IMPERIAL ESTATE
by Pyramid Infratech · Sector 70A, Gurugram
Not on our price list yet
Possession 20 Dec 2026 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 70A, Gurugram2.6 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- PYRAMID INFRATECH PVT LTDthe company that filed it, for Pyramid Infratech
- 31 Dec 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 20 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)2.6 km
- Dwarka ExpresswayOpen, 17 Aug 20253.9 km
- Delhi–Gurugram–SNB RRTS3.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 9
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Countrywide Promoters | Same sector | — | — | 27 Aug 2026 |
SEGGOVIASNo photo on file yet | Subh Housing (Gurgaon) | Same sector | — | — | 30 Jun 2032 |
THE RESIDENCES THREE SIXTYNo photo on file yet | Capital Heights | Same sector | — | — | 31 Dec 2025 |
| Countrywide Promoters | Same sector | — | — | 30 Jun 2022 | |
| BPTP | Same sector | — | — | 31 Dec 2032 | |
M3M ESCALANo photo on file yet | Haamid Real Estate | Same sector | — | — | — |
No photo of the project on file yet | Countrywide Promoters | Same sector | — | — | 30 Nov 2028 |
No photo of the project on file yet | BPTP | Same sector | — | — | 31 Dec 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is IMPERIAL ESTATE registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/559/291/2022/34. Valid to 20 Dec 2026.
The source ↗What is the possession timeline for IMPERIAL ESTATE?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 20 Dec 2026. Its registration runs to 20 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around IMPERIAL ESTATE?From the records · Map pin and road lines, read 6 Sep 2026
IMPERIAL ESTATE is in Sector 70A, Gurugram; the site address declared to HARERA is Sector- 70 A,. In a straight line it is about 2.6 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Dwarka Expressway and 3.9 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building IMPERIAL ESTATE?From the records · HARERA, read 4 Nov 2026
IMPERIAL ESTATE is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT LTD.
The source ↗Pyramid Infratech's projects and court recordThe records
What the registers hold for IMPERIAL ESTATE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/559/291/2022/34: Registered. Valid to 20 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 120 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 23 Dec 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 31 Dec 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
- Registration no.
- GGM/559/291/2022/34
- Registration valid till
- 20 Dec 2026
- Declared possession
- 20 Dec 2026
Declared by the promoter to HARERA
- Land area
- 5.38125 (Acre) (21,777.15 sq m)
- FAR
- 0 proposed of 0 permissible
- licence
- 120 OF 2021 DATED 24/12/2021
- Estimated project cost
- ₹84.35 crore
- Cost of land
- ₹28.33 crore
- Layout plan, declared approved (field 5a)
- 31 Dec 2021; Part E of the same form gives 23 Dec 2021
- Construction to start
- 15 Dec 2022
- Completion declared for
- 20 Dec 2026
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. LICENSE APPROVAL — declared: already been obtained (24 Dec 2021)
- II. ZONING PLAN APPROVAL — declared: already been obtained (24 Mar 2022)
- III. APPROVED LAYOUT PLAN — declared: already been obtained (23 Dec 2021)
- IV. FOREST NOC — declared: already been obtained (26 Jun 2021)
- V. WATER SUPPLY — declared: already been obtained (7 Jan 2022)
- VI. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (5 Jan 2022)
- VII. SERVICE PLAN ESTIMATES — declared: already been obtained (16 May 2022)
On file with HARERA · 43 files
On file with HARERA (43)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
2 filesBuilding plans
2 filesServices
Service plans
2 filesApprovals and clearances
Completion certificate (CC)
1 fileDTCP licence
4 filesOther NOCs and clearances
5 filesLand records
Land records
8 filesMoney
Accounts and finance
5 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
5 filesCompany papers
3 filesOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
120 OF 2021 · HOME SURPRISE BUILDERS LLP · GURGAON-MANESAR
Licence valid to 23 Dec 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
120 OF 2021: 13 parcels, 5.0438 acres in all, in Palda (hadbast 164), tehsil Badshahpur.
The licence register prints the same licensed area, 5.0438 acres.
- 10//22/2/1/15 marla
- 10//22/2/22 kanal 14 marla
- 10//23/1/1/212 marla
- 10//23/1/211 marla
Show the other 9 parcels
- 10//24/1/21 kanal 3 marla
- 18//28 kanal
- 18//38 kanal
- 18//4/14 kanal 13 marla
- 18//4/23 kanal 7 marla
- 18//5/16 kanal 4 marla
- 18//6/11 kanal 16 marla
- 18//7/1/11 kanal
- 18//7/1/22 kanal 2 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 10//22/2/1/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Imperial Estate”, by M/s Pyramid Infratech Pvt. Ltd., code Gurgaon-0822-002864, approved 2022.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1911 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pyramid Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

