SEGGOVIAS
by Subh Housing (Gurgaon) · Sector 70A, Gurugram
Not on our price list yet
Possession 30 Jun 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 70A, Gurugram2.6 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- SUBH HOUSING (GURGAON) LLPthe company that filed it, for Subh Housing (Gurgaon)
- 23 Apr 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft360 sq ft2
- 1,000–1,500 sq ft1,014–1,021 sq ft124
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads0.631 acres · 41%
- Apartment buildings0.435 acres · 28%
- Parks and playgrounds0.424 acres · 28%
- Parking0.041 acres · 3%
- Electricity sub-station0.008 acres · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVariable RATE FLOW system.
- KitchenVitrified tile, full height windows- aluminium powder coated sections
- Kitchen appliancesSink, WASH basin, taps
- Lifts4 flats per floor, 3 lifts per floor
- FloorsVitrified tile, wooden flooring laminated, KOTA stone flooring , epoxy paint flooring
- WallsVitrified tile
- BathroomsVitrified tile
- WindowsFull height windows- aluminium powder coated sections
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)2.6 km
- Dwarka ExpresswayOpen, 17 Aug 20253.9 km
- Delhi–Gurugram–SNB RRTS3.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Countrywide Promoters | Same sector | — | — | 27 Aug 2026 |
THE RESIDENCES THREE SIXTYNo photo on file yet | Capital Heights | Same sector | — | — | 31 Dec 2025 |
| Countrywide Promoters | Same sector | — | — | 30 Jun 2022 | |
| BPTP | Same sector | — | — | 31 Dec 2032 | |
No photo of the project on file yet | Pyramid Infratech | Same sector | — | — | 20 Dec 2026 |
M3M ESCALANo photo on file yet | Haamid Real Estate | Same sector | — | — | — |
No photo of the project on file yet | Countrywide Promoters | Same sector | — | — | 30 Nov 2028 |
No photo of the project on file yet | BPTP | Same sector | — | — | 31 Dec 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is SEGGOVIAS registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/956/688/2025/59. Valid to 30 Jun 2032.
The source ↗What is the possession timeline for SEGGOVIAS?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2032. Its registration runs to 30 Jun 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SEGGOVIAS?From the records · Map pin and road lines, read 6 Sep 2026
SEGGOVIAS is in Sector 70A, Gurugram; the site address declared to HARERA is Sector 70a. In a straight line it is about 2.6 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Dwarka Expressway and 3.9 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SEGGOVIAS?From the records · HARERA, read 4 Nov 2026
SEGGOVIAS is a Subh Housing (Gurgaon) project, registered by its company SUBH HOUSING (GURGAON) LLP.
The source ↗Subh Housing (Gurgaon)'s projects and court recordThe records
What the registers hold for SEGGOVIAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/956/688/2025/59: Registered. Valid to 30 Jun 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 02 OF 2025 is on the DTCP register, valid to 7 Jan 2030.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 23 Apr 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
- Registration no.
- GGM/956/688/2025/59
- Registration valid till
- 30 Jun 2032
- Declared possession
- 30 Jun 2032
Declared by the promoter to HARERA
- Land area
- 1.57875 (Acre) (6,388.97 sq m)
- FAR
- 2.37 proposed of 2.37 permissible
- licence
- 02 OF 2025 DATED 08.01.2025, Memo no Endst No. LC/5272/JE(RK)/2025/906
- Estimated project cost
- ₹123.00 crore
- Cost of land
- ₹5.44 crore
- Building plans, declared approved
- 23 Apr 2025
- Construction to start
- 1 Jan 2026
- Completion declared for
- 30 Jun 2032
Declared inventory · 8 types
Declared inventory
- Apartment/Shops/Other Buildings · 64 units · 94.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 94.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 94.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 32 units · 94.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 94.25 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 20 units · 94.84 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 94.84 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 33.43 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (8 Jan 2025)
- II. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (10 Jan 2025)
- III. ASSURANCE FOR STORM WATER — declared: already been obtained (17 Jan 2025)
- IV. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (17 Jan 2025)
- V. HUDA CONSTRUCTION WATER — declared: already been obtained (17 Jan 2025)
- VI. ELECTRICAL LOAD — declared: already been obtained (30 Jan 2025)
- VII. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (25 Oct 2024)
- VIII. FOREST NOC — declared: already been obtained (16 Aug 2024)
- IX. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (23 Apr 2025)
- X. ENVIRONMENT CLEARANCE APPROVAL — declared: applied for but yet to receive (21 Jan 2025)
- XI. SERVICE PLANS AND ESTIMATES APPROVAL — declared: yet to file for approval
- XII. FIRE SCHEME APPROVAL — declared: yet to file for approval
On file with HARERA · 34 files
On file with HARERA (34)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileLandscape and green areas
1 fileService plans
1 fileApprovals and clearances
DTCP licence
3 filesEnvironment clearance
1 fileOther NOCs and clearances
2 filesLand records
Land records
7 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
4 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
02 OF 2025 · Subh Housing (Gurgaon) LLP · GURGAON-MANESAR
Licence valid to 7 Jan 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Apr 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
02 OF 2025: 6 parcels, 1.5788 acres in all, in Palda (hadbast 164), tehsil Badshahpur.
The licence register prints the same licensed area, 1.5788 acres.
- rectangle 8, kila 25/2/1 min1 kanal 8 marla
- rectangle 20, kila 5/2/2 min0.00382 acres
- rectangle 20, kila 5/2/12 marla
- rectangle 9, kila 218 kanal
Show the other 2 parcels
- rectangle 19, kila 1/118 marla
- rectangle 8, kila 25/2/22 kanal 4 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 8, kila 25/2/1 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3421 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Subh Housing (Gurgaon)
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.


