Skip to content

IMPERIAL ESTATE

by Pyramid Infratech · Sector 70A, Gurugram

Not on our price list yet

Possession 20 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70A, Gurugram2.6 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
PYRAMID INFRATECH PVT LTDthe company that filed it, for Pyramid Infratech
Timeline
  1. 31 Dec 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 20 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70A, GurugramSector 70A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.6 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.9 km
  • Delhi–Gurugram–SNB RRTS3.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is IMPERIAL ESTATE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/559/291/2022/34. Valid to 20 Dec 2026.

The source ↗
What is the possession timeline for IMPERIAL ESTATE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 20 Dec 2026. Its registration runs to 20 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around IMPERIAL ESTATE?From the records · Map pin and road lines, read 6 Sep 2026

IMPERIAL ESTATE is in Sector 70A, Gurugram; the site address declared to HARERA is Sector- 70 A,. In a straight line it is about 2.6 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Dwarka Expressway and 3.9 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building IMPERIAL ESTATE?From the records · HARERA, read 4 Nov 2026

IMPERIAL ESTATE is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT LTD.

The source ↗Pyramid Infratech's projects and court record

The records

What the registers hold for IMPERIAL ESTATE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/559/291/2022/34: Registered. Valid to 20 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 120 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 23 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 31 Dec 2021.Declared to HARERA, read 29 Oct 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 20 Dec 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 120 OF 2021 ends soon

    Named in this project’s application. Valid to 23 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
GGM/559/291/2022/34
Registration valid till
20 Dec 2026
Declared possession
20 Dec 2026

Declared by the promoter to HARERA

Land area
5.38125 (Acre) (21,777.15 sq m)
FAR
0 proposed of 0 permissible
licence
120 OF 2021 DATED 24/12/2021
Estimated project cost
₹84.35 crore
Cost of land
₹28.33 crore
Layout plan, declared approved (field 5a)
31 Dec 2021; Part E of the same form gives 23 Dec 2021
Construction to start
15 Dec 2022
Completion declared for
20 Dec 2026
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (24 Dec 2021)
  • II. ZONING PLAN APPROVAL — declared: already been obtained (24 Mar 2022)
  • III. APPROVED LAYOUT PLAN — declared: already been obtained (23 Dec 2021)
  • IV. FOREST NOC — declared: already been obtained (26 Jun 2021)
  • V. WATER SUPPLY — declared: already been obtained (7 Jan 2022)
  • VI. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (5 Jan 2022)
  • VII. SERVICE PLAN ESTIMATES — declared: already been obtained (16 May 2022)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

1 file
Approved Site Plan31 Mar 2022

Layout plan

1 file
Latest Layout Plan31 Mar 2022

Zoning plan

1 file
Zoning Plan31 Mar 2022

Demarcation plan

2 files
Demarcation Plan31 Mar 2022Superimposed Demarcation Plan31 Mar 2022

Building plans

2 files
Approved Building Plans, Full Set31 Mar 2022BR31 Mar 2022

Services

Service plans

2 files
Approved Service Estimate & Design Report19 May 2022Service Plans on the Layout31 Mar 2022

Approvals and clearances

Completion certificate (CC)

1 file
CC uploaded4 Jun 2026

DTCP licence

4 files
Licence Copy with Land Schedule31 Mar 2022LC IV31 Mar 2022Licence31 Mar 2022LOI31 Mar 2022

Other NOCs and clearances

5 files
Drinking Water NOC31 Mar 2022NOC Forest31 Mar 2022NOC DHBVN31 Mar 2022

Land records

Land records

8 files
Revenue Record Entry of Licence and Collaboration31 Mar 2022Aks Sizra Plan31 Mar 2022Collaboration Agreement31 Mar 2022

Money

Accounts and finance

5 files
Revised Project Report Imperial Estate19 May 2022Cash Flow Statement1 Apr 2022Non-Default Certificate from a CA1 Apr 2022

Timeline and progress

Construction schedule

1 file
PERT Chart1 Apr 2022

The promoter’s papers

Declarations and affidavits

5 files
Revised Promoters Affidavit19 May 2022The Promoter’s Declaration on Affidavit1 Apr 2022Affidavit Tree Cutting1 Apr 2022

Company papers

3 files
GST Pyramid31 Mar 2022Company TAN31 Mar 2022MOA31 Mar 2022

Other filings

Other filings

2 files
Project Proponents1 Apr 2022Dpi1 Apr 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

120 OF 2021 · HOME SURPRISE BUILDERS LLP · GURGAON-MANESAR

Licence valid to 23 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

120 OF 2021: 13 parcels, 5.0438 acres in all, in Palda (hadbast 164), tehsil Badshahpur.

The licence register prints the same licensed area, 5.0438 acres.

  • 10//22/2/1/15 marla
  • 10//22/2/22 kanal 14 marla
  • 10//23/1/1/212 marla
  • 10//23/1/211 marla
Show the other 9 parcels
  • 10//24/1/21 kanal 3 marla
  • 18//28 kanal
  • 18//38 kanal
  • 18//4/14 kanal 13 marla
  • 18//4/23 kanal 7 marla
  • 18//5/16 kanal 4 marla
  • 18//6/11 kanal 16 marla
  • 18//7/1/11 kanal
  • 18//7/1/22 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//22/2/1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Imperial Estate”, by M/s Pyramid Infratech Pvt. Ltd., code Gurgaon-0822-002864, approved 2022.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan31 Mar 2022

Layout plan

1 file
Latest Layout Plan31 Mar 2022

Building plans

2 files
Approved Building Plans, Full Set31 Mar 2022BR31 Mar 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1911 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.