HABITAT PRIME

by Prime Infradevelopers · Sector 99A, Gurugram

Not on our price list yet

Possession 24 Nov 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
Carpet area
about 628 sq ft
In m²about 58.4 m², the average flat, as declared
Registered by
PRIME INFRADEVELOPERS PVT LTDthe company that filed it, for Prime Infradevelopers
Timeline
  1. 24 Feb 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Nov 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 24 Nov 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.469 acres in all, by use
  • Parking2.105 acres · 33%
  • Green belts1.582 acres · 24%
  • Apartment buildings1.142 acres · 18%
  • Parks and playgrounds0.881 acres · 14%
  • Other uses0.462 acres · 7%
  • Roads0.261 acres · 4%
  • Electricity sub-station0.036 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter – top with 2 FEET tiles above the counter. the floors are finished with tiles
  • Lifts21 lifts, in which 11 are passenger and remaining 10 are stretcher lift
  • FloorsTiles – 600X600 vitrified and 300X300 ceramic
  • WallsExternal walls – APEX/ weather exterior texture emulsion paint and internal walls – whitewash/ colour WASH
  • BathroomsCP fittings and fixtures ISI marked
  • WindowsMS/ aluminium windows with glass 4/5/6 MM.
  • Main doorMS/ PVC door frame & flush door shutters are finished with enamel paint
  • Electrical fittingsISI marked fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99A, GurugramSector 99A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)8.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is HABITAT PRIME registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/458/190/2021/26. Valid to 24 Nov 2026.

The source ↗
What is the possession timeline for HABITAT PRIME?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Nov 2025. Its registration runs to 24 Nov 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around HABITAT PRIME?From the records · Map pin and road lines, read 6 Sep 2026

HABITAT PRIME is in Sector 99A, Gurugram; the site address declared to HARERA is Village Dhankot, Sec-99a, Gurugram. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building HABITAT PRIME?From the records · HARERA, read 4 Nov 2026

HABITAT PRIME is a Prime Infradevelopers project, registered by its company PRIME INFRADEVELOPERS PVT LTD.

The source ↗Prime Infradevelopers's projects and court record

The records

What the registers hold for HABITAT PRIME: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/458/190/2021/26: Registered. Valid to 24 Nov 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 38 OF 2020 is on the DTCP register, valid to 24 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 24 Feb 2021, building plans 24 Feb 2021.Declared to HARERA, read 29 Oct 2026
The court record of Prime Infradevelopers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 24 Nov 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 59 HARERA files, with the dates we read them
Registration no.
GGM/458/190/2021/26
Registration valid till
24 Nov 2026
Declared possession
24 Nov 2025

Declared by the promoter to HARERA

Land area
6.46875 (Acre) (26,178.1 sq m)
FAR
2.4 proposed of 2.4 permissible
licence
38 of 2020 dated 26.11.2020
Estimated project cost
₹192.66 crore
Cost of land
₹35.52 crore
Layout plan, declared approved (field 5a)
24 Feb 2021
Building plans, declared approved
24 Feb 2021
Construction to start
1 Oct 2021
Completion declared for
24 Nov 2025
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 844 units · 49,251.708 sq m carpet · 8 towers · total for 844 flats, about 58.4 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. POWER ASSURANCE — declared: already been obtained (19 Feb 2021)
  • II. FOREST CLEARANCE — declared: already been obtained (28 Nov 2014)
  • III. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (24 Feb 2021)
  • IV. WATER ASSURANCE — declared: already been obtained (11 Dec 2020)
  • V. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (5 Jan 2021)
  • VI. LICENSE NO. 38 OF 2020 — declared: already been obtained (26 Nov 2020)
  • VII. SERVICE PLAN ESTIMATE — declared: applied for but yet to receive (1 Mar 2021)
  • VIII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (22 Dec 2020)
On file with HARERA · 59 files

On file with HARERA (59)

Plans

Site plan

4 files
Site Plan Green Area Layout Plan & Area Calculation22 Jun 2021Superimposed Plan RERA22 Jun 2021Approved Site Plan22 Jun 2021Superimposed Plan22 Mar 2021

Layout plan

3 files
Latest Layout Plan22 Jun 2021Parking Layout Pla & Area Calculations22 Mar 2021Plan Master Layout Plan22 Mar 2021

Zoning plan

1 file
Zoning Plan2 Mar 2021

Demarcation plan

1 file
Demarcation Plan22 Mar 2021

Building plans

13 files
Community Hall Gaurd, Milk & Vegbooth Ess Block & Ht Meter Room-Plans,ele,sections & Area Statement22 Jun 2021BR III Habitat Prime22 Jun 2021Structural Typical Plan 222 Jun 2021

Floor plans

4 files
Tower A1,A2,A4,A8 Plans & Area Statement22 Jun 2021Tower A3,A7 Plans & Area Statement22 Jun 2021Tower A5 Plans & Area Statement22 Jun 2021Tower A6 Plans & Area Statement22 Jun 2021

Services

Sewerage and drainage

2 files
Storm Water Se22 Jun 2021Sewerage Se22 Jun 2021

Water supply

1 file
Water Supply Se22 Jun 2021

Electricity

1 file
Electrification Supply Approval22 Jun 2021

Roads

1 file
Road Se22 Jun 2021

Service plans

5 files
Service Plan Estimate22 Jun 2021Service Plans on the Layout22 Jun 2021Solid Waste Management Plan22 Jun 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded12 Dec 2025

DTCP licence

5 files
LC-IV (A), Bilateral Agreement22 Mar 2021LC-IV Agreement22 Mar 2021License 38 of 202022 Mar 2021

Fire safety

2 files
Fire Scheme Approval Habitat Prime22 Jun 2021Fire Fighting Plan Se22 Jun 2021

Land records

Land records

6 files
Aks Sizra22 Mar 2021Jamabandi22 Mar 2021Revenue Record Entry of Licence and Collaboration22 Mar 2021

Money

Accounts and finance

5 files
Cash Flow Statement22 Jun 2021Pipl Balance Sheet 17-1822 Mar 2021Pipl Balance Sheet 19-2022 Mar 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Mar 2021

HARERA’s orders

HARERA’s orders

1 file
Extension No. 42 of 2025 dated 16.10.202516 Oct 2025

Other filings

Other filings

2 files
Commercial Block Plans & Area Statement22 Jun 2021Commercial Block Plans & Area Statement22 Jun 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

38 OF 2020 · PRIME INFRADEVELOPERS PVT. LTD. · GURGAON-MANESAR

Licence valid to 24 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Mar 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

38 OF 2020: 10 parcels, 6.4687 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.

The licence register prints the same licensed area, 6.4688 acres.

  • 112//11 min2 marla
  • 112//12 min2 marla
  • 112//17/21 kanal 11 marla
  • 112//18/27 kanal 18 marla
Show the other 6 parcels
  • 112//198 kanal
  • 112//208 kanal
  • 112//218 kanal
  • 112//22 min7 kanal 19 marla
  • 112//23 min6 kanal
  • 112//24/1 min4 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 112//11 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Habitat Prime”, by M/s Prime Infra Developers (P) Ltd, code Gurgaon-0721-001929, approved 2021.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan Green Area Layout Plan & Area Calculation22 Jun 2021Superimposed Plan RERA22 Jun 2021Approved Site Plan22 Jun 2021Superimposed Plan22 Mar 2021

Layout plan

3 files
Latest Layout Plan22 Jun 2021Parking Layout Pla & Area Calculations22 Mar 2021Plan Master Layout Plan22 Mar 2021

Building plans

13 files
Community Hall Gaurd, Milk & Vegbooth Ess Block & Ht Meter Room-Plans,ele,sections & Area Statement22 Jun 2021BR III Habitat Prime22 Jun 2021Structural Typical Plan 222 Jun 2021Tower A1,A2,A4,A8 Elevations22 Jun 2021Tower A3,A7 Elevations22 Jun 2021Tower A5 Elevations22 Jun 2021

Floor plans

4 files
Tower A1,A2,A4,A8 Plans & Area Statement22 Jun 2021Tower A3,A7 Plans & Area Statement22 Jun 2021Tower A5 Plans & Area Statement22 Jun 2021Tower A6 Plans & Area Statement22 Jun 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (59 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1540 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Prime Infradevelopers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.