Habitat
by Prime Infradevelopers · Sector 99A, Gurugram-Manesar
Not on our price list yet
Possession 30 Nov 2019 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 99A, Gurugram-Manesar1.1 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- PRIME INFRADEVELOPES PRIVATE LIMITEDthe company that filed it, for Prime Infradevelopers
- 28 Jul 2017Registered with HARERAHARERA, read 5 Nov 2026
- 30 Nov 2019Possession, as declareddeclared to HARERA, read 5 Nov 2026
- 22 Jan 2021Registration valid toHARERA, read 5 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 3,000 sq ft and above4,822 sq ft816
Carpet area per home, as declared to HARERA (read 5 Nov 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings5,582 m² · 23%
- Roads4,722 m² · 20%
- Green belts3,907 m² · 16%
- Other uses3,834 m² · 16%
- Parks and playgrounds3,240 m² · 13%
- Parking2,554 m² · 11%
- Electricity sub-station265 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 5 Nov 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC
- KitchenStone counter top with 2FEET high ceramic tiles above the counter and ceramic tile on floor 396 X 396 MM.
- Kitchen appliancesHob and HOOD
- LiftsTotal 17 NOS lifts , 07 are stretcher lifts and 10 are passenger lifts.
- FloorsImported stone flooring in living & dinning, wooden flooring in bedrooms and tile in toilet, kitchen, utility area and balcony.
- WallsInternal paint - plastic emulsion, OBD and white WASH. tower external walls - stone cladding up to 1ST floor LVL. & exterior emulsion paint on remaining areas.
- BathroomsISI marked CP fittings and fixtures.
- WindowsUPVC glazed window.
The developer’s specifications in the HARERA application, declared to HARERA, read 5 Nov 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.1 km
- Delhi–Gurugram–SNB RRTS6.0 km
- Sohna Elevated Corridor (NH-248A)7.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
HABITAT PRIMENo photo on file yet | Prime Infradevelopers | 0.1 km | — | — | 24 Nov 2025 |
No photo of the project on file yet | Raheja Developers | 0.3 km | — | — | 27 Aug 2022 |
YASHIKA GREEN SQUARENo photo on file yet | Dishita Infra | 0.3 km | — | — | 31 Jan 2028 |
No photo of the project on file yet | Raheja Developers | 0.3 km | — | — | 27 Aug 2022 |
No photo of the project on file yet | Raheja Developers | 0.3 km | — | — | 27 Aug 2022 |
No photo of the project on file yet | Raheja Developers | 0.3 km | — | — | 31 Dec 2022 |
No photo of the project on file yet | ATS Realworth | 0.5 km | — | ₹12,000/sq ft | 27 Nov 2028 |
ATS GRANDSTAND PHASE-2No photo on file yet | Homekraft Infra | 0.5 km | — | — | 30 Jun 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Habitat registered with HARERA?From the records · HARERA, read 5 Nov 2026
HARERA lists it as 27 OF 2017, registered on 28 Jul 2017. Ended 22 Jan 2021. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Habitat?From the records · HARERA, read 5 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Nov 2019. Its registration runs to 22 Jan 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Habitat?From the records · Map pin and road lines, read 6 Sep 2026
Habitat is in Sector 99A, Gurugram-Manesar; the site address declared to HARERA is Sector-99a, Gurugram. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Habitat?From the records · HARERA, read 5 Nov 2026
Habitat is a Prime Infradevelopers project, registered by its company PRIME INFRADEVELOPES PRIVATE LIMITED.
The source ↗Prime Infradevelopers's projects and court recordThe records
What the registers hold for Habitat: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 27 OF 2017: Registration expired. Ended 22 Jan 2021.HARERA, read 5 Nov 2026 · See it on HARERA ↗
- Land licence 21 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 10 Jan 2020.DTCP, read 3 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
- Registration no.
- 27 OF 2017
- Registration date
- 28 Jul 2017
- Registration valid till
- 22 Jan 2021
- Declared possession
- 30 Nov 2019
Declared by the promoter to HARERA
- Land area
- 5.95625 (Acre) (24,104.09 sq m)
- FAR
- the application prints 100, which is not a ratio
- licence
- 21 of 2014
- Estimated project cost
- ₹136.20 crore
- Cost of land
- ₹32.20 crore
- Completion declared for
- 30 Nov 2019
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 816 units · 448 sq m carpet · one flat
Statutory approvals, as declared · 10
Statutory approvals, as declared
- I. LICENSE NO. 21 OF 2014 — declared: already been obtained (11 Jun 2014)
- II. FOREST CLEARANCE — declared: already been obtained (28 Nov 2014)
- III. ARAVALI CLEARANCE — declared: already been obtained (11 Dec 2014)
- IV. NOC FROM AIRPORT AUTHORITY OF INDIA — declared: already been obtained (1 Dec 2014)
- V. POWER ASSURANCE — declared: already been obtained (18 Nov 2014)
- VI. WATER ASSURANCE — declared: already been obtained (19 Oct 2015)
- VII. APPROVAL OF BUILDING PLANS — declared: already been obtained (24 Dec 2014)
- VIII. FIRE SCHEME APPROVAL — declared: already been obtained (27 May 2015)
- IX. ENVIRONMENT CLEARANCE — declared: already been obtained (20 Jan 2016)
- X. CONSENT TO ESTABLISH — declared: already been obtained (19 Feb 2016)
On file with HARERA · 22 files
On file with HARERA (22)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Water supply
1 fileElectricity
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
3 filesSales papers
Payment plan
1 fileAllotment and sale agreements
3 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
21 OF 2014 · Prime Infradevelopers Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 10 Jan 2020
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Dec 2019 · read 5 Nov 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 5 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
21 OF 2014: 7 parcels, 5.9562 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.
The licence register prints the same licensed area, 5.96 acres.
- 112//18 kanal
- 112//108 kanal
- 112//117 kanal 17 marla
- 112//127 kanal 17 marla
Show the other 3 parcels
- 112//13/15 kanal 10 marla
- 112//2/12 kanal 10 marla
- 112//9/27 kanal 18 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 112//1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,000 per sq ft
Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 filePayment plan
1 fileAmong the uploads Bhumiq read from HARERA's page on 5 Nov 2026 (22 in all), none is a floor plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/953 · read 5 Nov 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Prime Infradevelopers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.