PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14)
by Sare Gurugram · Sector 92, Gurugram
Not on our price list yet
Possession 31 Dec 2030 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
- Carpet area
- about 1,240 sq ft
In m²
about 115.2 m², the average flat, as declared - Registered by
- SARE GURUGRAM PRIVATE LIMITEDthe company that filed it, for Sare Gurugram
- 21 Oct 2011Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 15 Feb 2012Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking2.253 acres · 21%
- Pavements2.044 acres · 19%
- Parks and playgrounds1.494 acres · 14%
- Roads1.162 acres · 11%
- Apartment buildings0.998 acres · 9%
- Club house0.88 acres · 8%
- Land for community services, handed to the government0.603 acres · 6%
- Other uses0.484 acres · 5%
- Green belts0.301 acres · 3%
- Sewage and waste treatment0.198 acres · 2%
- Electricity sub-station0.133 acres · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenVitrified tile OBD flush door
- Lifts16 lifts
- FloorsVirtified tiles ceramic KOTA stone
- WallsVirtified tiles ceramic
- BathroomsVitrified tile OBD flush door
- WindowsPowder coated ALUM/CLEA NING glass SMM
- Main doorSKIN door
- Electrical fittingsCopper wire1.5 SQ MM 5 PAIR wirecoaxialcablecopper wire copper wire 4 SQ MM
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
- Delhi–Gurugram–SNB RRTS5.2 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Signature Infrbuild | Same sector | — | — | 31 Dec 2023 | |
No photo of the project on file yet | GLS Infraprojects | Same sector | — | — | — |
No photo of the project on file yet | Ramprastha Sare Realty | Same sector | — | — | — |
Parkwood Westend Phase-INo photo on file yet | Parkwood Infrastructure | Same sector | — | — | — |
No photo of the project on file yet | Nani Resorts and Floriculture | Same sector | — | — | 27 Feb 2024 |
No photo of the project on file yet | Ramprastha Sare Realty | Same sector | — | — | — |
No photo of the project on file yet | Sare Gurugram | Same sector | — | — | — |
No photo of the project on file yet | Sare Gurugram | Same sector | — | — | 31 Mar 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14) registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/766/498/2023/110. Valid to 31 Dec 2030.
The source ↗What is the possession timeline for PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14)?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2030. Its registration runs to 31 Dec 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14)?From the records · Map pin and road lines, read 6 Sep 2026
PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14) is in Sector 92, Gurugram; the site address declared to HARERA is Sector-92. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14)?From the records · HARERA, read 3 Nov 2026
PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14) is a Sare Gurugram project, registered by its company SARE GURUGRAM PRIVATE LIMITED.
The source ↗Sare Gurugram's projects and court recordThe records
What the registers hold for PHASE-III PART - 2 - (BLOCK T5 - TOWER T6, T7, T8, T9, T10, T11, T12) & (BLOCK T4 -TOWER T14): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/766/498/2023/110: Registered. Valid to 31 Dec 2030.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 68 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 20 Jul 2015.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 21 Oct 2011, building plans 15 Feb 2012.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 68 OF 2011 lapsed
Named in this project’s application. Valid to 20 Jul 2015; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
- Registration no.
- GGM/766/498/2023/110
- Registration valid till
- 31 Dec 2030
- Declared possession
- 31 Dec 2030
Declared by the promoter to HARERA
- Land area
- 10.55 (Acre) (42,694.34 sq m)
- FAR
- the application prints 175, which is not a ratio
- licence
- 44 of 2009 (12-08-2024), 68 of 2011 (20-07-2024)
- Estimated project cost
- ₹26.99 crore
- Cost of land
- ₹9.96 crore
- Layout plan, declared approved (field 5a)
- 21 Oct 2011
- Building plans, declared approved
- 15 Feb 2012
- Construction to start
- 1 Apr 2022
- Completion declared for
- 31 Dec 2030
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 513 units · 59,086 sq m carpet · 8 towers · total for 513 flats, about 115.2 m² each
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. BUILDING PLAN — declared: already been obtained (15 Feb 2012)
On file with HARERA · 48 files
On file with HARERA (48)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
13 filesFloor plans
3 filesServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileRoads
1 fileService plans
3 filesApprovals and clearances
DTCP licence
2 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
2 filesLand records
Land records
3 filesMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
3 filesCompany papers
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
44 OF 2009 · SA Infratech · GURGAON-MANESAR
Licence valid to 13 Aug 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
68 OF 2011 · SA Infratech · GURGAON-MANESAR
Licence valid to 20 Jul 2015
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Apr 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
44 OF 2009
DTCP’s page showed no land schedule for licence 44 OF 2009 when Bhumiq read it on 18 Oct 2026. verify at source
68 OF 2011: 13 parcels, 7.0438 acres in all, in Wazirpur (hadbast 115) and Meoka (hadbast 121), tehsil Harsaru.
The licence register prints the same licensed area, 7.04 acres.
- 91//12/11 kanal 8 marlaWazirpur (115)
- 91//12/28 kanalWazirpur (115)
- 91//138 kanalWazirpur (115)
- 91//148 kanalWazirpur (115)
Show the other 9 parcels
- 91//17/23 kanal 19 marlaWazirpur (115)
- 91//188 kanalWazirpur (115)
- 91//198 kanalWazirpur (115)
- 91//203 kanal 14 marlaWazirpur (115)
- 91//21/18 marlaWazirpur (115)
- 91//8/112 marlaWazirpur (115)
- 91//9/29 marlaWazirpur (115)
- 8//3/25 kanal 12 marlaMeoka (121)
- 91//3/35 marlaWazirpur (115)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village you want: Wazirpur (hadbast 115) or Meoka (hadbast 121), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 91//12/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
13 filesFloor plans
3 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2418 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Sare Gurugram
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.