Splendor Spectrumone
by Splendor Buildwell · Sector 58, Gurugram
Not on our price list yet
Possession 20 Nov 2018 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 58, Gurugram6.5 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- SPLENDOR BUILDWELL PVT. LTD.the company that filed it, for Splendor Buildwell
- 7 Dec 2017Registered with HARERAHARERA, read 4 Nov 2026
- 20 Nov 2018Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2018Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings2,847 m² · 40%
- Roads1,300 m² · 18%
- Pavements1,200 m² · 17%
- Other uses605 m² · 9%
- Parking563 m² · 8%
- Green belts550 m² · 8%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningCentralized
- Lifts5NOS & 4NOS (T-D) (T-B)
- FloorsGranite/tile
- WallsPlaster & paint
- BathroomsW.C, urinal, W.B
- Windows6MM/8MM
- Main door10MM glass
- Electrical fittingsModuler
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)6.5 km
- Delhi–Gurugram–SNB RRTS7.5 km
- Dwarka ExpresswayOpen, 17 Aug 202511.6 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Oberoi | Same sector | — | — | 31 Dec 2033 | |
| Oberoi | Same sector | — | — | 31 Dec 2033 | |
| Oberoi | Same sector | — | — | 31 Dec 2033 | |
| Oberoi | Same sector | — | — | 31 Dec 2033 | |
| Oberoi | Same sector | — | — | 31 Dec 2033 | |
![]() | Oberoi | Same sector | New launch | ₹35,000/sq ft | 31 Dec 2033 |
No photo of the project on file yet | Suposhaa Realcon | 1.3 kmto its sector’s point | — | — | 30 Jun 2026 |
No photo of the project on file yet | Suposhaa Realcon | 1.3 kmto its sector’s point | — | — | 31 Oct 2023 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Splendor Spectrumone registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 376 OF 2017, registered on 7 Dec 2017. The register’s record shows an end date of 31 Dec 2018. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Splendor Spectrumone?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 20 Nov 2018. Its registration runs to 31 Dec 2018; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Splendor Spectrumone?From the records · Map pin and road lines, read 6 Sep 2026
Splendor Spectrumone is in Sector 58, Gurugram; the site address declared to HARERA is Sector 58. In a straight line it is about 6.5 km from Sohna Elevated Corridor (NH-248A), 7.5 km from Delhi–Gurugram–SNB RRTS and 11.6 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Splendor Spectrumone?From the records · HARERA, read 4 Nov 2026
Splendor Spectrumone is a Splendor Buildwell project, registered by its company SPLENDOR BUILDWELL PVT. LTD..
The source ↗Splendor Buildwell's projects and court recordThe records
What the registers hold for Splendor Spectrumone: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 376 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 31 Dec 2018. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
- Registration no.
- 376 OF 2017
- Registration date
- 7 Dec 2017
- Registration valid till
- 31 Dec 2018
- Declared possession
- 20 Nov 2018
Declared by the promoter to HARERA
- Land area
- 7064.60 (Sqr/mtrs)
- FAR
- the application prints 250, which is not a ratio
- licence
- 82 OF 21010 DT.12.10.2010
- Estimated project cost
- ₹99.33 crore
- Cost of land
- ₹18.46 crore
- Construction to start
- 7 Feb 2014
- Completion declared for
- 20 Nov 2018
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. REVISED BUILDING PLAN — declared: already been obtained (19 Apr 2018)
- II. AAI — declared: already been obtained (25 Apr 2018)
- III. FIRE — declared: already been obtained (14 Jan 2014)
- IV. ENVIRONMENTAL CLEARANCE — declared: already been obtained (12 Jul 2013)
- V. CONSENT TO ESTABLISH — declared: already been obtained (1 May 2018)
- VI. OC — declared: already been obtained (6 Sept 2019)
On file with HARERA · 9 files
On file with HARERA (9)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared 82 OF 21010 DT.12.10.2010. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type. See the collector rates for Sector 58.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1268 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Splendor Buildwell
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.