Skip to content

BPTP GREEN OAKS BOULEVARD

by BPTP · Sector 70A, Gurugram

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70A, Gurugram2.6 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
277–555 sq ft
In m²about 26–52 m², as declared
Registered by
BPTP LIMITEDthe company that filed it, for BPTP
Timeline
  1. 4 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

27homes, 277 to 555 sq ft of carpet area
  • Under 1,000 sq ft277–555 sq ft27

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0 m² in all, by use
  • Pavements0 m² · 55%
  • Apartment buildings0 m² · 45%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts4 NOS. (1750X1850)
  • FloorsInternal tile - nitco-crema bellini tile external stone-nitco-giselle GREY, nitco-crema bella walkway – as/landscape
  • WallsExternal – 1.dulux rajkot farmhouse beige(60YY 75/108) with texture. 2. VOX fronto– SLAT panel walnut V black 3. FRP cornice finished same as wall scheme internal- 1. dulux RAL 9010 (PURE white)
  • BathroomsJaquar & aquiant
  • WindowsFrame SIZE-110X60 door quantity- 32 window quantity- 37
  • Water storageDomestic water – 2700 LTRS FIRE water tank – 25000 LTRS flushing water – 2700 LTRS

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70A, GurugramSector 70A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.6 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.9 km
  • Delhi–Gurugram–SNB RRTS3.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 10
  • Other register states: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is BPTP GREEN OAKS BOULEVARD registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1062/794/2026/34. Valid to 31 Dec 2032.

The source ↗
What is the possession timeline for BPTP GREEN OAKS BOULEVARD?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around BPTP GREEN OAKS BOULEVARD?From the records · Map pin and road lines, read 6 Sep 2026

BPTP GREEN OAKS BOULEVARD is in Sector 70A, Gurugram; the site address declared to HARERA is Sector 70a Gurugram. In a straight line it is about 2.6 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Dwarka Expressway and 3.9 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building BPTP GREEN OAKS BOULEVARD?From the records · HARERA, read 4 Nov 2026

BPTP GREEN OAKS BOULEVARD is a BPTP project, registered by its company BPTP LIMITED.

The source ↗BPTP's projects and court record

The records

What the registers hold for BPTP GREEN OAKS BOULEVARD: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1062/794/2026/34: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 61 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 27 Aug 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 4 Sep 2025.Declared to HARERA, read 29 Oct 2026
The court record of BPTP’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 61 OF 2021 lapsed

    Named in this project’s application. Valid to 27 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 47 HARERA files, with the dates we read them
Registration no.
GGM/1062/794/2026/34
Registration valid till
31 Dec 2032
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
0.328 (Sqr/mtrs)
FAR
1.13 proposed of 1.5 permissible
licence
61 of 2021
Estimated project cost
₹16.48 crore
Cost of land
₹0.96 crore
Building plans, declared approved
4 Sept 2025
Construction to start
1 Apr 2026
Completion declared for
31 Dec 2032
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 25.7 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 26.22 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 26.28 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 14 units · 26.56 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 3 units · 30.47 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 31.5 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 51.3 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 51.58 sq m carpet · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. ROADS — declared: already been obtained (23 Jan 2026)
  • II. WATER SUPPLY (ASSURANCE GRANTED) — declared: already been obtained (8 Oct 2021)
  • III. SEWAGE DISPOSAL (ASSURANCE GRANTED) — declared: already been obtained (28 Sept 2021)
  • IV. STORM WATER DRAINAGE (ASSURANCE GRANTED) — declared: already been obtained (29 Sept 2021)
  • V. ELECTRICAL LOAD — declared: already been obtained (8 Feb 2023)
  • VI. SITE PLAN — declared: already been obtained (4 Sept 2025)
  • VII. ZONING PLAN — declared: already been obtained (9 Feb 2023)
  • VIII. BUILDING PLAN — declared: already been obtained (4 Sept 2025)
  • IX. SERVICE PLAN ESTIMATES APPROVAL — declared: already been obtained (7 Nov 2024)
On file with HARERA · 47 files

On file with HARERA (47)

Plans

Site plan

1 file
Approved Site Plan29 May 2026

Layout plan

1 file
Latest Layout Plan29 May 2026

Zoning plan

2 files
Zoning Plan Approved Letter on 09.02.2023 (15.5625ACS)29 May 2026Zoning Plan20 Apr 2026

Building plans

5 files
Floor Plan- Second Floor and Terrace Plan29 May 2026Approved Building Plans, Full Set29 May 2026BR20 Apr 2026

Floor plans

1 file
Floor Plans (Gf and Ff)29 May 2026

Services

Sewerage and drainage

2 files
Storm Water Layout29 May 2026Sewerage Layout20 Apr 2026

Water supply

3 files
Water Supply Layout29 May 2026Water Domestic - Assurance29 May 2026Flushing Water Layout20 Apr 2026

Electricity

1 file
Electrical Approval Dtd 08.02.2023 for Ddjay Sec-70A20 Apr 2026

Roads

1 file
Road Layout20 Apr 2026

Service plans

3 files
Service Plans on the Layout29 May 2026PERT Chart Services20 Apr 2026Service Estimate Approval20 Apr 2026

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule29 May 2026Form LC-IV29 May 2026LOI 15.5625ACS20 Apr 2026

Fire safety

1 file
Fire Scheme Approval29 May 2026

Other NOCs and clearances

1 file
Forest NOC Bptp20 Apr 2026

Land records

Land records

4 files
Collaboration Agreement29 May 2026Land Title Search Report29 May 2026Non Encumberance Certificate29 May 2026Revenue Record Entry of Licence and Collaboration29 May 2026

Sales papers

Allotment and sale agreements

3 files
Draft Allotment Letter29 May 2026Draft Conveyance Deed29 May 2026Draft Agreement to Sale29 May 2026

Money

Accounts and finance

5 files
Demand Draft29 May 2026CA Certificate Networth29 May 2026CA Certificate Cost Boulevard (1)20 Apr 2026

Timeline and progress

Construction schedule

1 file
PERT Chart Construction (1)20 Apr 2026

The promoter’s papers

Declarations and affidavits

6 files
NCZ Undertaking29 May 2026The Promoter’s Declaration on Affidavit29 May 2026Wild Life Undertaking29 May 2026

Other filings

Other filings

3 files
DTCP Order Merger-Amalgamated Gurugram29 May 2026Completion Certiifcate (Residential Plotted Colony)29 May 2026Akshhizra20 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

61 OF 2021 · Countrywide Promoters Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 27 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Jan 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

61 OF 2021: 45 parcels, 15.5625 acres in all, in Palda (hadbast 164), tehsil Badshahpur.

The licence register prints the same licensed area, 15.5625 acres.

  • 19//17/21 kanal 11 marla
  • 19//258 kanal
  • 24//4/110 marla
  • 24//4/211 marla
Show the other 41 parcels
  • 24//54 kanal 19 marla
  • 25//1/16 kanal 11 marla
  • 25//1/27 marla
  • 25//2/14 kanal 19 marla
  • 25//2/22 kanal 1 marla
  • 25//87 marla
  • 19//247 kanal 18 marla
  • 17//23/1/25 marla
  • 17//23/22 kanal 8 marla
  • 17//24/13 kanal 8 marla
  • 18//19/19 marla
  • 18//23/12 kanal 19 marla
  • rectangle 18, kila 18min4 kanal 11 marla
  • 26//2/24 marla
  • 26//35 kanal 6 marla
  • 26//44 kanal 14 marla
  • 26//712 marla
  • 26//8/18 marla
  • 17//24/2/15 marla
  • 17//24/2/21 kanal 1 marla
  • 25//5/2/12 marla
  • 26//1/25 kanal 2 marla
  • 26//2/1/2/23 kanal 18 marla
  • 18//24/1/15 kanal 17 marla
  • 18//24/22 kanal
  • 18//25/1/12 kanal
  • 17//211 kanal 12 marla
  • 17//22/21 kanal 4 marla
  • 25//4/17 kanal 11 marla
  • 25//5/17 kanal 13 marla
  • 25//6/2/11 marla
  • 26//1/12 kanal 18 marla
  • 26//108 marla
  • 26//2/1/12 kanal 7 marla
  • 26//91 kanal 13 marla
  • 18//17/14 marla
  • 18//17/23 kanal 18 marla
  • 18//23/31 kanal
  • 18//24/1/23 marla
  • 18//25/2/15 kanal 8 marla
  • 25//35 kanal 7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 19//17/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 May 2026

Layout plan

1 file
Latest Layout Plan29 May 2026

Building plans

5 files
Floor Plan- Second Floor and Terrace Plan29 May 2026Approved Building Plans, Full Set29 May 2026BR20 Apr 2026BR III - Commercial 120 Apr 2026Elevation and Section Plan20 Apr 2026

Floor plans

1 file
Floor Plans (Gf and Ff)29 May 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (47 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3878 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on BPTP

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.