SIGNATUREGLOBAL TWIN TOWER DXP
by Forever Buildtech · Sector 84, Gurugram
Not on our price list yet
Possession 30 May 2030 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight line
- Registered by
- FOREVER BUILDTECH PRIVATE LIMITEDthe company that filed it, for Forever Buildtech
- 28 Aug 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 May 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1.748 acres · 37%
- Apartment buildings1.607 acres · 34%
- Parks and playgrounds0.938 acres · 20%
- Shops and offices0.396 acres · 8%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningISI marked
- KitchenMarble/vitrified tiles/ porcelein tiles
- Lifts4 no of flates & 4 lifts
- FloorsMarble/vitrified tiles/ porcelein tiles
- WallsAcrylic emulsion paint/OBD
- BathroomsAs per indian standard/ hindware/ parryware equivalent
- WindowsAluminum frames with toughened glass
- Main doorFlush panel door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.1 km
- Delhi–Gurugram–SNB RRTS2.3 km
- Sohna Elevated Corridor (NH-248A)7.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Spaze Towers | Same sector | — | — | — |
No photo of the project on file yet | SS Group | Same sector | — | — | 31 Jul 2024 |
GRATITUDE 84No photo on file yet | Lamose Infra | Same sector | — | — | 30 Apr 2032 |
DevaanNo photo on file yet | Pivotal Infrastructure | Same sector | — | — | — |
No photo of the project on file yet | SS Group | Same sector | — | — | 31 Dec 2023 |
No photo of the project on file yet | SS Group | Same sector | — | — | 29 Feb 2024 |
No photo of the project on file yet | SS Group | Same sector | — | — | 31 Mar 2026 |
| Ganga Realty | Same sector | Under construction | ₹14,000/sq ft | 23 Feb 2028 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is SIGNATUREGLOBAL TWIN TOWER DXP registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/866/598/2024/93. Valid to 30 May 2030.
The source ↗What is the possession timeline for SIGNATUREGLOBAL TWIN TOWER DXP?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 May 2030. Its registration runs to 30 May 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SIGNATUREGLOBAL TWIN TOWER DXP?From the records · Map pin and road lines, read 6 Sep 2026
SIGNATUREGLOBAL TWIN TOWER DXP is in Sector 84, Gurugram; the site address declared to HARERA is Village-Hayatpur, Sector-84, Gurugram, Haryana. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SIGNATUREGLOBAL TWIN TOWER DXP?From the records · HARERA, read 4 Nov 2026
SIGNATUREGLOBAL TWIN TOWER DXP is a Forever Buildtech project, registered by its company FOREVER BUILDTECH PRIVATE LIMITED.
The source ↗Forever Buildtech's projects and court recordThe records
What the registers hold for SIGNATUREGLOBAL TWIN TOWER DXP: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/866/598/2024/93: Registered. Valid to 30 May 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 49 OF 2024 is on the DTCP register, valid to 13 Mar 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 28 Aug 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
- Registration no.
- GGM/866/598/2024/93
- Registration valid till
- 30 May 2030
- Declared possession
- 30 May 2030
Declared by the promoter to HARERA
- Land area
- 4.6875 (Acre) (18,969.64 sq m)
- FAR
- 3.62 proposed of 3.5 permissible
- licence
- License No. 49 of 2024 Dated 14.03.2024
- Estimated project cost
- ₹1612.80 crore
- Cost of land
- ₹640.22 crore
- Building plans, declared approved
- 28 Aug 2024
- Construction to start
- 1 Nov 2024
- Completion declared for
- 30 May 2030
Declared inventory · 6 types
Declared inventory
- Apartment/Shops/Other Buildings · 77 units · 176.47 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 77 units · 138.88 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 158 units · 123.66 sq m carpet · 2 towers
- Apartment/Shops/Other Buildings · 59 units · 1,625.21 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 3 units · 562.621 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 9 units · 1,499.57 sq m carpet · 1 tower
Statutory approvals, as declared · 9
Statutory approvals, as declared
- I. AIRPORT HEIGHT CLEARANCE (AAI) — declared: already been obtained (26 Feb 2024)
- II. WATER ASSURANCE — declared: already been obtained (5 Jun 2024)
- III. SEWERAGE ASSURANCE — declared: already been obtained (5 Jun 2024)
- IV. STP ASSURANCE — declared: already been obtained (5 Jun 2024)
- V. POWER ASSURANCE — declared: already been obtained (11 Jun 2024)
- VI. ROAD ACCESS PERMISSION — declared: already been obtained (25 Jun 2024)
- VII. LICENSE — declared: already been obtained (14 Mar 2024)
- VIII. FOREST NOC — declared: already been obtained (14 May 2024)
- IX. BR-III — declared: already been obtained (28 Aug 2024)
On file with HARERA · 65 files
On file with HARERA (65)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
11 filesFloor plans
31 filesServices
Sewerage and drainage
1 fileWater supply
1 fileRoads
1 fileLandscape and green areas
1 fileService plans
4 filesApprovals and clearances
DTCP licence
1 fileLand records
Land records
2 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
2 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
49 OF 2024 · FOREVER BUILDTECH PVT. LTD. · GURGAON-MANESAR
Licence valid to 13 Mar 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Aug 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
49 OF 2024: 10 parcels, 4.6875 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.
The licence register prints the same licensed area, 4.6875 acres.
- 65//1/1/21 kanal 1 marla
- 65//108 kanal
- 65//118 kanal
- 65//128 kanal
Show the other 6 parcels
- 65//20/22 kanal
- 65//9/22 kanal 13 marla
- 66//15/2/14 kanal 11 marla
- 66//6/1/2/22 marla
- 66//6/2/22 kanal 13 marla
- 66//6/410 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 65//1/1/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
11 filesFloor plans
31 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3039 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Forever Buildtech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.