HABITAT PRIME
by Prime Infradevelopers · Sector 99A, Gurugram
Not on our price list yet
Possession 24 Nov 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
- Carpet area
- about 628 sq ft
In m²
about 58.4 m², the average flat, as declared - Registered by
- PRIME INFRADEVELOPERS PVT LTDthe company that filed it, for Prime Infradevelopers
- 24 Feb 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 24 Nov 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 24 Nov 2026Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking2.105 acres · 33%
- Green belts1.582 acres · 24%
- Apartment buildings1.142 acres · 18%
- Parks and playgrounds0.881 acres · 14%
- Other uses0.462 acres · 7%
- Roads0.261 acres · 4%
- Electricity sub-station0.036 acres · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenStone counter – top with 2 FEET tiles above the counter. the floors are finished with tiles
- Lifts21 lifts, in which 11 are passenger and remaining 10 are stretcher lift
- FloorsTiles – 600X600 vitrified and 300X300 ceramic
- WallsExternal walls – APEX/ weather exterior texture emulsion paint and internal walls – whitewash/ colour WASH
- BathroomsCP fittings and fixtures ISI marked
- WindowsMS/ aluminium windows with glass 4/5/6 MM.
- Main doorMS/ PVC door frame & flush door shutters are finished with enamel paint
- Electrical fittingsISI marked fittings
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.1 km
- Delhi–Gurugram–SNB RRTS6.0 km
- Sohna Elevated Corridor (NH-248A)8.2 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Alton Buildtech India | Same sector | — | — | 4 Dec 2027 | |
VANYA CITYNo photo on file yet | Betterchoice Realtors | Same sector | — | — | 31 Oct 2025 |
No photo of the project on file yet | Lightstone Developers India | Same sector | — | — | 25 Jan 2027 |
VIENNA GREENSNo photo on file yet | Skywhales Developers | Same sector | — | — | 31 Jul 2025 |
ATS GRANDSTAND PHASE-2No photo on file yet | Homekraft Infra | Same sector | — | — | 30 Jun 2031 |
YASHIKA GREEN SQUARENo photo on file yet | Dishita Infra | Same sector | — | — | 31 Jan 2028 |
SPITI GREENWOOD ESTATENo photo on file yet | Spiti Township | Same sector | — | — | 23 Aug 2028 |
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is HABITAT PRIME registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/458/190/2021/26. Valid to 24 Nov 2026.
The source ↗What is the possession timeline for HABITAT PRIME?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 24 Nov 2025. Its registration runs to 24 Nov 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around HABITAT PRIME?From the records · Map pin and road lines, read 6 Sep 2026
HABITAT PRIME is in Sector 99A, Gurugram; the site address declared to HARERA is Village Dhankot, Sec-99a, Gurugram. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building HABITAT PRIME?From the records · HARERA, read 4 Nov 2026
HABITAT PRIME is a Prime Infradevelopers project, registered by its company PRIME INFRADEVELOPERS PVT LTD.
The source ↗Prime Infradevelopers's projects and court recordThe records
What the registers hold for HABITAT PRIME: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/458/190/2021/26: Registered. Valid to 24 Nov 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 38 OF 2020 is on the DTCP register, valid to 24 Nov 2027.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 24 Feb 2021, building plans 24 Feb 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration ends soon
Valid to 24 Nov 2026. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 59 HARERA files, with the dates we read them
- Registration no.
- GGM/458/190/2021/26
- Registration valid till
- 24 Nov 2026
- Declared possession
- 24 Nov 2025
Declared by the promoter to HARERA
- Land area
- 6.46875 (Acre) (26,178.1 sq m)
- FAR
- 2.4 proposed of 2.4 permissible
- licence
- 38 of 2020 dated 26.11.2020
- Estimated project cost
- ₹192.66 crore
- Cost of land
- ₹35.52 crore
- Layout plan, declared approved (field 5a)
- 24 Feb 2021
- Building plans, declared approved
- 24 Feb 2021
- Construction to start
- 1 Oct 2021
- Completion declared for
- 24 Nov 2025
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 844 units · 49,251.708 sq m carpet · 8 towers · total for 844 flats, about 58.4 m² each
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. POWER ASSURANCE — declared: already been obtained (19 Feb 2021)
- II. FOREST CLEARANCE — declared: already been obtained (28 Nov 2014)
- III. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (24 Feb 2021)
- IV. WATER ASSURANCE — declared: already been obtained (11 Dec 2020)
- V. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (5 Jan 2021)
- VI. LICENSE NO. 38 OF 2020 — declared: already been obtained (26 Nov 2020)
- VII. SERVICE PLAN ESTIMATE — declared: applied for but yet to receive (1 Mar 2021)
- VIII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (22 Dec 2020)
On file with HARERA · 59 files
On file with HARERA (59)
Plans
Site plan
4 filesLayout plan
3 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
13 filesFloor plans
4 filesServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileRoads
1 fileService plans
5 filesApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
5 filesFire safety
2 filesLand records
Land records
6 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
38 OF 2020 · PRIME INFRADEVELOPERS PVT. LTD. · GURGAON-MANESAR
Licence valid to 24 Nov 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Mar 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
38 OF 2020: 10 parcels, 6.4687 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.
The licence register prints the same licensed area, 6.4688 acres.
- 112//11 min2 marla
- 112//12 min2 marla
- 112//17/21 kanal 11 marla
- 112//18/27 kanal 18 marla
Show the other 6 parcels
- 112//198 kanal
- 112//208 kanal
- 112//218 kanal
- 112//22 min7 kanal 19 marla
- 112//23 min6 kanal
- 112//24/1 min4 kanal 2 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 112//11 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Habitat Prime”, by M/s Prime Infra Developers (P) Ltd, code Gurgaon-0721-001929, approved 2021.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
3 filesBuilding plans
13 filesFloor plans
4 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (59 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1540 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Prime Infradevelopers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.