Skip to content

GRATITUDE 84

by Lamose Infra · Sector 84, Gurugram

Not on our price list yet

Possession 30 Apr 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight line
Carpet area
728–875 sq ft
In m²about 68–81 m², as declared
Registered by
LAMOSE INFRA LLPthe company that filed it, for Lamose Infra
Timeline
  1. 25 Nov 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

154homes, 728 to 875 sq ft of carpet area
  • Under 1,000 sq ft728–875 sq ft154

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 39 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6,854 m² in all, by use
  • Other usesas the form names them: Guard and meter room, Internal roads and pavements, Area under commercial2,661 m² · 39%
  • Parks and playgrounds2,004 m² · 29%
  • Apartment buildings1,358 m² · 20%
  • Roads446 m² · 7%
  • Parking385 m² · 6%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningWithout and with split AC
  • KitchenSEMI furnished without modular
  • Lifts4 no'S units per floor, 2 passenger lift, 1 service lift-johnson, thyssenkr UPP or equivalent
  • FloorsLiving room, dining room, internal lobby area -imported marble / vetrified tile. master bedroom, other bedroom-laminated wooden flooring. master toilet, other toilet, kitchen, room/utility room - anti skid tiles. stair CASE-P- white
  • WallsInternal wall-OBD & plastic emulsion. extern/AL wall-texture
  • BathroomsFaucet, basin, WC
  • Windows"aluminium with 6MM toughene D glass"
  • Main doorLaminated shutter

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 84, GurugramSector 84, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)7.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is GRATITUDE 84 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1034/766/2026/06. Valid to 30 Apr 2032.

The source ↗
What is the possession timeline for GRATITUDE 84?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2032. Its registration runs to 30 Apr 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GRATITUDE 84?From the records · Map pin and road lines, read 6 Sep 2026

GRATITUDE 84 is in Sector 84, Gurugram; the site address declared to HARERA is Sector 84, Village Sikandepur Badha, Gurugram. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GRATITUDE 84?From the records · HARERA, read 4 Nov 2026

GRATITUDE 84 is a Lamose Infra project, registered by its company LAMOSE INFRA LLP.

The source ↗Lamose Infra's projects and court record

The records

What the registers hold for GRATITUDE 84: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1034/766/2026/06: Registered. Valid to 30 Apr 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 68 OF 2025 is on the DTCP register, valid to 6 May 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 25 Nov 2025.Declared to HARERA, read 29 Oct 2026
The court record of Lamose Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 53 HARERA files, with the dates we read them
Registration no.
GGM/1034/766/2026/06
Registration valid till
30 Apr 2032
Declared possession
30 Apr 2032

Declared by the promoter to HARERA

Land area
1.69375 (Acre) (6,854.36 sq m)
FAR
2.39 proposed of 2.4 permissible
licence
LC-68 OF 2025 dated 07.05.2025
Estimated project cost
₹227.66 crore
Cost of land
₹58.01 crore
Building plans, declared approved
25 Nov 2025
Construction to start
1 May 2026
Completion declared for
30 Apr 2032
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 152 units · 81.3 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 67.62 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 30 units · 12 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 9 units · 9 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LC V — declared: already been obtained (7 May 2025)
  • II. BR III — declared: already been obtained (25 Nov 2025)
  • III. ZONING PLAN — declared: already been obtained (9 May 2025)
  • IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (16 Jul 2025)
  • V. FOREST NOC — declared: already been obtained (11 Feb 2025)
On file with HARERA · 53 files

On file with HARERA (53)

Plans

Site plan

3 files
Site Plan21 Jan 2026Site Plan (Showing Green)21 Jan 2026Approved Site Plan6 Dec 2025

Layout plan

1 file
Latest Layout Plan6 Dec 2025

Zoning plan

1 file
Zoning Plan2 Dec 2025

Demarcation plan

1 file
Demarcation Plan2 Dec 2025

Building plans

9 files
SECTION1- Tower A21 Jan 2026SECTION2 - Tower A21 Jan 202619 Floor Plan, Terrace Plan & Area Diagram- Tower B21 Jan 2026

Floor plans

8 files
Unit Plans- Tower B21 Jan 20262nd to 18th Floor Plan & Area Diagram - Tower A21 Jan 2026Ground Floor Plan & Area Diagram - Tower A21 Jan 2026

Services

Sewerage and drainage

2 files
GMDA Assurance- Sewarage Connection21 Jan 2026GMDA Assurance- Storm Water Drainage21 Jan 2026

Water supply

2 files
GMDA Assurance- Construction Water21 Jan 2026GMDA Assurance- Drinking Water21 Jan 2026

Electricity

1 file
Aff- Power Line Shifting21 Jan 2026

Approvals and clearances

DTCP licence

4 files
LOI21 Jan 2026LC IV-A21 Jan 2026LC IV21 Jan 2026Licence Copy with Land Schedule2 Dec 2025

Environment clearance

1 file
EC Applied21 Jan 2026

Other NOCs and clearances

7 files
Forest NOC21 Jan 2026DHBVN-Ep Permission21 Jan 2026Aff NCZ21 Jan 2026

Land records

Land records

2 files
Non Encumbrance Certificate21 Jan 2026Revenue Record Entry of Licence and Collaboration6 Dec 2025

Sales papers

Allotment and sale agreements

2 files
Allotment Letter22 Jan 2026BBA22 Jan 2026

Money

Accounts and finance

5 files
Cash Flow Statement21 Jan 2026CA Certificate-Net Worth21 Jan 2026CA Certificate - Project Cost Incurred21 Jan 2026

The promoter’s papers

Declarations and affidavits

3 files
Bank Undertaking21 Jan 2026Affidavit 4(2)(L)(D)21 Jan 2026The Promoter’s Declaration on Affidavit6 Dec 2025

Other filings

Other filings

1 file
Commercial Plans21 Jan 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

68 OF 2025 · LAMOSE INFRA LLP · GURGAON-MANESAR

Licence valid to 6 May 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Dec 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

68 OF 2025: 2 parcels, 1.6938 acres in all, in Sikanderpur badha (hadbast 109), tehsil Manesar.

The licence register prints the same licensed area, 1.6938 acres.

  • 2//188 kanal
  • 2//23/15 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sikanderpur badha (hadbast 109), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 2//18.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan21 Jan 2026Site Plan (Showing Green)21 Jan 2026Approved Site Plan6 Dec 2025

Layout plan

1 file
Latest Layout Plan6 Dec 2025

Building plans

9 files
SECTION1- Tower A21 Jan 2026SECTION2 - Tower A21 Jan 202619 Floor Plan, Terrace Plan & Area Diagram- Tower B21 Jan 2026Elevations - Block B21 Jan 2026Sections- Block B21 Jan 202619 Floor Plan, Terrace Plan & Area Diagram- Tower A21 Jan 2026

Floor plans

8 files
Unit Plans- Tower B21 Jan 20262nd to 18th Floor Plan & Area Diagram - Tower A21 Jan 2026Ground Floor Plan & Area Diagram - Tower A21 Jan 2026Unit Plans- Tower A21 Jan 2026Floors Plans & Area Diagram - Tower B21 Jan 2026Ground Floor Plan & Area Diagram - Tower B21 Jan 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (53 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3769 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Lamose Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.