₹35,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Dec 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 58, Gurugram6.5 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
338–5,933 sq ft
In m²about 31–551 m², as declared
Asking rate
₹35,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
OBEROI REALTY LIMITEDthe company that filed it, for Oberoi
Timeline
  1. 19 May 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

132homes, 338 to 5,933 sq ft of carpet area
  • Under 1,000 sq ft338–342 sq ft64
  • 2,500–3,000 sq ft2,803–2,908 sq ft64
  • 3,000 sq ft and above5,196–5,933 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,870 m² in all, by use
  • Roads2,823 m² · 58%
  • Green belts1,006 m² · 21%
  • Apartment buildings998 m² · 20%
  • Pavements43 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision for VRV system
  • Lifts8 NOS. of elevators from lower ground to all residential floors per tower and 1 lift for ground to basements per tower
  • FloorsBARE shell apartment - BASE coat of water proofing in sunken areas of the apartment
  • WindowsFixed windows with powder coated aluminium frame / full height sliding windows with powder coated aluminium frame.
  • Main doorWooden/MS door with FIRE rating as per norms
  • Electrical fittingsAs per specification of standard make
  • Water storageUnderground and overhead water tanks

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 58, GurugramSector 58, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)6.5 km
  • Delhi–Gurugram–SNB RRTS7.5 km
  • Dwarka ExpresswayOpen, 17 Aug 202511.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 6

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Oberoi Three Sixty North registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1069/801/2026/41. Valid to 31 Dec 2033.

The source ↗
What is the possession timeline for Oberoi Three Sixty North?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2033. Its registration runs to 31 Dec 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Oberoi Three Sixty North?From the records · Map pin and road lines, read 6 Sep 2026

Oberoi Three Sixty North is in Sector 58, Gurugram; the site address declared to HARERA is Village Ghata Sector 58, Gurugram. In a straight line it is about 6.5 km from Sohna Elevated Corridor (NH-248A), 7.5 km from Delhi–Gurugram–SNB RRTS and 11.6 km from Dwarka Expressway.

The source ↗
What does a home in Oberoi Three Sixty North cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹35,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Oberoi Three Sixty North: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1069/801/2026/41: Registered. Valid to 31 Dec 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 69 OF 2025 is on the DTCP register, valid to 11 May 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 19 May 2026.Declared to HARERA, read 29 Oct 2026
The court record of Oberoi’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 61 HARERA files, with the dates we read them
Registration no.
GGM/1069/801/2026/41
Registration valid till
31 Dec 2033
Declared possession
31 Dec 2033
Asking price (indicative)
₹35,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
1.20332 (Acre) (4,869.66 sq m)
FAR
3.67 proposed of 5 permissible
licence
69 of 2025 Dated 12.05.2025
Estimated project cost
₹458.24 crore
Cost of land
₹45.14 crore
Building plans, declared approved
19 May 2026
Construction to start
1 Jul 2026
Completion declared for
31 Dec 2033
Declared inventory · 8 types

Declared inventory

  • Apartment/Shops/Other Buildings · 2 units · 260.43 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 264.23 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 34 units · 266.52 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 24 units · 270.19 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 482.74 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 551.22 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 28 units · 31.8 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 36 units · 31.36 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. COD — declared: already been obtained (17 Jun 2025)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (3 Sept 2025)
  • III. FOREST NOC — declared: already been obtained (5 Mar 2025)
  • IV. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (7 May 2026)
  • V. ASSURANCE FOR STORM WATER — declared: already been obtained (24 Feb 2026)
  • VI. HUDA CONSTRUCTION — declared: already been obtained (24 Feb 2026)
  • VII. ELECTRICAL LOAD — declared: already been obtained (27 May 2026)
  • VIII. EC — declared: already been obtained (8 Jun 2026)
  • IX. ASSURANCE OF WATER SUPPLY — declared: already been obtained (27 Feb 2026)
  • X. BR-III — declared: already been obtained (19 May 2026)
  • XI. PHASING PLAN APPROVAL — declared: already been obtained (13 Apr 2026)
  • XII. LICENSE — declared: already been obtained (12 May 2025)
  • XIII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (4 Jun 2026)
  • XIV. SERVICE ESTIMATES & PLAN — declared: applied for but yet to receive (4 Jun 2026)
On file with HARERA · 61 files

On file with HARERA (61)

Plans

Site plan

6 files
P 04 Orl Site Plan Green Area Calculation26 Jun 2026Orl Site Plan Main26 Jun 2026Orl Site Plan26 Jun 2026

Layout plan

3 files
Phasing Plan9 May 2026Latest Layout Plan9 May 2026Letter of Phasing Plan9 May 2026

Zoning plan

1 file
Zoning Plan9 May 2026

Demarcation plan

1 file
Demarcation Plan9 May 2026

Building plans

5 files
21 Orl Ta 36th to 38th Floor with Terrace (Ph)26 Jun 202678 Orl Tower-A Elevation-1 & 326 Jun 202679 Orl Tower-A Elevation-2 & 426 Jun 2026

Floor plans

12 files
P 18 Orl Ta-02 2nd to 19th Floor26 Jun 202624 Orl Ta-08 34th to 38th Floor Carpet Area Calculation26 Jun 2026P 07 Orl Lgf+basement-1 Plan26 Jun 2026

Services

Sewerage and drainage

2 files
Assurance of Sewerage Connection24 Jun 2026Assurance for Storm Water9 May 2026

Water supply

1 file
Assurance of Water Supply19 May 2026

Electricity

2 files
Electrical Load24 Jun 2026Powerline Shifting11 May 2026

Service plans

4 files
P 08 Orl Lgf+basement-1 Plan Services26 Jun 202622 Orl Ta-06 Terrace Services26 Jun 2026Service Plan and Estimate Applied25 Jun 2026Service Plans on the Layout9 May 2026

Approvals and clearances

DTCP licence

5 files
COD Final Order Dated 1706202526 Jun 2026COD Final Order Dated 1706202526 Jun 2026LC-IV11 May 2026

Environment clearance

1 file
EC26 Jun 2026

Fire safety

1 file
Fire Scheme Applied25 Jun 2026

Other NOCs and clearances

3 files
Tree Cutting Permission24 Jun 2026Forest NOC9 May 2026AAI9 May 2026

Land records

Land records

6 files
NEC26 Jun 2026Revenue Record Entry of Licence and Collaboration24 Jun 2026Mutation9 May 2026

Sales papers

Allotment and sale agreements

1 file
Allotment Letter Tower A25 Jun 2026

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures24 Jun 2026Cash Flow Statement24 Jun 2026Non-Default Certificate from a CA19 May 2026

The promoter’s papers

Declarations and affidavits

4 files
Affidavit 4(2)(L)(D)25 Jun 2026NCZ Affidavit25 Jun 2026Bank Undertaking24 Jun 2026The Promoter’s Declaration on Affidavit24 Jun 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

69 OF 2025 · Oberoi Realty Ltd. · GURGAON-MANESAR

Licence valid to 11 May 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 May 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

69 OF 2025: 25 parcels, 14.8187 acres in all, in Ghata (hadbast 81), tehsil Wazirabad.

The licence register prints the same licensed area, 14.8188 acres.

  • 37//17/12 kanal 5 marla
  • 49//6/32 kanal 4 marla
  • 37//167 kanal 7 marla
  • 37//18/1/11 kanal 10 marla
Show the other 21 parcels
  • 37//18/2/115 marla
  • 37//19/1/1/19 marla
  • 37//258 kanal
  • 48//11/25 kanal 5 marla
  • 49//5/15 kanal 8 marla
  • 49//6/22 kanal 5 marla
  • 38//197 kanal 7 marla
  • 38//207 kanal 7 marla
  • 38//218 kanal
  • 38//228 kanal
  • 48//18 kanal
  • 48//108 kanal
  • 48//2/14 kanal 6 marla
  • 48//9/26 kanal 1 marla
  • 49//5/22 kanal 12 marla
  • 49//6/13 kanal 11 marla
  • 48//127 kanal 12 marla
  • 48//19/14 kanal
  • 48//20/15 kanal
  • 48//261 kanal 16 marla
  • 38//18/11 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Ghata (hadbast 81), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 37//17/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹9,900 per sq ft

Sector 58, collector rates effective 1 Apr 2026, Wazirabad tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

6 files
P 04 Orl Site Plan Green Area Calculation26 Jun 2026Orl Site Plan Main26 Jun 2026Orl Site Plan26 Jun 2026P 03 Orl Site Plan with Services26 Jun 2026Superimposed Plan25 Jun 2026Approved Site Plan24 Jun 2026

Layout plan

3 files
Phasing Plan9 May 2026Latest Layout Plan9 May 2026Letter of Phasing Plan9 May 2026

Building plans

5 files
21 Orl Ta 36th to 38th Floor with Terrace (Ph)26 Jun 202678 Orl Tower-A Elevation-1 & 326 Jun 202679 Orl Tower-A Elevation-2 & 426 Jun 202680 Orl Tower-A Section-1 & 226 Jun 2026Approved Building Plans, Full Set19 May 2026

Floor plans

12 files
P 18 Orl Ta-02 2nd to 19th Floor26 Jun 202624 Orl Ta-08 34th to 38th Floor Carpet Area Calculation26 Jun 2026P 07 Orl Lgf+basement-1 Plan26 Jun 202623 Orl Ta-07 2nd to 33rd Floor Carpet Area Calculation26 Jun 2026P Orl Basement-2 Plan26 Jun 2026P 20 Orl Ta-04 34th & 35th Floor (Duplex)26 Jun 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (61 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4123 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Oberoi

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹35,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.