Skip to content

SMARTWORLD ORCHARD

by Suposhaa Realcon · Sector 61, Gurugram

Not on our price list yet

Possession 31 Oct 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 61, Gurugram5.1 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
SUPOSHAA REALCON PRIVATE LIMITEDthe company that filed it, for Suposhaa Realcon
Timeline
  1. 16 Sep 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Oct 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20.609 acres in all, by use
  • Apartment buildings11.762 acres · 57%
  • Roads3.74 acres · 18%
  • Other usesas the form names them: Community, Vegetable, Under, Undetermined2.668 acres · 13%
  • Parks and playgrounds1.546 acres · 8%
  • Shops and offices0.782 acres · 4%
  • Sewage and waste treatment0.111 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 61, GurugramSector 61, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)5.1 km
  • Delhi–Gurugram–SNB RRTS7.0 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SMARTWORLD ORCHARD registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/505/237/2021/73. The register’s record shows an end date of 31 Oct 2023. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for SMARTWORLD ORCHARD?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2023. Its registration runs to 31 Oct 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SMARTWORLD ORCHARD?From the records · Map pin and road lines, read 6 Sep 2026

SMARTWORLD ORCHARD is in Sector 61, Gurugram; the site address declared to HARERA is Sector -61, Gurugram Manesar Urban Complex, Gurugram, Haryana.. In a straight line it is about 5.1 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SMARTWORLD ORCHARD?From the records · HARERA, read 4 Nov 2026

SMARTWORLD ORCHARD is a Suposhaa Realcon project, registered by its company SUPOSHAA REALCON PRIVATE LIMITED.

The source ↗Suposhaa Realcon's projects and court record

The records

What the registers hold for SMARTWORLD ORCHARD: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/505/237/2021/73: Registration lapsed. The register’s record shows an end date of 31 Oct 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 68 OF 2021 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 15 Sep 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Sep 2021.Declared to HARERA, read 29 Oct 2026
The court record of Suposhaa Realcon’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Oct 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 68 OF 2021 validity ended

    Named in this project’s application. Valid to 15 Sep 2026. The register links a completion certificate (LC-IX), dated 3 Sep 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 23 HARERA files, with the dates we read them
Registration no.
GGM/505/237/2021/73
Registration valid till
31 Oct 2023
Declared possession
31 Oct 2023

Declared by the promoter to HARERA

Land area
20.60902 (Acre) (83,401.74 sq m)
FAR
0 proposed
licence
68 of 2021 dated 16.09.2021
Estimated project cost
₹303.53 crore
Cost of land
₹247.11 crore
Layout plan, declared approved (field 5a)
16 Sept 2021
Construction to start
1 Oct 2021
Completion declared for
31 Oct 2023
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (16 Sept 2021)
  • II. LAYOUT PLAN — declared: already been obtained (16 Sept 2021)
  • III. FOREST NOC — declared: already been obtained (5 Apr 2013)
On file with HARERA · 23 files

On file with HARERA (23)

Plans

Site plan

1 file
Approved Site Plan28 Oct 2021

Layout plan

3 files
A-1 Layout Plan22 Nov 2021A-5 Layout & Demarcation22 Nov 2021Latest Layout Plan28 Oct 2021

Services

Sewerage and drainage

2 files
Service Plan Storm Water8 Oct 2021Service Plan Sewer8 Oct 2021

Water supply

1 file
Service Plan Water8 Oct 2021

Electricity

2 files
A-3 Street Light Plan22 Nov 2021Street Light Plan28 Oct 2021

Roads

1 file
Service Plan Road8 Oct 2021

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule8 Oct 2021LC-IV8 Oct 2021LOI8 Oct 2021

Land records

Land records

3 files
A-4 Non Encumbrance Certificate22 Nov 2021Non-Encumbrance Certificate28 Oct 2021Revenue Record Entry of Licence and Collaboration12 Oct 2021

Money

Accounts and finance

4 files
A-6 CA Certificate- Non-Default of Payment22 Nov 2021Cashflow22 Nov 2021Non-Default Certificate from a CA28 Oct 2021Demand Drafts12 Oct 2021

The promoter’s papers

Declarations and affidavits

3 files
A-2 Affidavit-10 Percent Land Transfer22 Nov 2021Affidavit-10% Land Transfer28 Oct 2021The Promoter’s Declaration on Affidavit13 Oct 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

68 OF 2021 · SUPOSHAA REALCON PVT. LTD. · GURGAON-MANESAR

Licence valid to 15 Sept 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Oct 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

68 OF 2021: 39 parcels, 20.609 acres in all, in Ulahwas (hadbast 83) and Behrampur (hadbast 80), tehsil Wazirabad.

The licence register prints the same licensed area, 20.609 acres.

  • 10//15/11 kanal 3 marlaUlahwas (83)
  • 10//168 kanalUlahwas (83)
  • 10//178 kanal 18 marlaUlahwas (83)
  • 10//25/1/1/22 kanal 3 marlaUlahwas (83)
Show the other 35 parcels
  • 11//111 kanal 5 marlaUlahwas (83)
  • 11//1210 marlaUlahwas (83)
  • 11//192 kanal 4 marlaUlahwas (83)
  • 11//207 kanal 8 marlaUlahwas (83)
  • 10//1817 marla 4 sarsaiUlahwas (83)
  • 9//168 kanalUlahwas (83)
  • 10//111 marlaUlahwas (83)
  • 10//13/213 marlaUlahwas (83)
  • 10//207 kanal 8 marlaUlahwas (83)
  • 11//143 kanal 2 marlaUlahwas (83)
  • 11//156 kanal 1 marlaUlahwas (83)
  • 11//168 kanalUlahwas (83)
  • 11//178 kanalUlahwas (83)
  • 11//248 kanalUlahwas (83)
  • 11//258 kanalUlahwas (83)
  • 12//21/16 kanal 10 marlaUlahwas (83)
  • 12//22/14 kanal 13 marlaUlahwas (83)
  • 11//188 kanal 2 marlaUlahwas (83)
  • 11//238 kanal 1 marlaUlahwas (83)
  • 12//101 kanal 5 marlaUlahwas (83)
  • 12//11/11 kanal 8 marlaUlahwas (83)
  • 12//11/216 marlaUlahwas (83)
  • 12//129 kanal 12 marlaUlahwas (83)
  • 12//193 kanal 9 marlaUlahwas (83)
  • 12//209 kanal 5 marlaUlahwas (83)
  • 12//23/1/14 marlaUlahwas (83)
  • 10//103 marlaUlahwas (83)
  • 10//112 kanal 2 marlaUlahwas (83)
  • 17//13/1/12 marlaBehrampur (80)
  • 17//9/22 kanal 4 marlaBehrampur (80)
  • rectangle 68, kila 68/2/11 kanal 2 marlaUlahwas (83)
  • rectangle 68, kila 68/2/43 kanal 3 marlaUlahwas (83)
  • rectangle 68, kila 68/2/811 kanal 12 marlaUlahwas (83)
  • rectangle 323, kila 323/1-3/31 kanal 9 marlaUlahwas (83)
  • rectangle 322, kila 322/22 marlaUlahwas (83)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Ulahwas (hadbast 83) or Behrampur (hadbast 80), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Oct 2021

Layout plan

3 files
A-1 Layout Plan22 Nov 2021A-5 Layout & Demarcation22 Nov 2021Latest Layout Plan28 Oct 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (23 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1750 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Suposhaa Realcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.