SIGNATURE GLOBAL CITY 92-2

by Signature Infrabuild India · Sector 92, Gurugram

Not on our price list yet

Possession 30 Mar 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
Registered by
SIGNATURE INFRABUILD PVT. LTD.the company that filed it, for Signature Infrabuild India
Timeline
  1. 28 Jun 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 27 Oct 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Mar 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 28 Mar 2026Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8.313 acres in all, by use
  • Plots for sale5.009 acres · 60%
  • Apartment buildings2.475 acres · 30%
  • Parks and playgrounds0.579 acres · 7%
  • Electricity sub-station0.136 acres · 2%
  • Other usesas the form names them: Area under twenty four MTR road0.114 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 92, GurugramSector 92, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Delhi–Gurugram–SNB RRTS5.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL CITY 92-2 registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/664/396/2023/08. Ended 28 Mar 2026. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL CITY 92-2?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Mar 2024. Its registration runs to 28 Mar 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL CITY 92-2?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL CITY 92-2 is in Sector 92, Gurugram; the site address declared to HARERA is Village Mevka, Wazirpur, Sector-92, Gurugram. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL CITY 92-2?From the records · HARERA, read 3 Nov 2026

SIGNATURE GLOBAL CITY 92-2 is a Signature Infrabuild India project, registered by its company SIGNATURE INFRABUILD PVT. LTD..

The source ↗Signature Infrabuild India's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL CITY 92-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/664/396/2023/08: Registration expired. Ended 28 Mar 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 81 OF 2022 is on the DTCP register, valid to 23 Jun 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Jun 2022, building plans 27 Oct 2022.Declared to HARERA, read 29 Oct 2026
The court record of Signature Infrabuild India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 28 Mar 2026. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
Registration no.
GGM/664/396/2023/08
Registration valid till
28 Mar 2026
Declared possession
30 Mar 2024

Declared by the promoter to HARERA

Land area
8.3125 (Acre) (33,639.49 sq m)
FAR
0 proposed
licence
81 of 2022 dated 24.06.2022
Estimated project cost
₹111.18 crore
Cost of land
₹54.59 crore
Layout plan, declared approved (field 5a)
28 Jun 2022
Building plans, declared approved
27 Oct 2022
Construction to start
1 Jan 2023
Completion declared for
30 Mar 2024
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE NO. 81 OF 2022 — declared: already been obtained (24 Jun 2022)
  • II. FOREST NOC — declared: already been obtained (23 Feb 2022)
  • III. WATER NOC — declared: already been obtained (9 Sept 2022)
  • IV. SWERAGE NOC — declared: already been obtained (12 Sept 2022)
  • V. LAYOUT — declared: already been obtained (28 Jun 2022)
  • VI. LOI — declared: already been obtained (31 Dec 2021)
  • VII. ZONING — declared: already been obtained (14 Oct 2022)
On file with HARERA · 22 files

On file with HARERA (22)

Plans

Site plan

1 file
Approved Site Plan2 Dec 2022

Layout plan

3 files
Layout Plan Sewer Layout12 Jan 2023Layout Plan Water Supply12 Jan 2023Latest Layout Plan2 Dec 2022

Zoning plan

1 file
Zoning Plan12 Jan 2023

Demarcation plan

2 files
Demarcation Plan12 Jan 2023Superimposed Demarcation12 Jan 2023

Building plans

1 file
Approved Building Plans, Full Set2 Dec 2022

Services

Sewerage and drainage

1 file
Layout Plan Storm Water12 Jan 2023

Electricity

2 files
Electricity Supply Plan12 Jan 2023Street Light Plan12 Jan 2023

Roads

1 file
Layout Plan Road Layout12 Jan 2023

Service plans

1 file
Service Plans on the Layout2 Dec 2022

Approvals and clearances

Completion certificate (CC)

1 file
Completion certificate uploaded4 Aug 2026

DTCP licence

1 file
Licence Copy with Land Schedule2 Dec 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration12 Jan 2023

Money

Accounts and finance

3 files
Non-Default Certificate from a CA2 Dec 2022Cash Flow Statement2 Dec 2022CA Certificate on the Application’s Figures2 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit12 Jan 2023

HARERA’s orders

HARERA’s orders

1 file
Extension No. 13 of 2024 dated 01.07.20249 Jul 2024

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/08 of 2023/7(3)/80/2025/22 Dated 13.08.202514 Aug 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

81 OF 2022 · SIGNATURE INFRABUILD PVT. LTD. · GURGAON-MANESAR

Licence valid to 23 Jun 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

81 OF 2022: 25 parcels, 8.3125 acres in all, in Meoka (hadbast 121) and Wazirpur (hadbast 115), tehsil Harsaru.

The licence register prints the same licensed area, 8.3125 acres.

  • 2//15/13 kanal 12 marlaMeoka (121)
  • 2//15/24 kanal 2 marlaMeoka (121)
  • 2//16/1min1 kanal 3 marlaMeoka (121)
  • 2//16/2min3 kanal 19 marlaMeoka (121)
Show the other 21 parcels
  • 2//25/13 kanal 11 marlaMeoka (121)
  • 3//11/12 kanal 18 marlaMeoka (121)
  • 3//11/210 marlaMeoka (121)
  • 3//11/310 marlaMeoka (121)
  • 3//11/48 marlaMeoka (121)
  • 3//11/57 marlaMeoka (121)
  • 3//11/6min2 kanal 9 marlaMeoka (121)
  • 3//12/111 marlaMeoka (121)
  • 3//12/2min7 marlaMeoka (121)
  • 3//12/3min4 marlaMeoka (121)
  • 3//12/4min7 marlaMeoka (121)
  • 3//12/5min1 kanal 19 marlaMeoka (121)
  • 3//18/2/13 kanal 13 marlaMeoka (121)
  • 3//19/21 kanalMeoka (121)
  • 3//19/26 kanal 2 marlaMeoka (121)
  • 3//20min6 kanal 5 marlaMeoka (121)
  • 3//21/13 kanal 11 marlaMeoka (121)
  • 3//23/28 kanalMeoka (121)
  • 7//3/13 kanal 7 marlaMeoka (121)
  • 90//146 kanalWazirpur (115)
  • 90//7/21 kanal 15 marlaWazirpur (115)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Meoka (hadbast 121) or Wazirpur (hadbast 115), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 2//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Dec 2022

Layout plan

3 files
Layout Plan Sewer Layout12 Jan 2023Layout Plan Water Supply12 Jan 2023Latest Layout Plan2 Dec 2022

Building plans

1 file
Approved Building Plans, Full Set2 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2229 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Infrabuild India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.