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 48 units · 127.41 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 24 units · 153.68 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 26 units · 153.68 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 20

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (16 Nov 2012)
  • II. LICENSE RENEWAL — declared: already been obtained (30 Jun 2017)
  • III. FOREST NOC — declared: already been obtained (13 Mar 2013)
  • IV. LICENSE — declared: already been obtained (16 Nov 2012)
  • V. LICENSE RENEWAL — declared: already been obtained (30 Jun 2017)
  • VI. FOREST NOC — declared: already been obtained (13 Mar 2013)
  • VII. NATURAL CONSERVATION ZONE NOC — declared: already been obtained (18 Jul 2018)
  • VIII. AIRPORT HEIGHT CLEARANCE NOC — declared: already been obtained (27 Sept 2018)
  • IX. LICENSE — declared: already been obtained (16 Nov 2012)
  • X. LICENSE RENEWAL — declared: already been obtained (30 Jun 2017)
  • XI. FOREST NOC — declared: already been obtained (13 Mar 2013)
  • XII. LICENSE — declared: already been obtained (16 Nov 2012)
  • XIII. LICENSE RENEWAL — declared: already been obtained (30 Jun 2017)
  • XIV. FOREST NOC — declared: already been obtained (13 Mar 2013)
  • XV. NATURAL CONSERVATION ZONE NOC — declared: already been obtained (18 Jul 2018)
  • XVI. AIRPORT HEIGHT CLEARANCE NOC — declared: already been obtained (27 Sept 2018)
  • XVII. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (6 Dec 2012)
  • XVIII. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (5 Dec 2012)
  • XIX. ENVIRONMENTAL CLEARANCE — declared: already been obtained (13 Jul 2018)
  • XX. CONSENT TO ESTABLISH — declared: already been obtained (28 Sept 2018)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan4 Oct 2018

Layout plan

1 file
Latest Layout Plan4 Oct 2018

Zoning plan

1 file
Zoning Plan4 Oct 2018

Demarcation plan

1 file
Demarcation Plan4 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set4 Oct 2018

Services

Service plans

1 file
Service Plans on the Layout29 Oct 2018

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule4 Oct 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Oct 2018

Money

Accounts and finance

3 files
Cash Flow Statement29 Oct 2018CA Certificate on the Application’s Figures4 Oct 2018Non-Default Certificate from a CA4 Oct 2018

HARERA’s orders

HARERA’s orders

1 file
Extension No. 07 of 2025 dated 20.02.202524 Feb 2025

Other filings

Other filings

1 file
PROJECT CONTINUATION- RC/REP/HARERA/GGM/32 of 2018/7(3)/75/2025/17 DATED 03.07.20257 Jul 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

115 OF 2012 · Godrej Developers and Properties LLP · GURGAON-MANESAR

Licence valid to 15 Nov 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Oct 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

115 OF 2012: 20 parcels, 10.0438 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 10.043 acres.

  • 15//14/17 kanal
  • 15//17/14 kanal 18 marla
  • 15//17/23 kanal 2 marla
  • 15//18/2/1/21 kanal 2 marla
Show the other 16 parcels
  • 15//18/2/21 kanal 2 marla
  • 15//18/39 marla
  • 15//23/15 kanal 7 marla
  • 15//23/22 kanal 13 marla
  • 26//11/2/14 kanal 2 marla
  • 26//12/1/12 kanal 13 marla
  • 26//2/26 kanal
  • 26//38 kanal
  • 26//7/14 marla
  • 26//88 kanal
  • 26//9/13 kanal 1 marla
  • 26//9/24 kanal 19 marla
  • 25//15/4/219 marla
  • 15//12/2/216 marla
  • 15//198 kanal
  • 15//248 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//14/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 85 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 Oct 2018

Layout plan

1 file
Latest Layout Plan4 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set4 Oct 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/142 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.